• 제목/요약/키워드: Construction year

검색결과 1,493건 처리시간 0.076초

표준시장단가 공고시기 조정에 따른 영향분석 연구 (Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

제4차 건설기술진흥기본계획 성과평가체계 분석에 관한 연구 (An evaluation system analysis of 4th master plan for Improvement of Construction Technology)

  • 이두헌;이교선;손태홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.177-180
    • /
    • 2012
  • Korean government has developed and implemented a five-year master plan in order to enhance construction technology competitiveness and its level of development. However, without detailed assessment of past plans it is not likely to retain feasibility and sustainability of a new five-year plan, This study analyses adequacy of the 4th five-year master plan in terms of evaluation strategies such as indicators, methods, targeted performance through benchmarking various construction policies utilized by developed countries. In addition, this manuscript provides the basis structure and critical factors for establishing future construction policies or plans.

  • PDF

건설현장 말비계 재해예방 실태조사와 개선에 관한 연구 (A study on the accident prevention survey and improvement of the horse scaffolding in the construction site)

  • 정성춘;이로나
    • 대한안전경영과학회지
    • /
    • 제18권2호
    • /
    • pp.37-46
    • /
    • 2016
  • Due to increased demand for remodeling and repair in construction market in recent year, the usage of horse scaffold is increasing in the indoor finish works. Injuries related horse scaffold are mainly caused by poor installation or of careless handling of scaffold. Approximately 300 workers are injuried at construction site every year, it is accounting for about 1.5% of the total construction sector and has increased on a year-to-year trends. But the main contents between national standards and speccifications related to the manufacture and usage of horse scaffolds are mutually inconsistent, In particular, the rules on occupational safety and health standards are the basis for the prevention of industrial injuries, there is no explicit application being made to the horse scaffold commonly used on construction sites. The purpose of this study was to analye the manufacture and usage situations in order to reduce construction injuries that occur at the horse scaffolds. It will be utilized the results of the analysis as the basis data for unifying the major domestic standards and specifications associated with the manufacture and usage of horse scaffold.

Global Construction Competitiveness Evaluation in 2016

  • Park, Hwanpyo;Han, Jaegoo
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.1-7
    • /
    • 2017
  • Korea's domestic construction market and overseas construction order environment are experiencing a decreasing trend, and this trend is expected to continue. Therefore, domestic construction companies are seeking to enter the global construction market. This study analyzes the global construction market and the global competitiveness for global construction companies and provides the results. To this end, this study has developed a model to evaluate the global construction competitiveness level and to evaluated global construction competitiveness in 2016. The evaluation of global construction competitiveness was analyzed based on the competitiveness of construction infrastructure by country, and the evaluation results of competitiveness of construction companies. These assessments were based on 20 detailed international statistics (ENR, Global Insight, Compass, etc.). The evaluation results are as follows. First, in regard to the comprehensive global construction competitiveness by country, America ranked first among 20 countries, followed by China. European countries like Spain, Germany and the Netherlands ranked third to fifth, respectively. Korea ranked sixth, one rank higher than that of the previous year. America and European countries remain strong. Second, in regard to the comprehensive building infrastructure competitiveness by country, America ranked first followed by Germany. Korea ranked twelfth, which is the same rank as that of the previous year. When it comes to stability in the construction market, China ranked first and Korea eighth. For construction systems, Sweden ranked first and Korea thirteenth, and for infrastructure, Japan ranked first and Korea tenth. Third, according to the construction company's capability evaluation by country, America ranked first followed by China. Korea ranked fourth, two ranks higher than that of the previous year because of its building competitiveness (fifth → fourth) and design competitiveness (eleventh → eighth) which has improved. When it comes to building competitiveness, China ranked first and Korea fourth. For design competitiveness, America ranked first and Korea eighth, and for price competitiveness, India ranked first and Korea seventh. However, Korea is still in the middle of the pack rank among the 20 countries considered when it comes to design competitiveness. It is ranked eleventh for design productivity and thirteenth for foreign sales against the total sales (internationalization). Thus, Korea needs to improve technical power and tap into new markets for improved competitiveness, including increased productivity. To do so, more R&D investment is required.

