LCA calculation methods using BIM at the basic design stage: A focus on matching BOM and CO2 norm data using Uniclass and IDEA

  • KIEU Tri Cuong;NGUYEN Hoang-Tung;Kazuya SHIDE
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.577-584
    • /
    • 2024
  • The construction sector is known as a main source of increased CO2 emissions, and BIM-LCA integration is expected to reduce the environmental burden by helping to control emissions and energy during the basic design stage. However, numerous studies showed that LCA is complicated as it requires great efforts in creating BOQ and linking multiple databases together. In addition, a precise LCA requires LOD 300, a level of detail that often takes a lot of effort to establish at the basic design stage. To address this issue, this study proposes a BOM-based BIM-LCA integrated model that uses a combination of Uniclass, IDEA, and the Calculation Formula Library, which focuses on the development and exploitation of information, even if the 3D Object's Level of Detail is low. The model allows the decomposition of the building information in order to create BOM and BOQ at a high level of detail from the basic design stage onward. Furthermore, it allows the flexible connection of data sources to perform LCA in a systematic manner.

Customers' Needs Analysis for Investment Decision Making in Residential Facility for Retired Seniors (유료노인주거시설에 대한 투자 의사결정을 위한 수요자 요구 분석)

  • Chin, Mee-Youn;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.53-61
    • /
    • 2008
  • It is expected that the market of residential facility for retired seniors will be a new investment field for construction firms. This study describes the questionnaire survey analysis results of potential customers' demand for the facility. For comparison purpose, direct construction cost was estimated by estimation experts. In addition, a case analysis was conducted to compare direct cost and indirect project cost with the experts' estimation. According to the questionnaire survey analysis, it is observed that there were significant differences in demand between groups which are classified by the regions, living expenditures, the level of property ownership and the scales of residence. From an investor's perspective, investment decision on residential facility for retired seniors should be made considering bothe the level of returns which can be generated from the investment and the customers' needs.

Study on the Influence of Stakeholders in Construction Projects

  • Rajeev, S.;Kothai, P.S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.8-11
    • /
    • 2014
  • The interactions and interrelationships between stakeholders largely determine the overall performance of a construction project, and have the crucial responsibility for delivering a project to successful completion. An important component of stakeholder management is stakeholder analysis. Two case studies are conducted within Kerala (India). The main objective was to carry out stakeholder analysis using stakeholder organiser deluxe software, considering the data's collected from the project execution team using questionnaire. During data collection the key stakeholders were identified, to know how to manage them, their interest, power, attitude level etc, for quality improvement. Analyze the results using the software Stakeholder organizer deluxe and modeling of stakeholders is to be done. Finally validate the models of the projects. These findings may mainly reflect the stakeholder management environment in the respective regions of project implementation.

Analysis of Technical Requirement for Implementation of Multi-trade Prefabrication (Multi-trade Prefabrication 기법 적용을 위한 기술적 요구사항 분석)

  • Jang, Se-Jun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.113-114
    • /
    • 2016
  • This paper proposes a technical requirements analysis of implementation of multi-trade prefabrication. Recently, there has been a rise in the use of prefabrication to minimize on-site work for time reduction to increase productivity. Prefabrication technique is evolved into multi-trade prefabrication combining other trades from single-trade prefabrication. For implementation of new technique, not only itself but complementary techniques have to be prepared. In this paper, MEP corridor rack, a major item of multi-trade prefabrication, was implemented in the test bed and its process was analyzed to find out technical requirements. As a result, comparatively high level of IT technique was required for efficient use of multi-trade prefabrication in design, lifting and construction phase. In design phase, component level of BIM library was needed for manufacturing; and in lifting phase, BIM-based site logistics process was required. Also in construction phase, laser scanning was implemented for gathering shape and geometry of the wall and slab that were attached to multi-trade prefabrication module.

  • PDF

A Study on the Corporate Portfolio Risk Management for Multinational Construction Company (대형건설업체의 해외건설공사 포트폴리오 리스크 관리에 관한 연구)

  • Han Seung-Heon;Lee Young;Kim Hyung-Jin;Ock Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.68-80
    • /
    • 2001
  • While opportunities for international construction firms have been growing with globalization, the risk of international construction projects is significantly increasing in severity and complexity. However, the traditional risk management approach in the construction industry has maintained a profit focus. In addition, this approach has not considered the overall risk at the corporate level, but rather has focused only on the risk of individuals at the project level. Corporate risk management should be implemented from the initial stages of new project selection. This paper suggests the Multi-criteria Integrated Systematic Analysis as a strategic decision-making tool for international construction contractors. The model integrates the multi-criteria of risk, return, and efficiency to choose the optimal set of new portfolios at the corporate level. This model also introduces the Value at Risk (VaR) concept to the international construction industry to present the total risk at the corporate level. To validate this model, this paper tested an experimental case study using the historical data of a global general contractor.

