Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

Development of Climbing Hydraulic Robot System's Synchronizing Controller for Construction Automation (시공자동화를 위한 크라이밍 유압로봇시스템의 동기제어 컨트롤러 개발)

  • Cho, Nam-Seok;Kim, Chang-Won;Kim, Dong-In;Lee, Kyu-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.167-169
    • /
    • 2011
  • Construction Automation as a way to solve the problems of lack of skilled labor by decrease in construction population productivity and quality decrease. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation) system. Climbing hydraulic robot system is a part of RCA system and makes Construction Factory(CF) climb next floor. The controller can control movement needs to be developed for CF safety. Synchronous control the actual field was applied to the controller logic and synchronous control of the process through which the safety has been verified. The purpose of this study that control of climbing hydraulic robot system behavior on real-time, and to improve safety for overall construction automation system through synchronous motion controller.

  • PDF

TEMPERATURE CONTROL AND COMPRESSIVE STRENGTH ASSESSMENT OF IN-PLACE CONCRETE STRUCTURES USING THE WIRELESS TEMPERATURE MEASURING SYSTEM BASED ON THE UBIQUITOUS SENSOR NETWORK

  • Ho Kyoo JO;Hyung Rae KIM;Tae Koo KIM
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.794-799
    • /
    • 2009
  • The temperature control of in-place concrete is the most important factor for an early age of curing concrete. Heat stress of mass concrete caused by the heat of hydration can induce the crack of concrete, and a frost damage from cold weather casting concrete results defect on compressive strength and degradation of durability. Therefore, success and failure of concrete work is dependant on the measurement and control of concrete temperature. In addition, the compressive strength assessment of in-place concrete obtained from the maturity calculated from the history of temperature make a reduction of construction cycle time, possible. For that purpose, wireless temperature measuring system was developed to control temperature and assess strength of concrete. And, it was possible to monitor the temperature of concrete over 1km apart from site office and to take a proper measure; mesh-type network was developed for wireless sensor. Furthermore, curing control system that contains the program capable to calculate the maturity of concrete from the history of temperature and to assess the compressive strength of concrete was established. In this study, organization and practical method of developed curing control system are presented; base on in-place application case.

  • PDF

A Feasibility Evaluation on the Outsourcing of Quality Testing and Inspection

  • Choi, Minsoo;Kim, Moohan
    • Architectural research
    • /
    • v.9 no.1
    • /
    • pp.47-52
    • /
    • 2007
  • The purpose of this research is to evaluate the feasibility of outsourcing test/inspection activity in construction work. This research conducted a questionnaire of interested parties as well as a survey by Analytic Hierarchy Process (AHP) with experts on quality control. For the evaluation by AHP, five criteria were adopted and a number of pair-wise comparisons were conducted through two stages. Finally, the weighting coefficient to approve the outsourcing was calculated at 0.606 and it therefore appeared more reasonable to permit rather than prohibit outsourcing. According to the AHP result, it was found that outsourcing would be necessary to enhance the objectivity and specialties of quality testing and inspection, even though somewhat undesirable in terms of enhancing a sense of responsibility and systemically conducting the testing and inspection.

A Research on Improvement Scheme for Performance Quality Standard of Self-Adhesive Waterproofing Sheet (자착형 방수시트의 성능 품질기준 개선안에 관한 연구)

  • Jeon, jong-Soo;Park, Wan-Goo;Kim, Yun-Ho;Park, Jin-Sang;Song, Je-Young;Oh, Sang-keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.261-262
    • /
    • 2012
  • The field application through the quality control of self adhesive rubberized asphalt waterproofing sheet was regulated by KS F 4934 of Korea Standard in 2003. However, regulations that different material properties of self-Adhesive waterproofing sheets are difficult on the standard. Therefore, this research was performed for of quality control all affiliations of self-adhesive waterproofing sheet through basic properties test and proposed quality standard revised bill in KS F 4934.

  • PDF

Efficient Unit-Water Management Method for Stabilizing the Quality of Ready-mixed Concrete (레미콘 품질 안정화를 위한 효율적인 단위수량 관리 방안)

  • Choi, Sung-Woo;Ryu, Deug-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.327-328
    • /
    • 2021
  • In the manufacturing process of ready-mixed concrete, quantity management directly affects the workability and strength of concrete. Therefore, water quantity is the most important management factor for water quality control of ready-mixed concrete. It can be said that the number of unit water in the mix design, the water quantity due to the surface water contained in the aggregate used, and the water quantity taking into account the concentration of sludge contained in the recycling water when using the recycling water are factors that affect the quantity management of ready-mixed concrete. In this study, as a stable quality control method of ready-mixed concrete, a quantity management method by aggregate surface water and a sludge concentration management method according to the use of recycling water were proposed. Thus, we tried to suggest an efficient quantity management method for stabilizing the quality of ready-mixed concrete.

  • PDF

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

Determination of Quality Cost Policy under the Multiple Assignable Causes (다중이상원인하의 경제적 품질비용 정책결정)

  • Kim Kyewan;Park Ji Yeon;Yun Deok Kyun
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.1-8
    • /
    • 2002
  • At present, company has to produce a product that consumer like with a competitive price, a good quality, and a fitting time to supply. Process control and qualify control are very important to supply with a product uniformly and inexpensively In this paper, the characteristic of product quality is monitored by control chart during the machining process and construction of quality control cycle is considered to divide into two types in this case that different assignable causes lead to shifts having different magnitudes. Then we are intended to find a process shift magnitude which has economical quality cost policy and are considered to quality cost functions to find a process shift magnitude. Those costs are categorized into the well-known categories of prevention, appraisal, and internal failure and external failure. This paper ends with numerical examples that demonstrate the usefulness of the model.

  • PDF

Construction Process & Technologies Applied to Parc.1 Project

  • Hoi-soo, Seo;Jae-min, Baek
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.181-187
    • /
    • 2022
  • POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc

Bootstrap control limits of process control charts for correlative process data

  • Suzuki Hideo
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.174-179
    • /
    • 1998
  • This research explores the application of the bootstrap methods to the construction of control limits for the x charts and the EWMA charts based on single observations with stationary autoregressive processes. The subsample means-based control chars in the presence autocorrelation are also considered. We use a technique for inferring confidence intervals using bootstrap, the percentile method. Simulation studies are conducted to compare the performance of the bootstrap method and that of standard method for constructing control charts under several conditions.

  • PDF