  • PDF

철도기술 연구개발 중장기계획수립($2008{\sim}2012$)결과와 정책적 시사점 (The Mid-long Range R&D Planning of Railway Technology and Policy Recommendations)

  • 박만수;박수동;유성윤;김종욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1796-1816
    • /
    • 2007
  • Recently, started to apply a strategy of selection and concentration in the construction and transportation R&D for the effective utilization of limited R&D resources. The department of construction and transportation planned the construction and transportation R&D innovative road map by the future 10 years technical requirement under the first year on the innovation of the construction and transportation technology from last year. The innovative road map which is a strategic and long term master plan integrated a construction and transportation suggested a vision as value createar for a improvement of living quality in the future. And made a specific goal that is the seventh construction technology level and the fifth transportation technology level in the world. The department of construction and transportation is planning a mid- long range planing of the construction and transportation R&D as following measurement of innovative road map. KICTEP and KISTEP planned a mid- long range R&D planing of the transportation system, logistics, aviation, railway for the last year. Introducing a methodology used a mid- long range plan and main results of the future railway R&D plan. And suggesting a politic comments for the effectively propelling railway R&D projects.

  • PDF

초고층 주상복합 건물의 하자 발생 유형 및 분석 연구 (The analysis of defects types and patterns in high-rise residential buildings)

  • 서장우;강경인
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

공동주택 건축공사의 공종별 폐기물의 종류와 발생원인 분석 (An Analysis of Classification and Causes for Construction Waste of Apartment Building Projects)

  • 서종민;김선국
    • KIEAE Journal
    • /
    • 제7권5호
    • /
    • pp.127-133
    • /
    • 2007
  • Each year the amount of construction wastes increases at a rapid pace. Particularly, wastes from apartment housing projects that make up 89.14% of the total construction projects have increased about 48% as compared with those of the year 2000. Construction wastes are therefore rising as an issue related to environmental problems and disposal costs. And there are ongoing studies of the disposal, control and recycling of construction wastes. Mitigation measures for the wastes, however, have been a rare subject of research that focuses on waste-generating factors by activity during apartment housing projects. Given that, the purpose of this study was to categorize construction wastes by work type and to identify the factors causing wastes in order to reduce them. This study investigated the amount of the wastes from apartment housing constructions by activity as related to disposal costs, and examined causes in the ordering, transport, material management and construction stage, respectively. The analysis results will likely bring about expectation effects that help reduce the generation of the wastes by establishing action plans.

키워드 분석을 통한 국내 드론 연구 동향 분석 (Keyword Analysis of Drone Research in Domestic Construction Industry)

  • 강우탁;이승연;김민지;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.43-44
    • /
    • 2021
  • As drone technology advances, the cases of using drones in the construction industry are increasing rapidly. Research by the Ministry of Trade, Industry and Energy, has shown that drone use in the construction sector is expected to expand the fastest, and research has been carried out continuously to utilize drones in the construction industry. In this way, we will identify drone research trends in the construction industry as a basic data that will provide direction for future research. This paper collected papers for 10 years from 2011 to 2020 and keyword analysis through Gephi 0.9.2. This paper was classified by the study details of the paper with the upper keywords by year, through which it analyzed the changes in the direction of the study by field. The data in this paper is designed to contribute to the development of balanced drone utilization research, despite the limitations of 10-year statistics.

  • PDF

건설장비와 농기계에서 배출되는 연도별 대기오염 배출량 변화추세 (Annual Trends of Air Pollution Emission from Construction and Agricultural Equipments)

  • 신문기;김호정;장영기;홍지형
    • 한국대기환경학회지
    • /
    • 제19권6호
    • /
    • pp.805-810
    • /
    • 2003
  • The annual air pollution emissions from construction and agricultural equipments were estimated from 1987 through 2000. The annual numbers and operation hours of 5 major construction equipments (Excavator, Bulldozer, Loader, Fork lift, Crane) and 3 major agricultural equipments (Power Tiller, Agricultural Tractor, Combine) were investigated for emission estimation. And monthly variation factors of operation hours of construction equipment were investigated too. The NO$_{x}$ emission from construction equipment have been gradually increased since 1987 to 1997, but sharply decreased as -45% in 1998 due to economic crisis in Korea. The NO$_{x}$ emission was estimated as 64,300 ton/year from construction equipment, and as 23,300 ton/year from agricultural equipment in 2000.000.