  • PDF

Development Acceptable Risk Model for International Construction Projects - Focusing on Small and Medium Construction Companies - (해외 건설 다수 프로젝트 관리를 위한 허용리스크 도출 - 중소·중견 건설기업 관점에서 -)

  • Hwang, Geunouk;Park, Chan Young;Jang, Woosiki;Han, Seung Heon;Kang, Sin Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.90-97
    • /
    • 2016
  • Since Korean construction firms have steadily advanced into the international market, small and medium construction companies (SMCCs) have also advanced in such market. SMCCs's recent trend have clearly shown the changes of contract types from single subcontractor projects to multiple general contracting projects. However, among those multiple projects performed by SMCCs, 1 out of 3 projects were deficit projects that impact the overall pe rformance of the firm. To increase such performance, risk management for in international construction must be managed at the enterprise level for SMCCs. This research aims to create a multiple project management model for SMCCS that employs the concept of acceptable risk to assess the limit risk level for corporation to acceptable. Using the accumulated data from previous survey and International Construction Association of Korea (ICAK), integrated risk of each firm and their profitability of each project are analyzed. Through the analysis, each firm's acceptable risk level is derived. Through the two research steps, acceptable risk algorithm was developed based on corporate integrated risk and profit correlation. To prove the acceptable algorithm relevance, financial statement analysis of 3 corporation was derived that level of acceptable risk and financial statement were available. Through the approach, this research allows the firms to analyze the firm's capability and find projects that suits the firm's situation and capability.

A Fundamental Study on International Comparison of Labor Productivity in Construction Industry (건설업 노동생산성의 국제비교에 관한 기초 연구)

  • Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.310-311
    • /
    • 2018
  • This study compared the labor productivity of the construction industry to the manufacturing and service industries. In addition, It analyzed the construction labor productivity gap of the G7 countries based on data from the Korean Productivity Center. A comparative analysis of construction labor productivity between manufacturing and service industries, based on statistics from the National Statistical Office, revealed a relatively low level and trend of continued decline. In addition, a comparative analysis of the productivity of construction workers in the major G7 countries found that the difference in productivity is very large, with an average of 65.3 %. Therefore, domestic construction companies and the government should prepare Improvement measures to improve productivity by investing in technology development to increase labor productivity and improving the production system of the construction industry.

  • PDF

Policymaking Improvement Strategy for Fine Laboring Ability of Construction Works (건설현장 근로의 양질화를 위한 정책적 개선 방안)

  • Yoon, Tai-Hyong;Lee, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.37-47
    • /
    • 2012
  • Engaged number in the construction industry is 45 percentage level against to manufacturing industry. And Induction -factor of Production is much the same to mfg. field, Value added Induction-factor is more higher than manufacturing industry, therefore we research again about workers' inferior working & personal life condition in our society in order to they feel happiness their life with pride for the job construction occupation. So construction companies & government will be contribute to strengthen their phase & to achieve more higher level of construction working culture for elevate competitive power. We have to prepare the basis to turn to the qualitative construction businesses by break away from only the amount of work volume in company with the system of workers' self-conceit on the ground of professional education/training, qualification system, social insurance benefits, working condition improvement, stable job. Our nations does not feel well-being senses, only 25 class level in the 30 countries of OECD. We draw the questions at issue with slough off old customs in order to qualitative improvement for profession & self-contentment of construction workers, and present the useful plan to contribute to international competitiveness with our construction firms in the globalize construction field under Government's & company's policy.

Case Study of Environmental Segmental Retaining Wall(SRW) Using Greenstone Block (환경친화적 블록식 보강토옹벽의 설계 및 시공사례연구)

  • Han, Jung-Geun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.6
    • /
    • pp.19-28
    • /
    • 2004
  • Segmental Retaining Wall(SRW) has been variously applying in Civil and Architecture construction. Recently, the application of environmental element in all type's structures came to essential requirement, and the construction cases of retaining wall using reinforced soil and block are more increased than the past. But, this trend more widely was spread environmental element as landscape work for the backside of reinforced retaining wall as well as block itself. New environmental block, Greenstone Block, developed to apply of this tendency. The retaining wall system using Greenstone can be environmental constructing at both block itself and backside of retaining wall. The material tests, the axial compressive strength test of block and bending test of fiber-pipe, exercised to design and construction of vertical SRW, which were satisfied NCMA standard. Through this procedure, Rewall (ver 1.0) was developed, which can be automation design of SRW including internal stability, external stability and local stability. And these can be considered setback of retaining wall, as well the examples of vertical retaining wall using block presented to satisfying the follows; strength of reinforced geotextile, height of retaining wall, surcharge, types of backfill and groundwater level etc. Many problems investigated on after or before of construction were due to local failure, insufficiency of bearing capacity and groundwater level. Especially, the local failure was many occurred to during compaction or after construction, and the cases of SRW construction is similar to the results of model test on vertical SRW.

A Research on the Renovation Situation of the Business Buildings (업무시설의 리노베이션 현황에 관한 조사 연구)

  • Lee, Hyun-Jeong;Shim, Myung-Sup
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.2
    • /
    • pp.121-127
    • /
    • 2002
  • The functions and uses of existing buildings are not properly changing as modern life needs. As a result, the frequent reconstruction(construction after removal) of existing buildings have been done but it became more and more difficult because of strengthening of regulations and systems concerning construction. And also it has several disadvantages like lower plot ratio and site coverage than existed buildings, enormous construction cost, production of waste-construction materials and thoughtless consumption of natural resources, which gives rise to environmental pollution. Therefore renovation is brought to the fore. In Korea, many business buildings were constructed in 1960s-1970s, during the period of high growth. Such buildings needs to be repaired in whole. It is caused by the change of social, economic, and cultural conditions and deterioration of equipments. Therefore renovation meets some necessary conditions; recovery of building functions and extension of building life span. In case study, the present state of renovation in business buildings is 1) Basic safety, for example, fire prevention and crime prevention, is great important. 2) Advanced technology, INS(international news service), IBS(Intelligent Building System), and internationalization, is pursued for adapting to multimedia ages. 3) It tries to promote proficiency, and to save the energy using spatial environment and natural energy(light and sound). Also, improving comfortable level of users and installing equipments for physically handicapped person needs to be considered.