Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

공정리스크 관리를 위한 BIM 적용 방안 (BIM Utilization Plan for Schedule Risk Management)

  • 이계현;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

EVMS를 도입한 공정의 성과지수 분석 (Performance Index Analysis of Schedule Introducing EVMS)

  • 김영;이영대;김성환;김정기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.456-459
    • /
    • 2002
  • 오늘날 건설공사의 효율화를 위한 EVMS(Earned Value Management System)도입의 중요성을 인식하고 많은 연구가 발표되고 있다. 그러나 EVMS를 도입한 공정에 대한 경험부족과 국내 건설의 제도적${\cdot}$환경적 요인으로 인해서, 기술적인 분석이나 사례분석에 대한 관한 연구는 아직 미흡한 실정이다. 본 연구에서는 EVMS를 도입한 공정상에 성과지수(SPI : Schedule Performance Index, CPI : Cost Performance Index)를 산정하여, 여러 통계적 분석방법을 적용해서 프로젝트 관리상에 일정, 비용상의 추세(Trend) 및 문제의 원인을 분석${\cdot}$연구하고자 한다.

  • PDF

건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 - (The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -)

  • 서상욱;윤유상;김선국
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.177-185
    • /
    • 2005
  • 건축공사에서의 리스크 관리자들은 전체 공기에 영향을 미치는 공정리스크 관리에 대한 중요성에 대해 공감하고 있지만 그 에 대한관리 절차 및 도구 등이 체계화되어 있지 않아 공정관리에 어려움을 겪고 있다. 또한 기존의 리스크 관련 연구에서의 리스크 분류체계는 현장업무 중심으로 이루어지지 않아 실용화되기에 한계가 있다. 따라서 본 연구에서는 전체 공정에 많은 영향을 미치는 철골공사를 대상으로 공사 프로세스 중심의 리스크 분류체계와 주요 공정 리스크 요인과 연계한 업무 플로우를 제시하였고, 공정리스크 관리업무의 효율성을 제고하기 위해 공정리스크 중요도를 분석하였으며, 이를 기반으로 공정 리스크 요인별 대응방안 및 세부대책으로 이루어진 공정 리스크 관리 도구를 개발하였다.

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구 (A Study of Construction Duration Predicting Method for Mega Project)

  • 우유미;이승훈;이희덕;서용칠
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.597-600
    • /
    • 2008
  • 최근 국내에서 도심재생을 위한 입체복합공간 개발사업으로 여러 메가프로젝트가 수행중이지만, 메가프로젝트 실적 자료 및 경험, 기술부족으로 인해 여러 가지 문제점들이 드러나고 있다. 다양한 유형의 프로젝트들로 구성된 입체 복합공간 개발 사업에서 프로그램 및 프로젝트 수준으로 메가프로젝트를 관리할 수 있는 기술이 요구된다. 메가프로젝트는 다년간에 걸쳐 수행되는 사업으로 사업기간 예측과 그에 따른 공정관리가 무엇보다 중요하다. 따라서 메가프로젝트 특성에 맞는 프로그램레벨에서의 공정관리 기술 개발이 필요하다. 본 연구에서는 공정관리 기술개발의 선행연구로 사업초기단계 사업기간 예측 및 일정 계획 방법에 대해서 제시하였다. 먼저 과거 수행된 단일시설 및 복합시설의 프로젝트 속성정보와 설계 및 공사기간의 일정데이터를 수집하여, 프로젝트 기간 예측을 위한 DB의 개발방향을 제시하였다. 그리고 메가프로젝트 사업초기단계 사업기간 예측 시 영향을 미치는 발주자의 요구사항과 사업비 투입계획에 따라 시나리오를 개발하여 사업기간 예측 방법에 대해 제시하였고, CCPM을 통한 사업기간 단축가능성을 제시하였다.

  • PDF

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권2호
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

조경공사 공정관리를 위한 공정진도의 특성에 관한 연구 -주택단지 조경공사 사례를 대상으로- (A Study on the Specificity of Construction Progress for Landscape Construction Schedule Management -With regard to Landscape Construction of Housing Complex-)

  • 박원규
    • 한국조경학회지
    • /
    • 제20권4호
    • /
    • pp.93-101
    • /
    • 1993
  • The purpose of this study is to analyze th especificity of landscape construction progress in order to develop the model of landscape construction schedule management. Nine case study area in housing complex was selected and the graphic curve of the accumulative payment by landscape construction schedule was analyzed. And the results are as follows: The graphic curve of common construction progress is S-curve but that of landscape construction progress is parabolic-curve, because landscape construction concentrally progress in last period of construction schedule. And particularly parabolic-curve seems to rise up suddenly in the last period when landscape construction amount is small.

  • PDF