• Title/Summary/Keyword: Construction site operation

Search Result 298, Processing Time 0.032 seconds

Evaluation of Train Running Safety for Direct Fixation Concrete Track on Light Rapid Transit (경전철 직결식 콘크리트 궤도구조의 열차주행안전성 평가)

  • Choi, Jung-Youl;Kim, Jun-Hyung;Chung, Jee-Seung;Lee, Sun-Gil
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.41-46
    • /
    • 2017
  • The coefficient of derailment and the rate of wheel load reduction were used as the index of train running safety that was directly affected the train derailment safety. In aspects of track, the train running safety depends on the complex interaction between wheel and rail, and the track-vehicle conditions (i.e., the curvature, cant, track system, vehicle speed and the operation conditions, etc). In this study, the relationship between the train running safety and the track curvature and vehicle speed for direct fixation concrete tracks currently employed in Korean light rapid transit was assessed by performing field tests using actual vehicles running along the service lines. The measured dynamic wheel load, lateral wheel load and lateral displacement of rail head were measured for same train running on four tested tracks under real conditions, which included curved and tangent tracks placed on the tunnel and bridge, thus increasing the train speed by approximately maximum design speed of each test site. Therefore, the measured dynamic track response was applied to the running safety analysis in order to evaluate the coefficient of derailment, the rate of wheel load reduction and the track gauge widening at each test site, and compare with the corresponding Korean train running safety standard. As the results, the lateral track response of direct fixation concrete track appeared to increase with the decreased track curvature; therefore, it was inferred that the track curvature directly affected the train running safety.

Current Condition and Prospect of On-Site Domestic Wastewater Treatment Technologies (합병정화조 기술현황 및 전망)

  • 임연택
    • Proceedings of the Membrane Society of Korea Conference
    • /
    • 1998.06a
    • /
    • pp.95-112
    • /
    • 1998
  • Water quality in the public water course has been polluted more seriously than ever before due to the increase of the number and aremount of pollution sources such as domestic and industrial wastewater. For water quality conservation, the Korean government has been trying to construct sewage treatment facilities continually, of which treatment capacity reached to 11,452,400m$^{3}$/day in 1996. Night soil treatment facilites of m nationwide have the treatment capacity of 24,038m$^{3}$/day. But water quality has not been improved because the sewer systems were insufficient and the treatment efficiencies of sewage were not high, enough. For renovation of water quality, miscellaneous domestic wastewater must be treated because 27g BOD/day out of total 40g BOD/person-day come from miscellaneous wastewater, comparing to 13g BOD/day from night soil. However, sole treatment purifier treat only night soil from the flushing toilet. Therefore, it may be desirable to treat the miscellaneous domestic wastewater and the night soil from flushing toilet together by joint treatment purifier system as on-site domestic wastewater treatment technology. In Korea, the joint treatment purifier system, introduced in 1997, have the benefit as follows; i) good water poiluion control effect, ii ) good effect on river water flow, iii) water pollution control with sewage treatment facility, and iv) rapid pollution control effect, etc. In order to achieve a good effect as stated before, i ) strengthening effluent guideline including BOD, nitrogen and phosphorus, ii ) specializing operation to maintain high performance, and iii) supporting its construction and maintenance costs by the governmental level may be necessary: In addition, automation system of joint treatment purifier, technology for its package and compactness, and a new bio-media bio-filter with higher capacity should be further developed in agreement with a more stringent effluent guideline.

  • PDF

Analysis of Working Time at the Test Site of Southwest Offshore Wind Project in Korea Based on Weather Window (기상조건에 따른 서남해 해상풍력 실증단지 작업시간 분석)

  • Kim, Min Suek;Kim, Ji Young;Kwak, Ji Yeong;Kang, Keum Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.27 no.5
    • /
    • pp.358-363
    • /
    • 2015
  • As a preparation process for successful establishment of demonstration offshore wind farm, analyses have been made for working time at the construction site where working time is defined as the time available for marine operation to take place under given weather conditions. Data used are hourly wave and wind data from met mast, HeMOSU-1, and 3 hour numerical model data from Korea Meteorological Administration (KMA). Seasonal results show the minimum working time during winter and moderate during autumn and spring. The most working time was seen during summer on average. Monthly analyses show the most working time in May, June, and August which was higher than the working time in July and September. Working time reaches at steady state and no significant change was seen above wave height of 1.5 m and wind speed of 8 m/s.

Design and Implementation of Visual Filtering for Integrated Underground Map Security (보안을 고려한 지하공간통합지도의 가시화 필터링 설계)

  • Kim, Yong Tae;Park, Chan Seob
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.477-482
    • /
    • 2021
  • The integrated underground space map system provides information on infrastructure that requires security, but to prevent rupture accidents during excavation work at the underground construction site, it must provide information on all underground facilities on the site. Providing additional information other than the object of interest to the user is a factor that increases the risk of information leakage of security data. In this paper, we design the visualization filtering method that when visualizing the integrated underground space map in the field, the visualization of entire underground facilities of interest to workers is performed, but visualization of other underground facilities is minimized to minimize the risk of security data information leakage. To this end, a visualization area of a certain distance for each of the underground facilities of interest was created, and an integrated visualization filter was created with spatial union operation. When the integrated underground map is output on the screen, only the objects located within the filter area are visualized using the generated filter information, and objects that exist outside are not visualized, thereby minimizing the provision of information to the user.

