• 제목/요약/키워드: Construction phase

검색결과 1,697건 처리시간 0.025초

설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안 (A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases)

  • 박보성;김선혜
    • 설비공학논문집
    • /
    • 제29권12호
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

국내 건설VE 운영현황과 발전방향 (Implementation Status and Improvement Strategy of the Value Engineering in Domestic Construction Industry)

  • 서용칠
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.137-144
    • /
    • 2007
  • 국내에서 활용가능한 VE형태는 2000년 3월 제정된 건설기술관리법 시행령 제38조13(설계의 경제성등 검토)에 근거한 설계VE와, 국가계약법 시행령 제65조에 근거한 기술개발보상제도에 의한 시공VE이다. 특히 건설기술관리법 시행령과 건설교통부의 설계VE 시행지침의 수립은 그간 민간 및 타 분야에서 활용되었던 VE를 제도적으로 규정함으로써 체계적인 VE를 실행할 수 있는 된 계기가 되었고, 이후 VE는 질적, 양적으로 증가하게 되었다. 또한 2005년에는 건설기술관리법 시행령을 개정하여 설계VE 대상공사를 당초 500억이상의 공사에서 100억이상의 공사로 확대하였으며, 건설교통부 및 조달청에서 각각 고시한 건설사업관리자 사업수행능력 세부평가기준에서 설계VE 우수업체에 가점을 부여하는 등 국내 건설VE는 계혹해서 확대될 전망이다. 본 연구에서는 도입된지 25년이 된 기술개발보상제와 7년이 지난 설계VE의 운영현황과 문제점을 살펴보고, VE적용성과를 더욱 높일 수 있는 발전방향을 제안하고자 한다.

  • PDF

시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 - (Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP -)

  • 김우진;박진호;차용운;현창택;한상원
    • 한국건설관리학회논문집
    • /
    • 제20권1호
    • /
    • pp.22-31
    • /
    • 2019
  • 국내 외 건설공사에서 건물의 전 생애주기 동안에 발생되는 정보의 관리 및 통합이 가능한 BIM 적용이 활발해지고 있다. BIM을 시공단계에 활용할 경우 공기단축, 재시공 감소, 협업능력 향상 등의 효과가 있다. 그러나 국내 BIM 지침서 정의수준 부족, 설계 기준의 미비 때문에 시공단계에 BIM을 적용하는데 한계가 있다. 특히, 설계 단계에 비해 시공단계에서는 MEP 분야는 그 중요성이 훨씬 커진다. 따라서 본 연구는 시공단계의 MEP 분야에서 BIM활용도를 높이기 위하여, 시공 BIM MEP 모델 요구조건 체크리스트를 개발하였다. 체크리스트 개발을 위하여 국내 외 BIM 지침서 및 시공 BIM이 적용된 민간 공공 공사의 사례를 분석하였다. 지침서 및 사례를 토대로 작성객체 31개, 속성기준 31개, 총 62개의 시공 BIM 모델 요구조건을 도출하였다. 도출한 62개의 요구조건을 활용목적과 필요사항으로 구분하여 시공 BIM MEP모델 요구조건 체크리스트를 제안하였다. 본 연구에서 제안한 체크리스트를 실무에서 활용한다면 시공단계 MEP BIM 모델의 활용도를 향상시킬 수 있을 것으로 기대된다. 또한 학문적인 측면에서 시공단계 BIM 모델의 표준화된 지침서 개발에 활용될 기초연구로서 의미가 있다.

Exploratory Study on the Process and Checklist Items for Construction Safety Inspection Utilizing Drones

  • Jung, Jieun;Baek, Mina;Yu, Chaeyeon;Lee, Donghoon;Kim, Sungjin
    • 한국건축시공학회지
    • /
    • 제23권3호
    • /
    • pp.327-336
    • /
    • 2023
  • The focus of this research was to devise a conceptual methodology for drone usage and to assess the viability of safety checklist items specific to drone application in safety oversight. The appraisal was grounded in a focus group interview involving professionals from construction management and safety fields. The proposed process was segmented into four stages: 1) pre-flight phase for flight plan development, 2) drone flight phase for safety condition inspection utilizing checklist items, 3) post-flight phase for visual asset analysis, and 4) documentation and management phase. Furthermore, the research scrutinized the applicability of 32 distinct safety checklist items for drone operations. The primary aim of this investigation was to probe the possible deployment of drones as part of construction safety inspections at work sites. However, it bears mentioning that subsequent research should strive to gather a more extensive sample size through questionnaire surveys, thereby facilitating quantitative analysis. Administering such surveys would yield more comprehensive data compared to a focus group interview, which was constrained by a limited participant count. In summation, this study lays a foundational groundwork for understanding the potential advantages and challenges associated with integrating drones into construction safety management.

