AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

A study on hazard rate decrease plan in plant construction site by improving foreman's role (플랜트 건설현장의 작업반장 역할개선을 통한 위험율 저감방안 연구)

  • Eun, Nam-Gwon;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.33-44
    • /
    • 2015
  • Domestic plant construction sites have a tendency to become bigger, more various and complicated. Moreover frequency of industrial incident is increasing due to short project period, coexistence work condition and using heavy construction equipment. Installing safety facilities and safety training contribute to prevent incident. But mostly incident happens due to workers' unsafe action and wrong work method. Technically, it is very difficult for us to closely manage workers preventing incident. Therefore, the role of foreman who ordinarily works together with his workers is considered more important. Specific execution plan was drawn through industrial incident statistics from Ministry of Labor and questionnaire survey to interest parties(supervisor, safety staff and foreman). If foreman has raised sense of belonging and responsibility by conducting practical safety training for his workers, manages job site and receives proper compensation for these roles, it will be expected that it fully influences incident decrease.

Construction Workers Fall Accidents from Scaffolding in Gaza Strip

  • Enshassi, Adnan;Shakalaih, Sobhi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.65-69
    • /
    • 2015
  • The aim of this paper is to identify and rank the main causes of fall accidents from scaffolding according to their relative importance as perceived by project managers and site engineers in construction projects in the Gaza Strip. A total of 50 questionnaires were distributed to project managers and site engineers, 35 questionnaires were received yielding 70% response rate. A total of 33 factors that cause fall accidents in scaffolding were identified through a literature review and consolidated by a pilot study. These factors were categorized into six groups: factors related to erection, factors related to the staff (Scaffolders), factors related to loads, factors related to the personal safety, factors related to the workers behavior, factors related to the personal competencies. The results indicated that factors related to the workers behavior are the major factors that caused fall accidents from scaffolds. The results revealed that the top ranked factors which caused falls accidents from scaffolding were: absence of personal protective equipment (PPE), missing ladders, wind loads, disguised the design code, lack of proper assembly or inspection, overhead tools and materials, climbing and neglect using ladders, lack of guardrails, missing bracing and working during fatigue. These findings would help contractors to understand the top factors that caused fall accidents so that they can take them into consideration in safety planning in order to minimize the possibility of their occurrences.

  • PDF

A Study on Local Three-Dimensional Visualization Methodology for Effective Analysis of Construction Environments in Extreme Cold Regions (효과적인 극한지 건설환경 분석을 위한 현지 3차원 가시화 방안 연구)

  • Kim, Eui Myoung;Lee, Woo Sik;Hong, Chang Hee
    • Spatial Information Research
    • /
    • v.20 no.6
    • /
    • pp.129-137
    • /
    • 2012
  • For construction project in extreme cold region, it is essential to establish basic data on the site such as topographical data from the early stage of construction of planning and designing, and it is needed to frequently perform site investigation when necessary. However, extreme cold regions are characteristic of being at long distance and difficult in approaching, and special regions such as Antarctica, in particular, are hard to conduct site investigation. Although a site investigation may be conducted, those who can visit Antarctica are sufficiently limited so that most of the staff may participate in construction without knowledge of the site and increase the risk of errors in decision making or designing. In order to resolve such problems, the authors in this study identified methods of building wide-area topographical data and bedrock classification data of exposed areas via remote sensing and of building precise topographical data on the construction site. Also, the authors attempted to present methods by which such data can be managed and visualized integrally via three-dimensional GIS technology and all the participants in construction can learn sense of field and conduct necessary analysis as frequent as possible. The areas around the Jangbogo Antarctic Station were selected to be the research area for conducting effective integrational management and three-dimensional visualization of various spatial data such as wide-area digital elevation model, ortho-images, bedrock classification data, local precise digital elevation model, and site images. The results of this study may enable construction firms to analyze local environments for construction whenever they need for construction in extreme cold regions and then support construction work including decision making or designing.

Analysis and improvement plan for job stress relief activities of technical personnel in architectural design offices -based on staff- (건축 설계사무소 기술인력의 직무스트레스 해소활동 분석 및 개선방안 -사원을 중심으로-)

  • Cho, Sang-Hyeok;Gil, Min-Wook;Ahn, Jong-Hyeok;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.125-126
    • /
    • 2022
  • Office workers at the architectural design office are under job stress for various reasons such as excessive working hours, friction with the site, and unpredictability of work. This can increase not only the negative image of office workers in the construction industry, but also the avoidance of young manpower in the future. This study investigated the specific purpose of each activity as a problem of job stress relief activities in the architectural design office, and the specific purpose and goal setting of each activity as a way to improve job stress relief activities.

  • PDF

Satisfaction Level of Construction Quality Management by Survey of The Field Staffs (현장 실무자 대상 조사에 의한 건설공사 품질관리 관련 만족도에 관한 고찰)

  • Park, Hyeong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.34-45
    • /
    • 2009
  • In domestic, the Quality Management system of construction work has been compounded of the association of regulation which is ground for relevant law and operation of Quality Management system by ISO/KS A 9001(QMS) established by the contractor. Two quality guaranteed systems must be operated with complementary and integrated system, but we can not make full use of QMS of contractor and only run routinized quality management system in all construction project by the standard, methods, process provided in the law. These problems were demanded better condition in the past ten years, since the ISO standards have been introduced. Establishing preventive consideration of quality management by setting a goal of drastic quality guarantee is an urgent problem of construction industry. This study is quick to fellow, which should do three things. 1. The attitude survey related quality management of staff in charge in construction site has run. 2. Base on these results, we adjust satisfaction measurement about operation of construction quality management system. 3. Subsequently, we want to offer our thesis about advanced opinion for the next.

