• Title/Summary/Keyword: Construction site operation

Search Result 298, Processing Time 0.025 seconds

A Study on Effectiveness of Technical Consulting System for Accident Prevention in Construction Work (건설업 재해예방 전문지도제도의 실효성 연구)

  • Park Hai-Chun;Park Jun-Ho;Kim Hyun-Woo;Park Jung-Sik;Kim Hun-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.1
    • /
    • pp.65-84
    • /
    • 2006
  • This study was to suggest the necessity of depth research in order to enhance the effectiveness of technical consulting system. And the purpose of this study was to decrease the construction accidents to some extent, being on the increase day by day as it takes issue properly and suggest a reform measure. As for research method, it executed the collection of public opinions widely and questionnaire with the bibliography, expert of construction safety, the related institutions, academic world, safety association, and director of construction site. Also, it was to suggest the reform measure by the stage, classifying the problems on the system and operation by 4 stages like a stage of delivery of subscription and supervision, a stage of contract with guidance of technology, a stage of executing the guidance work of technology, and a stage of performance of advice.

Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work (마감공사 생산성 향상을 위한 리프트 카 최적배치 모델)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

Greenhouse Gas Management Policy during Construction Execution Phase -Focused on Green Building Rating Systems and Japanese Case- (건축물 시공단계에서의 온실가스 배출 관리 방안 -국내외 친환경 인증제도와 일본 현장의 대응 방안을 중심으로-)

  • Song, Sang Hoon
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.139-150
    • /
    • 2010
  • Until now, the eco-friendly construction (green construction) has been focused on reducing environmental impacts in use(operation and maintenance) phase. Considering the environmental influence along the life cycle of construction project, the impact in execution phase is rather lower than that in use phase. However, that impact is thought to be greatly decreased by well-organized activities. Based on its urgency and requirement for timely action, this study aimed to discuss the greenhouse gas (GHG) reduction plan in execution phase from a broad perspective. To achieve this purpose, the green building rating systems in domestic and foreign countries have been reviewed, and the practice in Japan was investigated. In order to improve current on-site greenhouse gas management, the integration among construction phases, participants, and environmental factors, and institutional supports are required as well as the contractor's efforts.

Proposal of improvement measures according to the limiting factors of the use of drone technology : Cases in the construction field

  • Yoo, Soonduck
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.4
    • /
    • pp.30-38
    • /
    • 2021
  • This research explored methods for improvements to be made within the field of drone usage within the construction industry based on an investigation of factors which limit their efficiency and productivity. Limiting factors and improvement measures were presented in terms of technology, service, law and policy for employing drones at construction sites. Our first suggestion is, from a technical point of view, that companies need to expand professional manpower and infrastructure for systematic management. Second, in terms of service expansion, it is necessary to have management capabilities for operation such as the use of drones with enhanced safety and reinforced on-site education and personal information management. Third, in terms of legal and institutional support measures, it is necessary to prepare a plan for reforming the legal system for revitalization and to expand the training of professional manpower. This study may contribute not only to the development of drone technology, but also to effectively respond to various problems that appear at construction sites.

Accident Analysis of Second Daegu Subway Line During its Construction Period (대구지하철 2호선 건설공사 중 발생한 사고분석)

  • Lee, Yong-Tae;Shin, Sung-Heon;Son, Byung-Chang
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.138-147
    • /
    • 2005
  • The accidents which occurred between during february of 1997 to December of 2004 at the 2nd Daegu subway construction site have been classified. The accident types of injuries include accidental falls, falling objects which consist 53.4% of all accidents. This result is higher than the same types of accidents occurring at construction sites which are 46.3%. It was found that the 3.4 times more accidents are caused from safety measures and working methods than problems caused by lack of supervision. 78.0% of the accidents occurred at stations and at the ventilation area. 31.9% of the accidents occurred when the operation was near completion($81.0%{\sim}100.0%$) which means there was pressure to complete the operation to meet the set due date. In the case of 50.0% of the accidents were caused by workers with less than two month work experience. And lumbago is 6.9%, especially lumbago didn't showed before. Maybe accident should increase if not reduce a possibility of danger. In this study a literature search has been conducted for the cause of these accident types and respective suggestions are provided.

