• Title/Summary/Keyword: Construction phase

Search Result 1,701, Processing Time 0.024 seconds

A Study on the Environmental Improvement in the Interior Construction Fields with the check-list (실내건축의 작업환경 개선을 위한 기본적 관리방안에 관한 연구)

  • 이용의
    • Korean Institute of Interior Design Journal
    • /
    • no.9
    • /
    • pp.10-17
    • /
    • 1996
  • With the ever-increasing important of high-speed information in society as we move towards the 21 st century. Interior design and it's working condition has been changed a great deal included a sort of each special character and make a difference against the others. It used to be find a great poles asunder of worker's safety and project quality according to the environmental dimension of interior construction field as if they should be a pleasantness or poor condition. This research aimed to improvement of environmental construction field of interior with construction engineers and particular interior labors in 4 phases as : ⅠThe preparatory phase : -Secure a Budget, Environmental safety supervisor -Fix of Design quality, Construction period. -Choice of Construction method, Sub constructing Ⅱ. Starting work phase ; -Capacity , Safety of temporary power line. -Carriage, Stock of Material -Safety of Electronic tools, -Personal protector. Ⅲ. Working period ; -Ventilation, I illumination of working place. -Measurement of environmental working condition Ⅳ.Finish working phase ; -Analysis of measurement data. -Evaluation and making up for the weak point. -Keeping data.

  • PDF

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

Analysis of Technical Requirement for Implementation of Multi-trade Prefabrication (Multi-trade Prefabrication 기법 적용을 위한 기술적 요구사항 분석)

  • Jang, Se-Jun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.113-114
    • /
    • 2016
  • This paper proposes a technical requirements analysis of implementation of multi-trade prefabrication. Recently, there has been a rise in the use of prefabrication to minimize on-site work for time reduction to increase productivity. Prefabrication technique is evolved into multi-trade prefabrication combining other trades from single-trade prefabrication. For implementation of new technique, not only itself but complementary techniques have to be prepared. In this paper, MEP corridor rack, a major item of multi-trade prefabrication, was implemented in the test bed and its process was analyzed to find out technical requirements. As a result, comparatively high level of IT technique was required for efficient use of multi-trade prefabrication in design, lifting and construction phase. In design phase, component level of BIM library was needed for manufacturing; and in lifting phase, BIM-based site logistics process was required. Also in construction phase, laser scanning was implemented for gathering shape and geometry of the wall and slab that were attached to multi-trade prefabrication module.

  • PDF

AN EFFECT ANLYSIS OF RISK FACTORS FOR BUILD TRANSFER LEASE PROJECTS

  • Yang-Woo Lee;Soo-Yong Kim; Jung-Man Jung;Dae-Young Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.498-508
    • /
    • 2007
  • The Build-Transfer-Lease (BTL) projects have rapidly increased under the Government support during recent years. This paper presents the risk analysis of factors affecting BTL projects in the initial phase. This study resulted in 10 significant risk factors influencing on each phase of BTL projects and then factors were grouped into each phase. The sensitivity analysis was also performed to identify risk factors with more significant influence on BTL projects. The results may useful to practitioners in order to cope with risks in initial phase of BTL projects. The paper resulted in the distribution of risks to project parties, thus it can be used as standards for risk assignment to competent authorities and private enterprises of BTL projects.

  • PDF

Efficient Problem-Solving Idea Generation in the Design Phase VE of Construction Projects using Business Creativity Codes(BCC) (건설 설계VE의 효율적 문제해결 아이디어 도출을 위한 비즈니스 창의성 코드(BCC) 활용방안)

  • Kim, Huy-Qyou;Park, Young-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.367-379
    • /
    • 2016
  • Although the importance of creative thinking is rapidly increasing in the new century, the generation of creative ideas and its application in the construction industry have been considered relatively difficult. Thus there have been a few studies on the subject that how to apply creative thinking tools with empirical evidence in the construction industry. Value engineering(VE) has been widely applied in the design phase of construction projects due to the government regulation, Brainstorming has been the most prevalent idea generation techniques in the VE activities during the past several decades. Contrary to popular belief, the performance of brainstorming is not so good. It is known as the brainstorming myth. This paper proposes the business creativity codes(BCC) as an alternative idea generation tool in the design phase VE of construction projects. In order to examine the effectiveness of the BCC, 50 successful field cases awarded in the design VE competition of government agency are used. The result shows that the BCC can be used as an effective idea generation tool in the design phase VE construction projects.

