• Title/Summary/Keyword: Construction validity

Search Result 706, Processing Time 0.032 seconds

A Study on the Track Layout Criteria for the Light Rail Transit with Rubber Wheel (경량전철 고무차륜용 선로선형기준에 관한 연구)

  • 오지택;한승용;이안호;윤태양
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.447-452
    • /
    • 2001
  • This paper proposes the track layout criterion for the LRT(light rail transit). All criterions established concerning dimension and performance of LRT vehicles with rubber wheel. Using theoretical approach, adaptation and validity of criterions are verified. Especially, it were modified according to change of vehicle performance that criterions proposed previous version Proposed criterions may provide a standard scheme for design and construction of the track layout on LRT.

  • PDF

Proposal of the Track Layout Criterion for the Light Rail Transit (경량전철 선로선형기준에 대한 제안)

  • 오지택;한승용;윤태양;성택룡
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.111-118
    • /
    • 2000
  • This paper proposes the track layout criterion for the LRT(light rail transit). All criterions established concerning dimension and performance of LRT vehicles that are three types. Types of vehices are AGT(automated guided train) steel wheel. AGT rubber tire and LIM(linear induction motor). Using theoritical approach, adaptation and validity of criterions are verified. Proposed criterions may provide a standard scheme for design and construction of the infrastructure on LRT.

  • PDF

A Study on the Evaluation of Welding Residual Stress of Pipeline in Power Plants by Indentation Methods (연속압입시험법에 의한 발전용 배관 용접부의 잔류응력 평가)

  • 이상국;길두송
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.212-214
    • /
    • 2004
  • It is widely recognized that the residual stress of weldment affects steel construction and causes fracture initiation of welded structures. It is necessary to know since the power plants adopt a variety of welding processes distribution and magnitude of residual stresses. Therefore the purpose of present study is to investigate the validity of the indentation method to measure residual stresses of steel plates by residual stresses measured form the specimens of hot reheater pipes, cold reheater pipes and feed water lines used in power plants.

  • PDF

A Study for the Application of High-Strength Concrete (고강도 콘크리트의 실용화를 위한 연구)

  • 이장화;유영찬;민병렬;김긍환
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1991.10a
    • /
    • pp.140-145
    • /
    • 1991
  • Tests were conducted to get a mix proportioning of high strength concrete between σ28 and (C/W) using low quality materials easily purchased in situ. Superplasticizer was used as a chemical admixture to compensate low slump of base concrete keeping it up about 15±2㎝. General material properties such as modulus of elasticity, poisson's ratio, unit weight and stress-strain characteristic of high strength concrete were obtained. Test results show that mix proportioning of high strength concrete proposed in this paper have reasonable validity and these can be used as a design criteria in high strength concrete construction.

  • PDF

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

The Analysis on the Validity of Recycling of Vertical Protective Nets Used in Construction Sites (건설현장에서 사용된 수직보호망의 재활용 타당성 분석에 관한 연구)

  • Cho, Hyun-Dae;Jaung, Jae-Dong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.479-488
    • /
    • 2018
  • The issue of waste and its recycling is perceived as a worldwide environmental problem, and the plastic waste is perceived as the biggest social problem threatening the lives of mankind. The vertical protective net, manufactured by using the plastic resin is vertically installed on the outside in case of formwork at the construction site, in order to prevent the fallen objects and scattered dusts. The objective of this study is to understand the actual use status of vertical protective net in the construction site, to examine the changes in the environment-related regulations recently strengthened in the construction site, and also to improve the field technicians' perception of it. And based on it, this study aims to suggest the measures for using the rational and environment-friendly materials and also for promoting the recycling of vertical protective net as the vertical protective nets made of plastic resin are thoughtlessly used in the construction site.

A Study on the Prediction Model of the Warship Construction Period through Statistical Analysis (통계적 분석기법을 통한 함정 건조기간 예측모델에 관한 연구)

  • Choi, Daewook;Ma, Jungmok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.497-502
    • /
    • 2020
  • For the Navy to acquire the desired vessels in time, it is necessary to plan the schedule accurately for warships. On the other hand, until now, there has been only a subjective prediction of the period of warship construction through a survey by a group of experts. No academic studies have been conducted based on actual data. Therefore, this study presents a model for predicting the construction period of a warship through linear regression based on actual data. Experts first identified the factors that can affect the warship construction period. Actual data of the factors were collected, and regression analysis was performed to estimate the ship construction period. As a result, the key factors selected that influence the construction period of a ship were the number of operational test items, number and type of equipment, and the number and type of R&D equipment. The resulting regression model revealed 96.5% accuracy in terms of internal validity.

A case Study on Collapse Causes and Restoration of Retaining Wall with Vegetated Concrete Block (식생블록 옹벽의 붕괴원인 및 복구방안에 관한 사례 연구)

  • Hong, Gigwon;You, Seung-Kyong;Yun, Jung-Mann;Park, Jong-Beom;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.105-115
    • /
    • 2016
  • This paper describes a restoration of retaining wall, which was collapsed by rainfall. The failure causes was analyzed by field case, and then the countermeasure was suggested. The failure causes confirmed that observance of design and construction criteria was insufficient. It also was the climate condition like a rainfall and inappropriate construction management. The stability analysis for retaining wall, soil improvement and reinforced earth wall was conducted to confirm validity of the countermeasure. The analysis results showed that the suggested construction method satisfied in required safety factors. Therefore, it should be secured the stability of the structure based on the application of appropriate design method and construction management, when structure was constructed.

A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions (경계조건 분석을 통한 LCCBS 연계방안)

  • Jeong, Jae-Hyuk;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.321-332
    • /
    • 2013
  • Costs and expenses are intertwined and incurred throughout an entire construction project, even from the pre-construction phase, and each phase has a different impact on the life cycle cost (LCC). However, the cost breakdown structure (CBS) is different in each phase of a building construction project, which makes it hard to reasonably calculate construction cost. For this reason, the boundary conditions were analyzed in this study based on the life cycle cost break structure (LCCBS). In addition, breakdown factors were analyzed based on the boundary conditions to derive a linkage method. The validity of the linkage method was verified through application to actual construction projects. Through the analysis, it was found that the problem of items being left out was reduced by more than 97.2 percent, and the work was done an average of 6 hours faster compared to the conventional method. It is expected that by applying the new LCC system, LCC will be both reduced and calculated in a more efficient manner.

Estimation of Key Risk Management Factors for Construction Projects Based on Kano Model (Kano 모델 기반 건설프로젝트 핵심 리스크관리 요인 도출)

  • Cho, Jin-ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.239-248
    • /
    • 2022
  • Risks in construction projects are increasing remarkably due to recent changes in the construction environment. Active risk management is required to recognize risks as opportunities. The purpose of this study is to propose a risk management model of the importance determination method through comparative analysis using Kano model, Timko CSC (Customer Satisfaction Coefficient), and ASC (Average Satisfaction Coefficient). Based on previous studies, the validity of risk management factor determination is reviewed through a questionnaire modified Kano model through interviews with working-level workers using the Delphi technique. Through this, a suitable risk management model is presented by selecting key risk management factors recognized by domestic construction project practitioners. As a result of the study, the Kano model developed to verify risk management of construction projects was evaluated to be effective in verifying the risk management of practitioners. It is expected that the Kano model presented in this study will be actively used to verify the importance of risk management for construction projects.