Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.