A STUDY ON CONSTRUCTION CONTRACTS AND PAYMENT METHODS IN CM AT RISK SYSTEM -APPROACH WITH ESTABLISHING CONTEXT OF GMP-CM SYSTEM -

  • JeaSauk Lee (Dept. of Architectural Engineering, Dankook University) ;
  • JaeYoul Chun (Dept. of Architectural Engineering, Dankook University)
  • Published : 2005.10.16

Abstract

When we compare CM system with Design Bid Build system, we can see two striking features in CM system. First, CMr participates in construction team along with Owner, Designer and Constructor. The newcomer can change boundaries of function and responsibility. Second, Compatibility through each phase and Objectivity of decision-making become more important, because relation among stakeholders changes from a rectilinear to a network. However, it is not clear how the risk of completion is reasonably treated. So we have to think about the relations between Owner and CMr, CMr and Specialist Contractor from a point of trade risk. This paper covers them.