• Title/Summary/Keyword: Construction types

Search Result 3,457, Processing Time 0.026 seconds

Analysis of Construction Types Causing Secondary Defects in Apartment Buildings (공동주택의 2차 하자 유발공종 분석)

  • Huh, Yung-Chul;Ju, Jae-Hyun;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.74-75
    • /
    • 2019
  • There are certain types of construction that produces many defects during the construction of apartment buildings. It may be due to construction errors in the type itself, but more often, it is due to defects derived from other types of construction. Thus, to reduce such secondary defects and prevent fundamental defects in particular types of construction, academic research on the types of construction causing secondary defects should be actively conducted. In addition, as claimed in this study, the industries should work harder to improve the quality of the type of construction that causes secondary defects, rather than just trying to improve the ostensible problems. If the efforts of each sector are backed up, the disputes over defect repair in apartment building construction will reduce in general, which in turn will lead to a reduction in national loss within the construction industry.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Analysis of Business Implementation Strategy and Construction Management Techniques in Spearheading Overseas Expansion

  • Park, Kyungrog;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.472-476
    • /
    • 2015
  • The purpose of this study is to fully understand the present state of the domestic construction companies, and to analyze phased business types and construction management techniques in order to initiate overseas expansion. Because of the recession in the domestic construction market, a thorough and strategic perspective to constantly develop inroads into overseas market is required. So we carried out a questionnaire survey targeting the experts of the overseas construction and researcher, and consulted them in depth. The questionnaire survey was divided into three sections. The first section is the necessity of overseas construction and the reason. The second is the overseas business types classified into the way of advance in short-term and long-term phase possibility of expansion. Lastly, the importance of the phased construction management techniques and the current capacity of the domestic and the foreign business trends were scrutinized. On the basis of the consultation and surveys, we analyzed the overseas business types and the construction management types in the short-term and long-term phase.

  • PDF

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

Basic Research to Establish a Key Performance Indicator(KPI) System of Earthworks during Construction Project (건설공사 중 토공사의 핵심 지표 체계(KPI) 구축을 위한 기초연구)

  • Jung, Yong-Il;Lee, Chanwoo;Kang, Kyung-In;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.85-86
    • /
    • 2021
  • KPI, an indicator that measures the performance of factors that contribute to achieving strategies of individuals or organizations, is used a lot to analyze the performance of construction work. Construction work consists of individual construction types with different characteristics such as progress method, scale, and input resources, but currently, KPIs for performance analysis of individual construction types are lacking. Therefore, this study aims to obtain and analyze data for establishing construction performance analysis KPIs during construction work to prepare the basis for the creation of future construction KPIs. Preliminary KPIs for earthwork performance analysis selected through this study are expected to be the basis for deriving preliminary KPIs for other individual construction types.

  • PDF

Workload and Productivity during Work from Home (WFH) for the Construction Workforce

  • Wu, Hongyue;Chen, Yunfeng
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.492-499
    • /
    • 2022
  • A large number of employees shifted to Work from home (WFH) due to the COVID-19 pandemic, including the construction workforce. The changes in workload and productivity due to WFH impact the work performance and economic outputs of companies. However, there are mixed results about the impacts of WFH on workload and productivity. In particular, limited studies focused on specific types of work of different occupations in the construction workforce. This study aims to explore the impacts of WFH on workload and productivity considering different types of work for the construction workforce in the U.S. After identifying three main occupations and five types of work, an online survey (N = 69) was distributed. Descriptive analysis showed that participants had less workload (0.82 hours/week) and lower productivity (9.69%) during WFH. Three occupations had varied changes due to the different types of work. Analysis of Variance (ANOVA) indicated that there was no significant difference in workload, while productivity was decreased during WFH. In particular, the productivity of project-related work and communication and documentation decreased significantly. Overall, participants finished 2.85% less workload per week during WFH. The findings provide an insight into WFH in the construction workforce, which improves future remote or hybrid work arrangements in the construction industry.

  • PDF

A Study on the Analysis of Causes for Fatal Accident in Construction Works (건설공사의 중대재해 원인분석에 관한 연구)

  • 박종근
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.122-133
    • /
    • 1997
  • Various types of fatal accidents are increasing in Korean construction work site. Simply repeated and conventional accidents as well as new types of potential hazards which are caused by large-scaled work, complexity and negligence of temporary structures in construction are increasing, so that analysis of fundamental causes are necessary to control the construction accidents. In this study 739 fatal accidents are informally classified by the types of work and work process. The classified items which are based on ANSI Z 16.2, are modified adapted to the construction fields and are given code numbers and are analyzed by the data-base program. The exact causes of various types of accidents are analyzed by the accident types, agencies and hazardous conditions and through the Cross-tabulation method in order to find out the cause between relevant accidents.

  • PDF

Site mitigation plan for Different types of Construction noises (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.490-494
    • /
    • 2014
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is almost noise from construction site is high level and some kinds of noise levels are over 100dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans are developed to reduce different types of construction noises and it is applied in site and evaluated noise reduction performance in this study.

  • PDF

A Study on the Selection of High-Risk Construction Types for Safety Management on Construction Projects (건설공사 안전관리를 위한 고위험 공종 선정에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.137-138
    • /
    • 2022
  • Construction work has potential risk factors in the process. Therefore, the safety management task is very important and requires continuous management. In particular, the importance of safety management in construction projects has been highlighted recently with the introduction of the act on punishment of serious disasters. In this perspective, this study intends to select and present high-risk construction types that requires safety management. The presented result is expected to present standards for systematically performing safety management of construction projects.

  • PDF

Derivation of Key Safety Management Factors by Construction Process through Cross-Tabulation Analysis between Accident Types and Objects (건설공사 공종별 사고유형 및 사고객체 교차분석을 통한 중점안전관리항목 도출)

  • Yoo, Nayeong;Kim, Harim;Lee, Chanwoo;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.127-128
    • /
    • 2022
  • The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.

  • PDF