A Study on the Safety System Improvement for Preventing Fall Accidents during Frame Construction in Apartment Sites (아파트 현장 골조공사 떨어짐 사고 예방을 위한 Safety System 개선에 관한 연구)

  • Chun, Byoung-Jo;Shin, Dongil Peter
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.39-48
    • /
    • 2021
  • In the past, measures for the reduction of industrial accidents has led the safety and health policy of construction sites by the guidance, supervision and the regulation according to 「Occupation Safety and Health Act」 handled by Ministry of Employment and Labor (MOEL). Nowadays companies realize that due to the factors such as diversification of employment types, outsourcing of hazardous work, new construction method and complicated types of construction, etc., there is a limit on safety management for construction sites as far as it is passively led by the governmental safety management policy and regulation. In this study, in order to practice the autonomous safety management escaping from the government-led safety management, improvement plans are proposed and applied by analyzing the basic cause of the all kinds of fall accidents that could possibly occur in the apartment construction sites and by verifying the hazardous factors and risks by fields.

A Study on the Establishment of Facility Guidelines for Infectious Diseases Hospitals - Focusing on Operational Methods and Architectural Planning (감염병전문병원의 시설 가이드라인에 관한 연구 - 운영방식과 건축계획을 중심으로)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.28 no.2
    • /
    • pp.17-29
    • /
    • 2022
  • Purpose: In terms of efficiency and safety, this study attempted to organize data on the operation methods and architectural planning of infectious diseases hospitals. Methods: The results obtained through on-site and interview surveys with hospital officials and medical staffs at four infectious diseases hospitals under construction were summarized based on those original business plans and facility guidelines. Results: First, the operational methods to secure safety and operational efficiency were summarized for each department which are major hospital functions of infectious disease hospitals. Second, as the architectural planning, the characteristics of space and circulation of each department are summarized. For safety of medical staff, negative pressure and non-negative pressure zone have to completely separated. In addition medical staff wears PPE and enters the negative pressure zone and returns in the order of admiral, shower, and gowning in the PPE undressing room after patient treatment. In case of operational efficiency, flexible operation is required in normal and crisis situations. For example, it is important for The Ward to gradually switch to negative pressure beds in times of crisis from normal situation and the outpatient department considers the composition of negative pressure and non-negative pressure outpatient spaces that can operate in parallel even in crisis situations. Implications: Infectious disease hospitals require flexible operation and appropriate facilities for normal and crisis situations.

Finalized the 'International Science Business Belt' (국제과학비즈니스벨트' 종합계획 확정)

  • Choo, Seung-Hwan
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.2
    • /
    • pp.54-60
    • /
    • 2009
  • On January of this year, the 29th National Science and Technology Council, presided by President M.B. Lee, officially finalized a contract for a big project to build an International Science and Business Belt(ISBB) that includes the establishment of a new institute, the Asian Basic Science Institute (ABSI) and the construction of a Rare Isotope Accelerator. The government will inject more than 3.5 trillion Wan into the ISBB project. The investment to build the care laboratory for the project, the heavy ion accelerator, the first one in Korea, will be 460 billion Wan, Korea thus aiming to build an accelerator with world-class performance. This will be the sixth in the world. The construction will start from 2012, and is planned to finish by 2015. ABSI, whose construction will be finished by 2012, is planned to be a care laboratory with 3,000 scientists and staff. To. attract world class researchers and other professionals from aver the world, the project includes the creation of a new city with a superb educational, cultural environment, and comfortable living environment for an international community. The site for this new science and business city, "scientific ecosystem", has not been officially decided yet, and supposed to be announced in the first half af this year.

  • PDF

A study on the moving picture transmission method between the accident sites and control center (사고현장과 사령실간 화상전송기술에 관한 연구)

  • 장석각;조봉관
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.484-489
    • /
    • 2002
  • Whenever the accidents occur in the railway areas, their prompt recovery is very important. The individual way has been used to resolve these accidents by direct visiting the site and reporting to others who cares for these cases. As a result, we are planning to operate the MTS (Moving picture Transmission System) for a timely information's transmission to the related peoples in the central control center by transforming the picture information on the accident-site to the digital information. The proposed system is not a transmission system using exclusive lines, but utilizing the existing railway computer network. We construct a network server device so that a dispatcher can easily connect with the server through the railway intranet. In some railway environments such as disturbed field situations and geographical condition(in tunnels and bridges, etc) building up the wired network is difficult. Solving this problem, we reviewed the wireless network. Finally we proposed the mixed wireless network that is able to cover the wired network. We then installed and tested the wired network and wireless network respectively in wayside of a railway field. Through the testing, we identified many detailed matters for some network construction approaches to the control room and many field device-connecting schemes. This research will contribute to minimize the number of staff dispatched to a disturbed field, decrease the accident recovery time and improve the quality of service to the passenger.

  • PDF