A Study on the Improvement of a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 개선에 관한 연구)

  • Kim, Sung-Keun;Lim, So-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1063-1076
    • /
    • 2017
  • To improve the productivity of the earthwork, a fleet management system for construction equipment was suggested in previous studies. But there were some gaps between theory and practice. To overcome this problem, some opinions are gathered form experts and field engineers and four improvements have been proposed and reflected in the system. First, the previous system consists of one hardware module, so it is hard to install it at a control office and construction equipment at the same time. The server module for the office and the mobile module for construction equipment are separately developed. Second, the transportation algorithm that is used in the previous system can generate shortest paths for the earthwork distribution, but embankment areas are not gathered. This situation leads to a decrease in compaction productivity. A modified algorithm for earthwork distribution is suggested. Third, the automated coordinate transformation is performed to show the position of construction equipment on the 3D terrain in real-time. Fourth, construction equipment groups should be formed in the initial stage of earthwork and the number of equipment of each groups should be changed by operation status and site environment. But this functions did not work properly in the previous system. This problem is corrected in the proposed system. The improvements can make the proposed system much more realistic one and can leads to an increase in the productivity of earthwork operations.

Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method (CYCLONE 모델링 기법 개선을 통한 초고층 공사의 자재 양중 작업 프로세스 최적화 연구)

  • Hawng, Doowon;Kwon, Okyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.58-70
    • /
    • 2017
  • The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated as - is lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed.

Behaviors of Nuclear Spent Fuel Dry Storage System for Flask Dropping and Truck Collision (플라스크 낙하 및 이송차량 충돌에 대한 사용후 핵연료 건식저장시스템의 거동)

  • Song, Hyung-Soo;Min, Chang-Shik;Yoon, Dong-Yong;Chung, Hong-Jae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.95-102
    • /
    • 2005
  • Delaying and objection for the construction of storage spent-fuel disposal has prompted to consider expanding on-site storage of spent reactor fuel since it can eliminate the need for costly and difficult shipping and control of the spent fuel completely under the direction of the owner-utility. The dry storage unit developed in Canada can accommodate Korea heavy water reactor fuel elements and become a candidate for the Korean market. In this paper, finite element analysis were carried out in order to investigate the structural behavior of the nuclear spent fuel dry storage system, which is subjected to impact loads such as collision of a truck load and dropping of flask under the irregular operation.

100 kW급 용융탄산염 연료전지 발전시스템 개발

  • Im, Hui-Cheon;Kim, Do-Hyeong;Seo, Hye-Gyeong;Park, Seong-Yeon;An, Gyo-Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.140-148
    • /
    • 2005
  • The molten carbonate fuel cell (MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO (KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre - commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode, CO2 recycle, and externally reforming power generation system. The 100 kW MCFC system consisted with stacks which was made by two 50 kW sub-stacks, 90 cells with 6,000 cm2 active area and BOP including a reformer, a recycle blower, a catalytic burner, an inverter, and etc. The system has been operated from 13th of September on this year and produced 50 kW AC under atmospheric pressure condition and expected to operate by the end of this year.

  • PDF

A Study on education program for human resource development on concentrating the enterprise participation (참여기업 중심형 인력양성 교육 프로그램에 관한 연구)

  • Chae, Myeong-Suk
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.337-342
    • /
    • 2015
  • The company of 4 core materials that are needed for photovoltaic generation is located in area around this university in Gunsan, Saemangeum. And also, it was almost completed the value chain about the production of Polysilicon, Ingot, Wafer, modules and the design, construction of generation system. The industry-academy-government has understood that because of the relative companies' production and investment, it leads to a supply and demand of manpower and thus will have field centered manpower education. This program will help the problem of lack of manpower in relative companies by establishing competitive major agreement like vocational education system. Also, the university and the participating company in joint have pushed ahead field business education to make the least of industrial-education's mismatch, the training of professional manpower connected with related industries to make the universities chemical characteristics, companies securing excellent manpower and contributed to the revitalization of the regional economy. In this paper, are aware that photovoltaic industry is a future strategic industry for the country, so we will train the immediately site adapting manpower for the area of photovoltaic material and system as our goal. This is shown results of education operation for 4 years.

Risk Assessment for Hazardous Construction Work Recognized by Workers (건설위험직종 작업자의 위험체감도 평가)

  • Son, Ki-Sang;Lee, Shin-Jae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.3 s.75
    • /
    • pp.67-72
    • /
    • 2006
  • This study is to investigate the related materials such as domestic law regulation, research paper, research report, and the other material, and to suggest suitable counter measures, to find out hazard degree for its works of workers and work place through direct survey, in order to determine risk score of each hazardous work which is designated by the Government, without consideration of labour's consciousness against risk level at a site. Therefore, a new questionnaire survey related to the decision of risk level are made and distributed to find out what risk level each worker recognizes. Also, the authors tried to approach reasonable conclusions after discussing reasonability of qualification standard and improving ideas of worker at hazardous work places with worker, faculty member, H&S manager, labour union. And the results show hazard degrees by each work kind of the above: 3.75 for working with machinery, 3.7 for steel structure, 3.5 for operation of tower crane, 3.51 for retaining wall, 3.85 for form work, 3.46 for scaffolding are obtained. This quantified risk can be applied to establishing a reasonable system to keep safe against hazardous works.