• 제목/요약/키워드: Construction method selection

Search Result 522, Processing Time 0.024 seconds

Evaluation Method for Value Analysis in the Remodeling of Apartment Building (아파트 건축물의 리모델링 가치분석을 위한 평가방법)

  • Kang Soon-Kil;Um Chan-Yong;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.157-160
    • /
    • 2005
  • Recently remodelling has been popular with the consensus on the environment protection, resources saving, and regards on the cultural value of buildings. and the remodelling is considered as a useful tool for commercial and apartment buildings. But, in Korea, the remodelling has been introduced recently and there is few reserches on the evaluation methods for value analysis in the remodelling. This research deals with economical selection method among various alternatives for living environment upgrading of old buildings. Also, this reserch studied on the selection method for the architect among various remodelling plans considering cost, building life cycle, and user needs when the remodelling is selected as the most economical method.

  • PDF

The Selection Criteria of Delivery Method based on Project Characteristics;focused on the Multi-Housing Projects (프로젝트 특성에 따른 발주방식 선정기준;공동주택 건설 사업을 중심으로)

  • Moon, Hyun-Seok;Cho, Kyu-Man;Hyun, Chang-Teak;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.390-395
    • /
    • 2006
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods (i..e, CM, DB, etc.). However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough project characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the model for selecting criteria of delivery method based on project characteristics in the Multi-housing projects.

  • PDF

A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis (VE/LCC 기법을 활용한 차수공법 선정사례 연구)

  • Cho Yong-Wan;Chang Jun-Ho;Kim Jin-Man;Ha Jae-In
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

Selection Method of Alternatives for Considering Correlation between Component Elements in Remodeling Design Process (리모델링 설계단계에서 부위구성요소의 상관관계를 고려한 대안선정 방법)

  • Park Chan-Gil;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.53-61
    • /
    • 2004
  • As remodeling project is progressed in the constraint which is utilization of existing resource, the subject of remodeling and extend of construction are affected by the correlation between building element. Therefore, this research analyze the correlation between component of building element in the design phase and proposed the diagram model for correlation between building element and proposed selection method of alternative plan for optimized combination of building element in remodeling project.

Selection of the Optimal Building Skin-System in Remodeling Projects (그린 리모델링을 위한, 적정 외피시스템 선정에 관한 연구)

  • Shin, Young-Su;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.296-297
    • /
    • 2014
  • United Nations Framework Convention on Climate Change(UNFCCC), an international treaty to prevent the regulation and global warming, has passed through the General Assembly for 17 times from 1992 to 2011. To create a performance plan specific, such as the Kyoto Protocol, it is to promote the reduction of energy consumption and greenhouse gases worldwide. In South Korea, Korea Infrastructure Safety and Technology Corporation(KISTEC) is working and supporting for developing method of green remodeling policy. Among several solutions, "Remodeling" ensures to increase the energy efficiency of buildings and to reduce the emissions of greenhouse gases, and consequently it could maintain buildings high efficiency. For remodeling projects, it is most important to determine construction plan including remodeling scopes and methods, while the plan has been determined by the engineer's background and experience. Therefore, this study aims at developing a method for selecting optimal skin system which has remarkable influence to energy performance of the buildings.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

QFD-Based Integrated Model of Dismantling Method Selection and FMEA Risk Assessment for Work Stage (QFD 기반의 해체공사 공법선정과 FMEA 위험성평가 통합 모델)

  • Lee, Hyung-Yong;Cho, Jae-Ho;Son, Bo-Sik;Chae, Myung-Jin;Kim, Hyun-Soo;Chun, Jae-Youl
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.629-640
    • /
    • 2021
  • According to statistics from the Ministry of Land, Infrastructure and Transport in 2018, approximately 37% of residential buildings in Korea need to be reconstructed. Due to the rapid growth of the demolition industry, many side effects such as environmental destruction and safety accidents are becoming a problem in the demolition of existing buildings. This study proposes a decision-making process for selecting the most suitable dismantling method for field application by comprehensively considering safety, economic feasibility, and environmental characteristics. In particular, field applicability is evaluated by evaluating risk factors for the selected method. To this end, this study proposes the TOPSIS method for the selection of the dismantling method using the QFD development concept, and the FMEA method as a continuous development process of the selected method.

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

The Comparison of Work Time between Field Fabrication Method and Partial Prefabrication Method of Rebar work (벽체철근 일반조립과 부분 선조립 공법의 작업시간 비교에 관한 연구)

  • Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.12-13
    • /
    • 2018
  • Reinforced concrete works account for 40 to 50 percent of the total construction work. However, the shortage of construction workers is a problem in the delay of the construction period of reinforced concrete. The partial rebar prefabrication is one of the ways to shorten construction period. Thus, this study compared the partial rebar prefabrication and field fabrication method through work sampling. As a result, the partial rebar prefabrication showed a significant decrease in time compared to field fabrication method. As a result of this study, it is expected to be used as a reference for the efficient selection of reinforced concrete methods.

  • PDF

A Comparative Analysis on the Characteristics of Rammed Earth Form System based on Selection Criteria (거푸집 선정기준에 의한 흙다짐용 거푸집 시스템의 특성 비교분석)

  • Lee, Jong Kook;Lee, Jung Je
    • KIEAE Journal
    • /
    • v.7 no.6
    • /
    • pp.91-97
    • /
    • 2007
  • This research examines the characteristics of the "rammed earth form" based on the criteria for the selection of forms. For this purpose, the paper first reviews the characteristics and orientation of the earth-construction and looks into the outline, the prerequisite, the current status and the tendency of the rammed earth form system through previous studies. Consequently, we aims to contribute to the criteria for the selection of rammed earth forms in the future through a comparative analysis of the construction cost, quality, safety and easiness of works between the veneer board form and the euroform, which are most widely used at earth housing project in the domestic country. The results reveals that the euroform is better than the veneer board with 21% of total cost in the cost analysis. But this better than that in the side of easiness of construction. In both cases, the buckling of wall panel form and the labor-oriented characteristics of the methods are the future research issues in the rammed earth form system.