• Title/Summary/Keyword: Construction site office

Search Result 122, Processing Time 0.025 seconds

A MODEL OF CONSTRUCTION WORKER'S PERCEPTIONS ON ELECTRONIC MONITORING

  • Bill L.P. Lee;Stephen Mak
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.190-195
    • /
    • 2009
  • With the growth of information and communication technologies adoption in construction projects, it could be anticipated that more property owners and construction firms will attempt to use electronic gears and gadgets for site monitoring or surveillance purposes. As the construction workers may be the major group of project team members being monitored, from managerial perspectives and for ethical reasons, it is essential to investigate their degree of acceptance on site monitoring systems. Indeed studies on office workplace monitoring suggest that a monitoring system could shape or control the behaviors of employees. With adequate refinements, their research models could be applicable in the construction industry. This paper presents a model for analyzing the antecedences that affect workers' acceptance level on electronic monitoring, and investigating if there is any behavioral change.

  • PDF

A Study on the Analysis of Risk Factors and the Reoccurrence Prevention in Construction Site Accidents (건설현장사고의 공종별 위험요소 분석 및 재발방지대책에 관한 연구)

  • Heo, Jun Kue;Choi, Mi Reu;Oh, Kwang Chin;Shin, Ju Yeoul
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.1 no.1
    • /
    • pp.16-21
    • /
    • 2018
  • The purpose of this study was to utilize 90 construction site accidents accumulated from 15 years ago by the Office of the High Level Investigation Committee of the Korea Infrastructure Safety Corporation under consignment from the Ministry of Land, Infrastructure and Transport. The construction site accident population used in this study is difficult to represent the entire construction site accident, but is considered to have statistical value as analysis data for a given size of construction site accident. The analysis is believed to be available on site as a basic data for securing construction safety and is expected to be used as a data for establishing future direction of construction safety policy.

Preliminary Study for Image-Based Measurement Model in a Construction Site (이미지 기반 건설현장 수치 측정 모델 기초연구)

  • Yoon, Sebeen;Kang, Mingyun;Kim, Chang-Won;Lim, Hyunsu;Yoo, Wi Sung;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.287-288
    • /
    • 2023
  • The inspection work at construction sites is one of the important supervisory tasks, which involves verifying that the building is being constructed by the numerical values specified in the design drawings. The conventional measuring method for inspection involves using tools or equipment such as rulers directly by the personnel at the site, and it is usually confirmed by vision. Therefore, this study proposes an model to measure numerical values on images of the construction site. Through the case study to measure the installation interval of jack supports, the proposed algorithm was verified the effiect and validity. The results of this study suggest that it can support inspection work even in the office, which may have been overlooked by on-site inspectors, and contribute to the digitization of inspection work at construction sites.

  • PDF

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

Site-Plan Types of Common Design's Goon Office Buildings and their Addition & Remodeling in Japanese Colonial Period (일제강점기 '공통형' 군청사의 배치 유형과 유형별 증·개축 경향)

  • Kim, Myungsun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7629-7634
    • /
    • 2015
  • The purpose of this study is is to organize the site-plan types of common design's Goon office buildings in Japanese colonial period based on the main building's shape and main & attached building connection way and to investigate all the types' addition & remodeling ways. The study used literature research method, analysing the digital images, the annotation of the images, official documents between the Japanese government-general of Korea and To, and articles of newspapers or journals. The site-plans are sorted 5 types and subdivided 13 as their addition & remodelling ways. The initial shapes of site-plan were changed to apply every Goon's site circumstances, The main buildings were always in the center ahead and attached buildings behind or next to them in any cases of new construction, addition or remodeling. The buildings of the common design's were constructed until early 1930s and it means that their architectural level was lower than Pu office buildings, although both had same administrational level.

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

The Development for KASS Reference Station Site (KASS 기준국 사이트 구축)

  • Cho, Sunglyong;Jang, Hyunjin;Jeong, Hwanho;Lee, Byungseok;Nam, Giwook
    • Journal of Advanced Navigation Technology
    • /
    • v.24 no.4
    • /
    • pp.273-279
    • /
    • 2020
  • In the Korea's SBAS(KASS), reference site is an important infrastructure facility for the collecting and monitoring GPS/GEO signals. The SBAS reference station has an clear requirements than other regular monitoring stations. It requires constant maintenance during the system operation. The development for KRS site should be prepared for site survey, site construction, antenna geodetic survey, equipment installation and operation. Site survey is initially performed as an important step to predict site availability and system performance. The operation center must provide the reference site, equipment room, and appurtenant to satisfy the site requirements. The position of antennas is very important information, and accuracy must be secured through the geodetic survey. Measurement collected at the from precise antenna are provided to the KASS processing station. The position of antenna should be maintained through continuous position checks and updates during the operation. When the development of the KRS site is completed, it performs tasks for installing and operating the KRS equipment. In this paper, we presented the procedures and some results for the development of the 7 KRS sites.

A Study of the Daylighting Performance in Obstructed Office Building in Urban Area (오피스 건물에서 인접건물이 자연채광 성능에 미치는 영향)

  • Park, Woong-Kyu;Ki, Hyun-Joo;Jeong, Chan-Woul;Song, Doo-Sam
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.5
    • /
    • pp.101-108
    • /
    • 2014
  • The performance of the daylighting in buildings depends on building site and shape. As an energy saving design strategy, daylighting is a key issue in green building design. In this paper, the influence of the adjacent or obstructed building on daylighting performance of the office building in urban area was analyzed. A typical office building about 20 storeys with obstructed buildings has been modeled and simulated using Radiance. The parametric simulations have been performed to analyze the influence of the daylighting performance (illuminance, luminance) of the analyzed office. The results show that the possibility of the glare was decreased when the obstructed building is located in south, also the illuminance level was significantly decreased. When the obstructed building is located in north, the changes of the illuminance level and luminance possibility were somewhat small compared to the unobstructed condition. The daylighting performance of the analyzed building was most affected by the obstructed building in winter season.