• Title/Summary/Keyword: Construction regulations

Search Result 748, Processing Time 0.025 seconds

Comparative Analysis of Deaths due to Precipitation in the form of Construction Site (건설현장의 강수형태별 사망사고 비교·분석)

  • Lee, Kang-Hyup;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.206-207
    • /
    • 2015
  • Due to the nature of construction industry which is labor-intensive and outdoor mobile production industry, climatic changes work as a major factor affecting construction period and safety accident. In Korea, changes in the amount of precipitation are more severe than those in climate. In addition, climatic changes are also shown as a change in precipitation form. Thus, this study aims to provide baseline data for establishing safety regulations at construction sites by analyzing fatal accidents by precipitation type.

  • PDF

A Study on the Construction Process of u-City IT Infrastructure (u-City IT인프라 구축 절차에 관한 연구)

  • Kim, Jeong-Uk;Kim, Il-Jung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.3
    • /
    • pp.291-296
    • /
    • 2009
  • "The Act on Ubiquitous City Construction and etc." stipulates the regulations on the planning, construction and management of the u-City. As its national-level law system is about to take its effects, future new city developments are expected to have its legal basis to be built to meet u-City requirements. Also, it is anticipated that such needs would require much more planning techniques and strategies. In reaction to those upcoming needs, this study is to search for new IT infrastructure construction process of the u-City in reality. It is also to supply with the each step framework to execute the u-City projects in more structuralize and systemize manner. Therefore, with the u-City IT infra construction guide line v1.0, purpose of the establishment of comprehensive IT infrastructure construction process.

A Study on Safety Accidents at Construction Work Sites of Railway (철도 건설공사 현장의 안전사고에 관한 연구)

  • Bang, Myung-Seok;Choi, Soo-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.5
    • /
    • pp.33-38
    • /
    • 2010
  • Railway is one of popular transportation systems. Due to the safety and in time, the transportation by train is preferred to the others for a long time. However, accidents under railway construction get more serious problems than in case of the other system, because it is the largest mass transportation system. Especially, the railway construction is composed of different kinds of construction works such as civil, architect, electric and mechanic. It is closely/complicatedly connected with various workers, large machines and facilities, regulations etc. In this study the data on safety accidents are corrected during 6 years(2004~2009) and analyzed by time(year, month, week, day, a.m or p.m), place, field, type etc. Results shows that there exists remakable trends on accidents, so efficient treatments should be prepared considering this trend.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

A Decision Making Method between Reconstruction & Remodeling for Improvement of the Apartment Housing (공동주택 개량을 위한 재건축과 리모델링의 사업 추진 결정 방법)

  • Kim Hyung-Man;Yoon Suk-Ho;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.476-479
    • /
    • 2004
  • In the process of industrialization of our country in 1970's, Korea's housing strategy has focused on housing supply. Rapid completion and supply of apartment house buildings have caused a problem of their early deterioration due to their poor quality. In 1987 Housing Construction Promotion Act, therefore, included new regulations on housing re-construction. In July 2001, other new regulations on remodeling apartment buildings were also included in the Act. Reconstruction and remodeling have been considered to deal with such problems. This study suggests an appraisal criteria if they can select reconstruction or remodeling method in conducting their apartment building project. At first, evaluation items should be selected by the criteria of function31ity and economical efficiency. Second, the selected item is screened by AHP and multi-criteria decision-making methods. The result of study shows that the owners of apartment units will be able to select reasonable alternatives through the suggested appraisal method

  • PDF

Performance Verification and Reliability Test of Load Cell Gauge in Korea (국내 하중계 성능검증과 신뢰성 시험 연구)

  • Kim, Yeong-Bae;Park, Yeong-Bae;Lee, Seong-Won;Lee, Kang-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.12
    • /
    • pp.103-114
    • /
    • 2023
  • Monitoring the site of an underground construction wall is crucial to confirm the stability of the supports and ground due to excavation. In particular, it is essential to maintain the accuracy of a load cell gauge, which identifies the load of the support transmitted from the excavated ground. However, research on verification methods and regulations that can identify the accuracy of load cell gauges at construction sites is inadequate, which is a problem as load cell gauges are installed without proper performance inspections. In this study, performance tests were conducted by a complete investigation of load cell gauges sold in Korea and comparing them with foreign products to determine defect causes. In addition, the criteria for selecting a load cell gauge were presented, and the results of this study were considered to help select a highly reliable load cell gauge.

Applicability Evaluation of Mobile Mapping System for Road Construction Surveying (도로 시공측량을 위한 모바일맵핑시스템의 적용성 평가)

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.169-175
    • /
    • 2022
  • Korea's construction industry has a shortage and aging of construction manpower, low productivity compared to other industries, and a high rate of industrial accidents. The Ministry of Land, Infrastructure and Transport is preparing for the 4th industrial revolution and is expanding investment in construction automation and innovative growth engines to improve productivity in the construction industry. In order for new technologies to be utilized in the road construction field, the accuracy of the technologies and the applicability of each type of work must be evaluated. In this study, the accuracy of the mobile mapping system was tried to verify based on the relevant work regulations, and to suggest the applicability of the mobile mapping system to high-speed driving tracks through data acquisition and analysis on road construction sites. The accuracy of the equipment used in the study was verified in accordance with the relevant work regulations, and the possibility of applying the mobile mapping system used for the study to road construction surveying was presented with a maximum error of less than 10cm in the horizontal and vertical directions. In addition, the possibility of utilizing the road construction survey using the mobile mapping system was presented through comparison with the existing method for data acquisition time for construction surveying, production of construction status survey results, and calculation of heatmap and earthworks. In the future, the use of construction status surveying of the mobile mapping system will greatly improve the efficiency of construction work.

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF

Man-hour Reduction with a Regulatory Review Program for a Pressure Vessel Design (관련규정 검토 프로그램 활용 시 압력용기 설계시간 단축 효과)

  • Joo, Jung-Min;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.60-72
    • /
    • 2012
  • In this study to reduce the review time of the pressure vessel regulations pressure vessel legislation review program has been developed. During the course of this research program to develop the domestic construction in a real project, saving 47% of the time was found.

  • PDF

Development of the Repair and Rehabilitation Methods for R/C Structures (철근콘크리트 구조물의 보수 보강 신기술 개발)

  • Sim, Jong-Sung;Hong, Young-Kyun;Choi, Long;Im, Chang-Duck
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.207-211
    • /
    • 1995
  • As the construction industry has been developed since 1970, there is a great needs to develop the methodology for repair and rehabilitation of the damaged reinforced concrete structures. Numerous materials which are currently used in construction field without any regulations are examined in terms of their serviceabilities and effectiveness. Structural behavior of repaired beams are investigated both statically and dynamically. This paper summarize the overall research plan, which is sponsored by KICT, in 1994.

  • PDF