An Analysis of BIM uptake in Each Phase of Modular Construction Projects in Korea (국내 모듈러 건축 프로젝트의 단계별 BIM 활용업무 분석)

  • Lee, Ung-Kyun;Lee, Myungdo
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.5
    • /
    • pp.133-140
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that could contribute to overcoming the crisis faced by the construction industry. However, BIM uptake in current modular construction projects is limited. Moreover, there are no specific guidelines to support decision-making regarding the application of BIM in modular construction projects. Therefore, this study aims to analyze the possibility for BIM uptake in each phase of modular construction projects in Korea. Initially, the literature detailing on BIM uptake cases in modular construction projects was reviewed. The detailed work and activities for each phase of a modular project were analyzed via a questionnaire targeting domestic modular experts, to derive items requiring improvement due to errors or changes occurring in the actual project. Ten realistic BIM uptake items were derived, reflecting the results of literature review and expert interviews. Then, the BIM uptake items in each phase were analyzed in terms of necessity and efficiency via a second questionnaire using five-point Likert scales. Finally, the BIM utilization index (BIM UI) of the BIM uptake items was suggested as a priority measure. As a result, the BIM UI of "3D coordination" (U2), "design authoring and reviews for off-site fabrication" (U3), and "detailed 3D modeling for off-site fabrication" (U4), were assigned the highest priority. The results of this study can be used as guidelines to support decision-making regarding the application of BIM in modular construction projects.

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF

Analysis of Business Implementation Strategy and Construction Management Techniques in Spearheading Overseas Expansion

  • Park, Kyungrog;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.472-476
    • /
    • 2015
  • The purpose of this study is to fully understand the present state of the domestic construction companies, and to analyze phased business types and construction management techniques in order to initiate overseas expansion. Because of the recession in the domestic construction market, a thorough and strategic perspective to constantly develop inroads into overseas market is required. So we carried out a questionnaire survey targeting the experts of the overseas construction and researcher, and consulted them in depth. The questionnaire survey was divided into three sections. The first section is the necessity of overseas construction and the reason. The second is the overseas business types classified into the way of advance in short-term and long-term phase possibility of expansion. Lastly, the importance of the phased construction management techniques and the current capacity of the domestic and the foreign business trends were scrutinized. On the basis of the consultation and surveys, we analyzed the overseas business types and the construction management types in the short-term and long-term phase.

  • PDF

Design Criteria for Effective Public Building Construction Process (공공청사의 효율적 조성을 위한 건축디자인 기준 설정 연구)

  • Kim, Chang-Shin;Dong, Jae-Uk;Lee, Hwa-Ryong
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.1
    • /
    • pp.43-53
    • /
    • 2013
  • The purpose of this study is to propose the reasonable method for effective public building construction process. Public building service administration is necessary to make efficient public building supply and demand program. As a result, current public building precess need four steps(organize public assets, various process, establish public building service administration, design criteria). 1. Planning phase : Participation of Private Experts is guaranteed to enhance public building's function such as welfare, entertainment. 2. Design Phase : Detailed design review makes efficient and user oriented public building. 3. Construction Phase : Public Architect solve various problems among the participator especially in case of government local building construction. In conclusion, well formulated design criteria and Public building service administration make public building efficient in various field.

Efficiency Improvement Plan for Output Management at the Design Phase in BIM-Based Projects (국내 BIM 기반 건설 프로젝트에서의 설계단계 성과물 작성 효율화 방안에 관한 연구)

  • Kim, Ki-Nam;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.261-264
    • /
    • 2010
  • As construction projects get bigger and more complex, communication and information flow among participants become key success factors of a project. Accordingly, construction projects to respond to these changes being made in the introduction of BIM (Building Information Modeling). But as 2D drawings are still to be widely used in practical fields, it is very important that 2D drawing information could be easily and clearly projected from 3D BIM data. In this study suggest that efficiency of design phase in BIM-based construction projects for can cause confusion and additional work in traditional to BIM.

  • PDF