The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction (초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로)

  • Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work (보도용 블록포장 유지보수 공사 원가산정기준 개정 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF

Requirement Analysis for Development of SMART Beam Form (SMART 보 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.70-71
    • /
    • 2014
  • The structural work is the main process of building construction which influence on the time, cost, safety and quality. The form work is one of the main process which has from 20 to 30 percentage of structural work. Especially the form work for beams is complex and need more manpower compared with form work for column or slab. When the existing forms such as plywood form, steel framed wooden form and aluminum form, is used for form work of beam, it would result in the cost overrun caused by needs of lots of manpower and resources. Therefore, the aim of this study is analysis of the requirement for development of SMART beam form. The result of this study shall be used for the development of SMART form work system.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

Task-Visual Information Map to Develop AR Navigators of Construction Equipment (건설장비 AR 네비게이터 개발을 위한 작업-시각정보 맵 도출)

  • Song, Sujin;Kang, Hojun;Kim, Hanbeen;Moon, Taenam;Shin, Do Hyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.116-124
    • /
    • 2016
  • Work efficiency of earth work which is one of the main works occurring in construction site mainly depends on the performance of individual operators of earth work equipment. Consequently, the skill of individual operators of earth work equipment can significantly affect overall construction schedules. Many invisible areas inevitably exist in construction site because of the nature of construction site where occlusions occur from structures being built, installed or moving equipment, moving workers, etc. The lack of visual information regarding tasks critically impedes the effective performance of operators of earth work equipment. AR (Augmented Reality) is a computer technology that superimposes virtual objects onto the real world scene. This characteristic of AR may address the lack of visual informations in earth work process, thus helping to improve the work efficiency of operators of earth work equipment. The purpose of this study is to present a task-visual information map that identifies visual informations required in tasks of earth work and which of the tasks are suitable for AR technology. This study focuses on visual informations in tasks of earth work with excavators. The map was created based on the investigations on the problems of each task of earth work with excavators and visual informations required to address the problems. Through the map, four visual informations were found to be suitable for AR technology to improve the work efficiency of excavator operators. Based on the findings of this study, AR systems for excavators can be developed more effectively.

Development of Standard Work Type to Utilize Drone at Expressway Construction Sites (고속도로 건설현장에서 드론 활용을 위한 표준공종 개발)

  • Lee, Suk Bae;Jeong, Min;Auh, Su Chang;Kim, Jong Jeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.461-468
    • /
    • 2021
  • The role of drones is increasing day by day in smart construction that manages construction sites with 3D data in every life cycles. This is because both the digital surface model (DSM) and the orthoimage obtained for the construction site through the drone are made of point cloud data. This study aims to develop standard work types for drone use in order to systematically utilize drones in expressway construction sites. For the study, two expressway construction sites in Korea were set as test beds, and construction types applicable to drones were derived and verified through a pilot project. As a result of the study, three construction work types were developed for road planning, road design and maintenance, respectively, and in road construction, twenty-one detailed construction types were developed for five construction work types. It is expected that drones can be used more systematically not only at expressway construction sites, but also at other road construction sites by utilizing the "standard work type at expressway construction site for drone use" developed in this study.

Performance Elements for Schedule Compression in Slab Form Work for High-rise Buildings (초고층 바닥거푸집 공사 공기단축을 위한 현장 요구 성능도출)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.167-170
    • /
    • 2010
  • In tall building construction, It is important to reduce construction duration of slab form work. Therefore, the purpose of this study is to assess the required performance for reduction of construction duration in slab form work of tall buildings. We surveyed the required performance and their degrees of importance and economical efficiency through the interview and questionnaire survey by related experts. This study proposes the guideline to develop improved formwork system for reduction of construction duration.

  • PDF

Competency-Based Career Management System Plan for Construction Manager (건설사업관리자의 역량기반 경력관리체계 구축 방안)

  • Jung, Seo-Young;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).