Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

건설기획단계에서의 위험요인 도출 (An Extraction of the Risk Events in the Construction Planning Phase)

  • 권순오;김선규;이낙운
    • 산업기술연구
    • /
    • 제25권B호
    • /
    • pp.99-106
    • /
    • 2005
  • The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.

  • PDF

해외 화공플랜트 건설사업 위험요인 영향도 분석 (A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects)

  • 조승연;김용수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 2부
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안 (Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase)

  • 이재현;정재욱;정재민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

건설 공정리스크 관리도구 개발 및 활용방안 (The Development and Application of Schedule Management Tools in Building Construction)

  • 정우준;윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.384-387
    • /
    • 2004
  • 건설프로젝트 참여자들이 전체공기에 영향을 미치는 공정리스크 관리에 대한 중요성을 공감하고 있지만 그에 대한 관리 절차 및 도구 등이 체계화되어있지 않아 어려움을 겪고 있다. 또한 발생한 리스크에 대한 대응방안 및 관리방법에 대한 연구는 비교적 활발히 추진되었지만 시공단계의 리스크를 착공 전 단계에 파악하고자 하는 노력은 부족하였다. 따라서 본 연구에서는 건설프로젝트 전체공기에 중요한 영향을 미치는 착공 전 단계에서의 공정 리스크 관리업무를 지원하기 위하여 공사프로세스 중심의 리스크 분류체계와 전산시스템 구축을 위해 요구되는 코드체계 및 공정리스크에 대한 사전대비를 위한 공정리스크 검토양식을 개발하고, 이에 대한 활용방안을 제시하고자 한다.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

BIM을 이용한 건설리스크 해결 가능성 도출 (Identifying Potential Opportunities of BIM for Construction Risk Management)

  • 원종성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발 (A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project)

  • 주해금;김선규
    • 한국건설관리학회논문집
    • /
    • 제4권2호
    • /
    • pp.109-117
    • /
    • 2003
  • 건설사업은 그 규모와 복잡성으로 인하여 다른 산업에 비해 위험에 대한 노출수위가 크고, 그 형태도 다양하다. 따라서, 건설사업에서 위험을 인지하고 대응하는 일련의 위험관리 과정은 정확하고 체계적으로 수행되어야 한다. 위험관리 과정에서 위험인지 단계는 다양한 위험요인의 인지와 그 위험의 성격을 규정하는 단계이고. 이러한 위험인지 단계에서 위험분류체계는 사업에 내재된 다양한 위험을 인지하게 해주는 유용한 도구이다. 본 연구에서는 기존 위험분류체계의 문제점을 개선하고 재정립함으로서, 실질적인 건설사업에서 위험인지 도구로서 활용될 수 있는 사업단계별, 계약주체별 체크리스트를 제안하였다.

AN EFFECT ANLYSIS OF RISK FACTORS FOR BUILD TRANSFER LEASE PROJECTS

  • Yang-Woo Lee;Soo-Yong Kim; Jung-Man Jung;Dae-Young Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.498-508
    • /
    • 2007
  • The Build-Transfer-Lease (BTL) projects have rapidly increased under the Government support during recent years. This paper presents the risk analysis of factors affecting BTL projects in the initial phase. This study resulted in 10 significant risk factors influencing on each phase of BTL projects and then factors were grouped into each phase. The sensitivity analysis was also performed to identify risk factors with more significant influence on BTL projects. The results may useful to practitioners in order to cope with risks in initial phase of BTL projects. The paper resulted in the distribution of risks to project parties, thus it can be used as standards for risk assignment to competent authorities and private enterprises of BTL projects.

  • PDF

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF