• Title/Summary/Keyword: Construction level

Search Result 4,377, Processing Time 0.035 seconds

A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects (건축 프로젝트 개산견적 신뢰도 관리 프로세스에 관한 연구)

  • An, Sung-Hoon;Kim, Dae-Won;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.133-138
    • /
    • 2010
  • Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.

The Analysis on the Value of Yongsan National Park and its Economic Effect

  • Chang, In-Seok;Cho, Young-Tae;Lee, Mi-Hong;Park, Shin-Won
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.491-501
    • /
    • 2011
  • This study estimated economic value and benefits of Yongsan National Park, which will be constructed by financial investment of the government and objectively estimated the real value of it by understanding the value of the park from a user's view of the park. For this, the value of Yongsan National Park is divided into using value such as carbon reduction and the function of relieving urban heat island as an environmental material and non-using value based on willingness to pay of the public according to the construction of the park. As a result of the analysis, it was found out that the using value of Yongsan National Park would reach 130 million won up to maximum level of 450 million won per year, and the non-using value was analyzed to be worthy of 2,344 won per capita every month. Besides, economic ripple effect that can be expected in the process of the park construction project was analyzed to be a national policy that creates effect on production inducement of 2.6 trillion won and value added of 809.6 billion won and new jobs for 25,620 persons. Considering the value of Yongsan National Park and the effect of the project based on the result of this study, it was found that it could sufficiently secure the validity of implementing the project compared to the financial investment by the government. Therefore, it must be emphasized that diffusion strategy is necessary for national understanding and for a nation to make it understood its appropriateness widely in respect to the construction of Yongsan National Park for the successful construction of Yongsan National Park and to raise its using value in the future.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

A Study on Assesment of Aalidity of Introducing of Design·Construction·Supervision Register Criteria Measures for Hazardous Materials Facilities (위험물시설의 설계·시공·감리업 등록제 도입에 대한 타당성 검토에 관한 연구)

  • Cha, Jung-Min;Lee, Yong-Jae;Kim, In-Beom;Hyun, Seong-Ho
    • Fire Science and Engineering
    • /
    • v.29 no.1
    • /
    • pp.27-37
    • /
    • 2015
  • This study is to analyze current inadequate status of installing hazardous materials facilities, and to propose rational standards by researching validity for implementing registration for design, construction, supervision for installing fire safety facilities. By studying installation of registering designing, constructing, supervising industry on hazardous material facilities, professional and higher level of stability measures for national hazardous material facility was provided. For above reasons, necessity of institutionalizing of registering standards for construction and supervising industry became clear. Much more gradual institutionalization is needed for construction industry. Moreover, new national qualification should be reconsidered, in order to rebuttal the above and also to cultivate and acquire technical power.

A Study on Establishing Entry Strategies of Private Engineering Firms in the Overseas Urban Development Market (기업의 해외 도시개발 시장진출을 위한 전략수립에 관한 연구 - IPA 기법을 중심으로 -)

  • Song, Hokyoung;Yu, Youngsu;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.86-95
    • /
    • 2019
  • As the urban development economy is stagnating due to the reduction of the budget for Social Overhead Capital (SOC) and the stabilization policy of the real estate market, there is a steady increase in the interest of domestic construction companies to enter the overseas market. However, domestic construction companies are showing a decline in overseas urban development market as compared with advanced foreign companies having excellent financial management and overseas project management ability. Therefore, it is necessary for domestic companies to select an urban development model that meets the environment and the level of the country of entry, and to establish an advance strategy to manage the risks of overseas business. For this purpose, the factors of entry into the overseas urban development market through the existing research, literature analysis, and FGI were derived, and survey strategy and IPA analysis were conducted to develop strategies for entering the overseas urban development market. As a result, we have established a strategy for private companies to enter the overseas urban development market.

Development of Embedded Board for Construction of Smart Factory (스마트 팩토리 구축을 위한 임베디드 보드 개발)

  • Lee, Yong-Min;Lee, Won-Bog;Lee, Seung-Ho
    • Journal of IKEEE
    • /
    • v.23 no.3
    • /
    • pp.1092-1095
    • /
    • 2019
  • In this paper, we propose the development of an embedded board for construction of smart factory. The proposed embedded board for construction of smart factory consists of main module, ADC module, I/O module. Main module is a main calculating device which includes communication pard that allows interface with external device with using industrial protocol and is ported operating system makes board operating into. ADC module takes part in transferring digital signal has converted from electrical signal to the main module from the external sensor which is installed on the field. I/O module is an input and output module which transfers to the main module about a status, alarm, command signal of field device and it has a function that blocks external noises from field device with isolation circuit into it. In order to evaluate the performance of the proposed embedded board for construction of smart factory, it has been tested by an authorized testing institute. As a result, quantity of interacting protocol was 5, speed of hardware clock synchronization was under 10us and operating time of battery without source power was over 8 hours. It produced the same result as the world's highest level.

