• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.032 seconds

A Study on Composition of The Construction Organization in Construction Work in Korea - Focus on Apartment of The Capital Region - (국내 건축공사 시공조직 구성에 관한 연구 - 수도권 공동주택을 중심으로 -)

  • Lee, Kyo-Sun;Kim, Hyun-Seok;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.155-160
    • /
    • 2003
  • The Korean economic crisis hit badly the local construction industry, especially during the year of the 1998 when the country took the IMF bailout proframme. Under the poor business environment, such as reduction of construction investment, financial difficulty from high interest rate, and increasing bankruptcies, restructuring measures were repuired for survival of the industry. It is obvious the restructuring process is essential for the future business success. regardless of the financial crisis. With this background, this research aims the contribute to improved construction management structure and strengthened international competitiveness of the industry through the cost reduction and productivity enhancement, by analysising and proposing and optimal level of the manpower structure of construction management organization With the subject of 24 construction fields of apartment houses in the capital region as of January 1, 1999, constructed by OO company having leaded the construction industry of the country so far now, the researcher performed the on the spot survey regarding the organization/manpower structure and construction contract amount.

Collaborative Relationship Analysis between Members of Apartment Construction Organizations

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.102-109
    • /
    • 2014
  • The purpose of this study is to analyze collaborative relationship between members of a building construction organization. For the analysis of collaborative relationship, this researcher collected data by conducting a questionnaire survey with members of three large building construction organizations for apartment housing. The analyzed contents of collaborative relationship were the 'frequency of communication between organizational members' and their 'reliability'. According to the analysis of communication network, construction managers had low frequency of communication, whereas those responsible for each area, like construction deputy managers, had high frequency of communication. It indicates that middle managers are at the center of communication related to construction work in construction organizations. According to the analysis of reliability network, construction managers showed highest reliability, and employees at the top level in an organizational map also showed high reliability. Since they generally have a lot of experience, are some older of age, and assume responsibility for work, they are considered to receive reliability from other organizational members. This study proved that it was possible to numerically express reliability of organizational members, which is an abstract concept, and analyze it. Therefore, it is expected that the analysis result will highly be likely to be used in the area of construction management.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

An Incentive Program for Dissemination of the Basis of Construction CALS (건설 CALS 기반 확산을 위한 혜택부여방안)

  • Park Hye-Young;Han Sang-Won;Kim Bun-Soo;Kim Ki-Jung;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.67-74
    • /
    • 2001
  • The Korean government is making an effort to win the advance and international competitiveness of construction by changing Construction Industry into Knowledge-based information industry through Construction CALS. However, systematically obstructive factors and recession make participation of private construction companies in Construction CALS sluggish. The purpose of this paper is to suggest incentive program to induce participation of private construction companies in Construction CALS. Before setting up the direction of incentive program, the level of informatization in Korean Construction industry was grasped. Evaluation category for the discriminate application of incentives was defined and available incentive program was suggested.

  • PDF

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

Challenges for implementing smart construction in Korean construction industry using MICMAC-ISM approach

  • Junhak Lee;Jinwoo Won;Seung H. Han
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.917-924
    • /
    • 2024
  • Despite various government and institutional movements to promote implementation of smart construction, the utilization of smart technologies in the construction industry is still low compared to other industries. To take a systemic look at the impediments in the implementation of smart construction, this study identifies and analyzes the challenging factors of smart construction within the Korean construction industry. Through content analysis of relevant literature, including official documents, research reports, databases, 19 challenging factors have been identified. The intricate relationships among these challenging factors have been examined based on a hierarchy structure established by using the Interpretive Structural Modeling (ISM) approach. Furthermore, factors are classified into four distinct clusters by using the MICMAC analysis: driving factors, dependent factors, autonomous factors, and linkage factors. This classification delineates the interrelationships among the challenging factors and identifies the key factors that drive the system, which is different from that in traditional studies where the relative importance is generally given between factors. The findings will provide crucial information for policy designers and top-level authorities, indicating which challenging factors to prioritize limited resources and efforts. It will aid in formulating effective policies, standards, and regulations to foster the implementation of smart construction in the Korean construction industry.

Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - (시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 -)

  • Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.

A Study on the Knowledge and Information Basis in Oil Industries (윤활유 산업의 정보화에 관한 연구)

  • 김청균;고영배;공남철
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2000.11a
    • /
    • pp.414-419
    • /
    • 2000
  • This paper presents the knowledge and information construction trends in the oil industry. The investigated results show that the website construction and e-business level in oil industries including oil circulation distributors are very low and introduction stage compared with those of other industries.

  • PDF

An Empirical Analysis on the Working Conditions of Construction Technician (건설 기능인력 근무여건에 대한 실증 분석)

  • Yang, Jinkook;Lee, Taeshin;Lee, Jongmin;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.14-21
    • /
    • 2019
  • The construction phase of the construction project needs a large scale of manpower, materials and equipment. Among them, manpower is a core part for project construction. These manpower are divided into two groups. The first is the management group that manages the construction, and the second is the site technician manpower for construction work. Recently, construction company has suffering due to the insufficient supply of technician labor. Accordingly, this study will perform an empirical analysis about the construction technician. To do this, we surveyed related research trends and conducted surveys on the satisfaction of the construction technician. The result, satisfaction with pay and insurance was relatively low compared to other items. Therefore, this study were conducted in-depth interviews with technician managers in order to analyze the cause. In addition, case analysis was conducted to analyze actual working conditions. As a result, it was analyzed that the wage level and insurance system of construction technician were considerably stable compared to the manufacturing industry. The result of this study is expected to contribute to the activation of excellent technician cultivation through the change of recognition about construction technician.