토목시설물에 대한 BIM기반 공사관리 기법 연구 (A Study on the Construction Management Method based on BIM for Civil Engineering Project)

  • 김성훈;이상호;남상혁;선오영
    • 한국전산구조공학회논문집
    • /
    • 제24권4호
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling)은 원칙적으로 건설 전 생애주기에 걸쳐 활용되어야 그 효과를 극대화 할 수 있으나, 아직은 계획 및 설계단계에 비하여 공사단계에서는 그 활용도가 상당히 낮은 수준이었다. 최근 대형 국책사업이 발주, 시공되면서 효율적인 공사관리를 위한 방법으로 3D 성과품 검토나 4D 공정관리 등 BIM기법 중 일부가 도입되고 있다. 본 연구에서는 토목시설물의 공사단계에서 BIM 활용방안에 대하여 제시하였다. 토목공사의 종류별, 관리 분야별 BIM 활용방안에 대하여 논의하고, 서울 지하철 919공구에 실제로 적용하여 그 효용성에 대하여 분석하였다. 특히, 현장에 구축된 BIM 기반의 웹 공사관리 시스템은 공사중, 현장과 본사를 비롯해 발주처와 감리단 등 다수의 공사 주체들이 BIM을 보다 효과적으로 사용하도록 함으로써, BIM의 공사단계 활용성을 높일 뿐만 아니라 유지관리 단계까지 확장하여 이용될 수 있다.

FCS 가변형 몰드 생산을 위한 PCM 분석 (Analysis of Phase Change Materials for Production of Changable Mold for Free-form Concrete Segment)

  • 이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.150-151
    • /
    • 2014
  • A mold of free-form concrete segment can be used only one time. Thus, the construction duration and cost are increased. The materials of the mold such as wood and metal have limitations due to the implementation and reuse. The review of the material of the mold for free-form concrete segment is needed to reduce duration and production cost. Phase change material can be used both to implement free-shape by heating and to produce mold after cooling. After using Phase change material can be re-used to mold by heating. The scope of this study is many kind of phase change materials for molding. The aim of this study is to analyze the phase change materials for production of changable mold for free-form concrete segment. In this study, the paraffin wax that is melted at 64℃ was selected by considering both the energy efficiency and the weather of Korea.

  • PDF

인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델 (Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network)

  • 한형동;김정환;윤중호;서종원
    • 대한토목학회논문집
    • /
    • 제31권6D호
    • /
    • pp.829-837
    • /
    • 2011
  • 공사비 견적이란 건설공사를 수행하는데 소요되는 공사비를 산정하는 것으로, 공사 기획단계에서 사용하는 개략견적은 다양한 목적으로 사용된다. 한편, 도로공사의 경우, 현행 사용되는 개략견적방법은 과거의 실적자료를 산술평균하여 단위 km당 공사비를 제시한 것으로 실제 개략공사비로 활용하기에는 어려움이 있다. 본 연구에서는 기획단계의 도로공사견적 산정방식에 대한 한계를 해결하기 위하여, 인공신경망을 적용한 개략공사비 모델을 제시하는 것을 목적으로 한다. 도로건설 공사입찰을 위한 기본설계도면 작성 이후 공사비를 결정하는 변수를 포함한 과거 실적 자료를 바탕으로 인공신경망을 적용하여 기획단계에서 공사비 예측이 가능한 도로 공사비를 개략견적 하는 모델을 설계하였으며, 시행착오방식을 이용하여 모델의 변수들을 최적화하였다. 또한 최적화된 모델을 통해 나온 결과를 회귀분석을 적용한 결과와 비교하여 정확도가 뛰어남을 검증하였다. 제안된 인공신경망모델은 차후 도로건설공사의 개략공사비 산정을 위한 활용될 것으로 기대된다.

A Novel Fast Open-loop Phase Locking Scheme Based on Synchronous Reference Frame for Three-phase Non-ideal Power Grids

  • Xiong, Liansong;Zhuo, Fang;Wang, Feng;Liu, Xiaokang;Zhu, Minghua;Yi, Hao
    • Journal of Power Electronics
    • /
    • 제16권4호
    • /
    • pp.1513-1525
    • /
    • 2016
  • Rapid and accurate phase synchronization is critical for the reliable control of grid-tied inverters. However, the commonly used software phase-locked loop methods do not always satisfy the need for high-speed and accurate phase synchronization under severe grid imbalance conditions. To address this problem, this study develops a novel open-loop phase locking scheme based on a synchronous reference frame. The proposed scheme is characterized by remarkable response speed, high accuracy, and easy implementation. It comprises three functional cascaded blocks: fast orthogonal signal generation block, fast fundamental-frequency positive sequence component construction block, and fast phase calculation block. The developed virtual orthogonal signal generation method in the first block, which is characterized by noise immunity and high accuracy, can effectively avoid approximation errors and noise amplification in a wide range of sampling frequencies. In the second block, which is the foundation for achieving fast phase synchronization within 3 ms, the fundamental-frequency positive sequence components of unsymmetrical grid voltages can be achieved with the developed orthogonal signal construction strategy and the symmetrical component method. The real-time grid phase can be consequently obtained in the third block, which is free from self-tuning closed-loop control and thus improves the dynamic performance of the proposed scheme. The proposed scheme is adaptive to severe unsymmetrical grid voltages with sudden changes in magnitude, phase, and/or frequency. Moreover, this scheme is able to eliminate phase errors induced by harmonics and random noise. The validity and utility of the proposed scheme are verified by the experimental results.

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

건축 시공단계 환경관련 법규 현황 및 개선방향 (Status and Improvement Direction of Environment-related Laws in Construction Phase)

  • 홍석규;김창원;차민수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.146-148
    • /
    • 2013
  • Recently Construction industry is try to minimize effects on the Environment. So, Korea government is provided the Environmental law, but environmental managers who works in construction phase are not easy to understand the Environmental law because the laws are scattered in the several legislations and hardly to find the clauses for the environmental law. Therefore this study intends to deduct the improvement directions of Environmental laws. The basis data is selected through survey targeting environmental managers and analyzed by AHP.

  • PDF