Development of AR System for Asphalt Pavement Compaction Operation and Suggestion for Accompanying Education Program (AR을 이용한 아스팔트 포장 다짐공사 지원 시스템 구축 및 교육과정 제안)

  • Kim, Namho;Cho, Namjun;Kim, Noah
    • Journal of Practical Engineering Education
    • /
    • v.11 no.1
    • /
    • pp.33-41
    • /
    • 2019
  • A pavement construction process consists of series of lay-down operation for pavement materials to form a designated thickness and compaction operation for the lay-down layer to form a designated strength. A technological breakthrough in pavement compaction equipment was made in last 15 years in western countries: intelligent compaction roller, that is equipped with GPS along with other pavement response sensors is becoming a game-changer in pavement construction. This paper introduces AR system that may be used in asphalt pavement compaction operation using intelligent compactor. Since AR technology is very new concept in road construction society, a suggestion for accompanying education program was also made for specific task group in pavement compaction operation. Since AR technology has not been introduced in asphalt pavement compaction operation, the AR compaction management would lead the construction quality of asphalt pavement to the beyond level.

A Case Study on Public Building Construction Method by Public-Private Partnership in Japan (일본의 민관협력에 의한 공공건축 조성방식 사례 연구)

  • Youm, Chirl-Ho
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.12
    • /
    • pp.3-12
    • /
    • 2018
  • The purpose of this study is to draw implications for revitalizing public-private partnership system that can reduce the financial burden of the government and utilize the creative know-how of the private sector by analyzing the cases of public building construction projects by public-private partnership method in Japan. In this study, first of all, I looked at the current state of public-private partnership policy in Japan and then selected 8 representative projects as an analysis target. Next, in order to grasp the specific situation that is aimed at securing publicity and revitalizing private participation, I analyzed the role sharing between public and private sectors in the maintenance and management of public buildings, and examined the conditions for private revenue facilities. As a result of the analysis, the following implications were drawn. First, the methods of public building construction by public-private partnership in Japan are largely divided into BTO method based on the PFI method, and the method of installing public facilities and private revenue facilities based on the term leasehold rights system. Second, measures were taken to mitigate the burden of the state and local governments in establishing public facilities. Third, the public has delegated to the private sector actively about the role that the private sector can play, expanding the role of private sector widely from design to operation in the public building construction projects. Fourth, in order to actively participate in private sectors and promote regional revitalization, private profit-making projects are widely accepted, but consideration has been given to guarantee a certain level of publicity.

Development of a Lightweight Construction Material Using Hollow Glass Microspheres (중공 유리 마이크로스피어를 활용한 경량 소재 개발)

  • Lee, Nankyoung;Moon, Juhyuk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.449-455
    • /
    • 2022
  • Concrete is the most widely used construction material. The heavy self-weight of concrete may offer an advantage when developing high compressive strength and good dimensional stability. However, it is limited in the construction of super-long bridges or very high skyscrapers owing to the substantially increased self-weight of the structure. For developing lightweight concrete, various lightweight aggregates have typically been utilized. However, due to the porous characteristics of lightweight aggregates, the strength at the composite level is generally decreased. To overcome this intrinsic limitation, this study aims to develop a construction material that satisfies both lightweight and high strength requirements. The developed cementitious composite was manufactured based on a high volume usage of hollow glass microspheres in a matrix with a low water-to-cement ratio. Regardless of the tested hollow glass microspheres from among four different types, compressive strength outcomes of more than 60 MPa and 80 MPa with a density of 1.7 g/cm3 were experimentally confirmed under ambient and high-temperature curing, respectively.

TCA: A Trusted Collaborative Anonymity Construction Scheme for Location Privacy Protection in VANETs

  • Zhang, Wenbo;Chen, Lin;Su, Hengtao;Wang, Yin;Feng, Jingyu
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.10
    • /
    • pp.3438-3457
    • /
    • 2022
  • As location-based services (LBS) are widely used in vehicular ad-hoc networks (VANETs), location privacy has become an utmost concern. Spatial cloaking is a popular location privacy protection approach, which uses a cloaking area containing k-1 collaborative vehicles (CVs) to replace the real location of the requested vehicle (RV). However, all CVs are assumed as honest in k-anonymity, and thus giving opportunities for dishonest CVs to submit false location information during the cloaking area construction. Attackers could exploit dishonest CVs' false location information to speculate the real location of RV. To suppress this threat, an edge-assisted Trusted Collaborative Anonymity construction scheme called TCA is proposed with trust mechanism. From the design idea of trusted observations within variable radius r, the trust value is not only utilized to select honest CVs to construct a cloaking area by restricting r's search range but also used to verify false location information from dishonest CVs. In order to obtain the variable radius r of searching CVs, a multiple linear regression model is established based on the privacy level and service quality of RV. By using the above approaches, the trust relationship among vehicles can be predicted, and the most suitable CVs can be selected according to RV's preference, so as to construct the trusted cloaking area. Moreover, to deal with the massive trust value calculation brought by large quantities of LBS requests, edge computing is employed during the trust evaluation. The performance analysis indicates that the malicious response of TCA is only 22% of the collaborative anonymity construction scheme without trust mechanism, and the location privacy leakage is about 32% of the traditional Enhanced Location Privacy Preserving (ELPP) scheme.