A Technical Analysis of Real Time Location System for Automation in Construction (건설작업 자동화를 위한 실시간위치추적시스템 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.15-18
    • /
    • 2009
  • Due to its high dependency of manpower, construction work has several difficulties in terms of quality control, imbalance of supply and demand of qualified manpower, safety management for them and improvement of production. Such problems related to the management can be at some degree solved by introducing an automation facility. Since the unique environment of a construction site in the past was not structured, it is very hard to introduce a facility to automate construction work from operation of the equipment to assignment of where to work. This is a preliminary research for automation of construction work. In this study, the trend of development of a cutting-edge technology, RTLS, was researched and analyzed in order to review the possibility of utilizing RTLS in construction work and present a control mechanism for construction equipment. Although the presented mechanism is at the concept stage, which still has lots of restrictions to be solved, the application of the RTLS will be very much feasible. That is, if linkage of the study between the RTLS and the automation of construction is built, it will be expected to contribute to many fields such as cost reduction through efficient and systemic management, the reduction of construction period and precise construction as well as raising the level of the automation of domestic construction work.

  • PDF

Enhancing On-Site Construction Machinery Handling through 3D Spatial Gesture-Based Trajectory Interpreter Modeling

  • Du LI;Ying WANG;Hung-Lin CHI
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.629-636
    • /
    • 2024
  • In construction projects, the safety and productivity of machinery operations are of paramount importance. Contemporary research and industry endeavors predominantly concentrate on equipping machine operators with sensory information and establishing a comprehensive situation-aware operating environment, such as virtual reality-based machine manipulation training. However, significant limitations exist in direct information exchange and processing by on-site personnel. Notably, research on analyzing communication patterns in construction machinery operations remains scarce despite its critical role in preventing hazardous instructions/actions and enhancing machinery work efficiency. Thus, this research aims to (1) develop a novel interpreter modeling system predicated on millimeter-wave radar technology and (2) select the crane as an illustration to investigate the potential applications of this emerging communication paradigm during construction machinery operations. In this investigation, a spatial gesture signal interpreter was devised specifically for machine operators and signalers to augment the quality of communication during the execution of spatial localization tasks. Corresponding limitations that will be encountered in current communication systems were also addressed. This research uses a 60 GHz millimeter wave radar as a gesture trajectory detector, with the benefits of portability and robustness. Its millimeter-level precision enables the capture of highly accurate micro-gestures. The research constructs a novel 3D Spatial Gesture-based Trajectory Modeling system, which will be compared with traditional communication models in future research stages.

A Experimental Study of Rock Fragmentation with Plasma Method (플라즈마 공법에 의한 암석파괴의 실험적 연구)

  • Yoon, Ji-Son;Kim, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.27-35
    • /
    • 2002
  • For the excavation of the rock, blast method is put into operation in most of the construction site in Korea. In comparison to other methods of excavation, blast method has many merits such as improvement in efficiency in operation, reducement of operation period, and etc. However, blast operation also creates much loss due to the blast vibration, noise, and fly rocks. Thus, in this study, we have examined main features, rock fragmentation effect and the application of plasma method the one of shallow vibration method. In this study, the attenuation exponent of blast method operated in the site was 1.39~1.40 and that of the plasma method was analysed to be 1.45~2.23. From the location where the distance between excavation location and observation location was over 15 m, most of excavation vibration were measured to be less than 0.2 kine(cm/sec), which is also the allowed standard value of sensitive buildings, such as cultural assets and computer facilities. According to the result of FFT(Fast Fourier Transform) analysis, the frequency measured through blast method in this site was 30~50 Hz and the frequency of plasma method ranges in between 30~130 Hz.

  • PDF

The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

Development of Construction Technology for Noise Abatement System on Urban Railway (도시철도 소음저감시스템 시공기술 개발)

  • Ryu, Jae-Kwang;Min, Jun-Ho;Kim, Hyo-San;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2860-2865
    • /
    • 2011
  • Recently, the number of passengers using urban railway has been increased by reasons of the reductions of car use due to high fuel prices and the enlightenment about the environment. Above all, the noise and the vibration coming from the friction between the wheel and the rail of trains in operation which is not only a factor that hinders riding comforts but causes civil complaints. Furthermore, the noise has become social issues from tightening the relevant regulations by the government since January 2010. Although ballasted tracks were constructed on urban railways at the time of opening, they have been changed into slab tracks because slab tracks require much less maintenance. However, in view of sound absorptivity of track, slab tracks have 10 times less capability than ballasted tracks(ballasted track : 0.5~0.6/slab tracks : 0.06) results more noise than that of ballasted tracks as much as 3dB(A) since slab tracks emit more reflection noise. Therefore, in order to minimize reflection noise on slab tracks, noise abatement system has been developed as a national R&D program to apply on-site test. It is assumed that the construction technology developed in this study can be used not only as basic data for the on-site test for the noise reduction in urban railway but as an efficient construction method.

  • PDF