Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

Research on Digital Construction Site Management Using Drone and Vision Processing Technology (드론 및 비전 프로세싱 기술을 활용한 디지털 건설현장 관리에 대한 연구)

  • Seo, Min Jo;Park, Kyung Kyu;Lee, Seung Been;Kim, Si Uk;Choi, Won Jun;Kim, Chee Kyeung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.239-240
    • /
    • 2023
  • Construction site management involves overseeing tasks from the construction phase to the maintenance stage, and digitalization of construction sites is necessary for digital construction site management. In this study, we aim to conduct research on object recognition at construction sites using drones. Images of construction sites captured by drones are reconstructed into BIM (Building Information Modeling) models, and objects are recognized after partially rendering the models using artificial intelligence. For the photorealistic rendering of the BIM models, both traditional filtering techniques and the generative adversarial network (GAN) model were used, while the YOLO (You Only Look Once) model was employed for object recognition. This study is expected to provide insights into the research direction of digital construction site management and help assess the potential and future value of introducing artificial intelligence in the construction industry.

  • PDF

Database Investigation Algorithm for High-Accuracy based Indoor Positioning (WLAN 기반 실내 위치 측위에서 측위 정확도 향상을 위한 데이터 구축 방법)

  • Song, Jin-Woo;Hur, Soo-Jung;Park, Yong-Wan;Yoo, Kook-Yeol
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.7 no.2
    • /
    • pp.85-93
    • /
    • 2012
  • In this paper, we proposed Wireless LAN (WLAN) localization method that enhances database construction based on weighting factor and analyse the characteristic of the WLAN received signals. The weighting factor plays a key role as it determines the importance of Received Signal Strength Indication (RSSI) value from number of received signals (frequency). The fingerprint method is the most widely used method in WLAN-based positioning methods because it has high location accuracy compare to other indoor positioning methods. The fingerprint method has different location accuracies which depend on training phase and positioning phase. In training phase, intensity of RSSI is measured under the various. Conventional systems adapt average of RSSI samples in a database construction, which is not quite accurate due to variety of RSSI samples. In this paper, we analyse WLAN RSSI characteristic from anechoic chamber test, and analyze the causes of various distributions of RSSI and its influence on location accuracy in indoor environments. In addition, we proposed enhanced weighting factor algorithm for accurate database construction and compare location accuracy of proposed algorithm with conventional algorithm by computer simulations and tests.

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

The opening of Gyeongbu high-speed railway project phase II (between Daegu and Busan) (기획특집: 경부고속철도 2단계사업 (대구~부산)개통)

  • Rim, Hyoung-Gyu
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.6
    • /
    • pp.27-30
    • /
    • 2010
  • Gyeongbu high-speed railway project which comprises the construction of the new line with 417.5km between Seoul and Busan is one of the biggest national projects with approx. 20-trillion-won project cost. The construction was started in June 1992 and afterward phase I (between Seoul and Daegu) was opened in April 2004 and phase II (between Daegu and Busan, 169.5km) is scheduled for opening in the end of October 2010. It is assured that the opening of the entire sections of Gyeongbu high-speed railway will significantly increase productivity and efficiency by improving the land utilization with the promotion of personal and material exchanges induced by the reduction of travel time between regions. Especially, Gyeongbu high-speed railway will be the opportunity to boost speed-up of Korea railway.

  • PDF

A Study on BIM based Process Risk Management Model (BIM 기반의 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Choi, Myung-Seok;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.61-66
    • /
    • 2010
  • Recently a construction industry introduces information technology that brings about many advantages in the early planning phase, design phase and construction phase. Nevertheless a BIM has a many benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis.

  • PDF

Current Status of the GMT Project

  • Park, Byeong-Gon;Seo, Yoon-Kyung;Yoon, Yang-Noh;Hwang, Narae;Kim, Young-Soo;Yuk, In-Soo;Lee, Jae-Joon
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.38 no.1
    • /
    • pp.67.2-67.2
    • /
    • 2013
  • The GMT project is in its final stage of Design Development Phase in 2013, moving toward the Construction Phase planned to begin on Jan. 1st, 2014. In this contribution, we present the current status and progress of the GMT project including selection of the first generation instruments, development of primary mirror segments, site preparation, and science case revision along with plans for 2013 when the preparation of construction phase will be made.

  • PDF

Experimental Study of the Joint Movement Responsiveness Performance to the One-Component Silicon Sealants at Curing Phase (경화단계에서의 1성분형 실리콘 실란트의 거동대응성능에 관한 실험적 연구)

  • Son, Jong-Won;Ono, Tadashi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.63-64
    • /
    • 2014
  • In this study, we has a purpose to estimate the joint movement responsiveness performance for the domestic products of one-component structural silicon sealants. For this purpose, we make a comparative study for the four domestic products focused on tensile properties after allowed the cyclic-movements for three days at initial step of curing phase. A joint movement range ±10% and the rate of compression and extension 3.2mm/h were assumed in those tests. As a result, the large space were induced inside the sealant by rupture, and then adhesion and cohesion failures were caused by stress concentration. The tensile properties were reduced by 15~60% in comparison with physical properties. In this case, the generating defect was caused and the service-life was decreased. Thus, further researches as relationship of test condition and products properties on this behavior would be studied.

  • PDF

Fluidelastic instability of a curved tube array in single phase cross flow

  • Kang-Hee Lee;Heung-Seok Kang;Du-Ho Hong;Jong-In Kim
    • Nuclear Engineering and Technology
    • /
    • v.55 no.3
    • /
    • pp.1118-1124
    • /
    • 2023
  • Experimental study on the fluidelastic instability (FEI) of a curved tube bundle in single phase downward cross flow is investigated for the design qualification and analysis input preparation of helical coiled steam generator tubing. A 6×9 normal square curved tube array with equal and different vertical/horizontal pitch-to-diameter ratio was under-tested up to 6 m/s in term of gap flow velocity to measure the critical velocity for FEI. The critical velocity for FEI was measured at the turning point from the vibration amplitude plot along the gap flow velocity. Our test results were compared with straight tube results and published data in the design guideline. The applicability of the current design guidelines to a curved tube bundle is also assessed. We found that introducing frequency difference in a curved tube array increases the critical velocity for fluidelastic instability.