• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.032 seconds

A Study on the Risk Analysis of Construction Method (건축공법 내부 리스크 분석에 관한 연구)

  • Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.131-135
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

Construction of the reduced system by two-level scheme and time integration in the reduced system under arbitrary loading (2단계 축소기법에 의한 축소시스템의 구성과 동하중에 의한 구조물의 동적 거동에 관한 연구)

  • Kim, Hyun-Gi;Cho, Maeng-Hyo
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.453-458
    • /
    • 2004
  • This study proposes a new two-level condensation scheme for the construction of a reduced system. In the first step, the candidate area is selected for the construction of the reduced system by energy estimation in element-level. In the second step, primary degrees of freedom are selected by sequential elimination from the candidate degrees of freedom linked to the selected elements. Numerical examples demonstrate that the proposed method saves the computational cost effectively and provides a reduced system which predicts the eigenvalues accurately. Moreover, the well-constructed reduced system can present the reliable behavior of the structure under arbitrary dynamic loads comparing to that of global system. Time integration in a reduced system can save the computing time remarkably. Through a few numerical examples, the efficiency and reliability of the proposed scheme are verified.

  • PDF

A STUDY OF SHOULDERING OF COMPENSATORY LIABILITY FOR DELAYED CONSTRUCTION FERIODS FOLLOWING BAD WEATHER CONDITIONS

  • Tae-Sang Jeong ; Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.705-708
    • /
    • 2005
  • In the case that construcion period is delayed because of the force majeure such as a typhoon or a flood, the owners in general should compensate the damages caused by those. But with exception the weather worsening of ordinary level is paid by contractors, while that of exceptional level by the owners. It is critical that it is difficult to distinguish objectively between ordinary and exceptional level weather worsening. Although the term of "ordinary" itself is too abstractive, we can reduce the disputes between owners and contractors by setting the appropriate and objective standard of distinction. For example in the case of rainfall it may be the standard of distinction whether the days of actual rainfall exceed those of average rainfall or not. If the days of actual rainfall don't exceed those of average rainfall contracters should pay the damages because it is distinguished with a ordinary level weather worsening. Besides the standard of distinction in another weather worsening such as severe cold/hot, strong wind etc. which have a effect on delaying the term of works could be settled as a similar model.

  • PDF

A Proposal for Development of the Certification and Level System of Construction Craft Workers (건설기능인력 자격 및 직급체계 구축방안 제안)

  • Kim, Bong-Ju;Jung, Myung-Ho;Hyun, Chang-Taek;Koo, Kyo-Jin;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.105-114
    • /
    • 2006
  • The construction craft workers have been getting older and have become drained, in spite of the vital factor that it directly affects productivity and quality as a final producer. This situation in the construction industry is ultimately due to evasion of performances by young craft workers. Therefore, the aim of this study is to propose the certification and level system of construction craft workers and to extract young craft workers from the market for construction craft workers so as to supply and demand high quality of craft workers. First of all, the present status and problems of the domestic construction craft workers are considered in this study. Furthermore, the appropriate way to establish its certification and level system is suggested from the Interview with experts, as well as references of German and Australian case. The revitalization of certification and level system provided in this study is expected to ensure that the craft workers are not simple laborers, but are required the professional knowledge and skill. Besides, it will lead to strengthen specificity and to break from aging, by taking young and qualified craft workers into the construction industry. Also, it will promote an employment stability by connecting the social security system.

Correlation Analysis Between Awareness of the Serious Accidents and Safety Consciousness of Construction Workers Under the Act on the Punishment of Serious Accidents (중대재해처벌법 인지 정도와 건설 근로자 안전 의식 수준의 상관관계분석)

  • Seo, Youngjun;Kim, Seulgi;Lee, Dongyeope;Jung, Junhwi;Kim, Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.47-57
    • /
    • 2024
  • The purpose of this study was to analyze the Correlation Analysis between Awareness of the Serious Disaster and Safety Consciousness of Construction Workers under the Act on the Punishment of Serious. A survey was conducted on construction workers, construction managers, and safety managers. The results of this study were as follows; The correlation analysis conducted among the three groups indicated a significant correlation, with safety managers demonstrating the highest correlation, followed by construction managers and construction workers, and all three groups exhibited a moderate correlation. The correlation analysis conducted for the entire group also revealed a significant correlation, and as the number of participants increased, higher correlation coefficients were observed. Furthermore, to ascertain the significance of the correlation coefficients, a comparison was made between the p-value and the significance level (α). Consequently, a p-value smaller than the significance level of 0.05 was obtained, leading to the rejection of the null hypothesis and the acceptance of the alternative hypothesis. Therefore, it can be concluded that there is a relationship between the level of awareness of the serious Accidents Punishment Act and the level of Safety Consciousness of Construction. One limitation of this study is that it relied on a subjective indicator through a survey, which may introduce variability in the difficulty level of the questionnaire items.

Study on the Impact Of Tunnel Construction on Geo-environment - Simulation study on the Gyerong tunnel - (터널굴착이 지반환경에 미치는 영향에 관한 연구 - 계룡산 터널의 시뮬레이션 결과를 중심으로 -)

  • Lim, Hyung-Gyu;Chang, Yoon-Young
    • Journal of Soil and Groundwater Environment
    • /
    • v.13 no.5
    • /
    • pp.88-95
    • /
    • 2008
  • In this study, impact of tunnel construction on groundwater level and flow was investigated by simulation modeling, and tried to find optimal assessment method for minimization of geo-environmental problems due to tunnel construction. As a study area, Gyerong mountain area scheduled for tunnel construction was selected and the impact of tunnel construction on geo-environment compared to situation before construction was simulated. Simulation result showed that groundwater level down was observed during tunnel construction and recovered after completion of tunnel construction.

Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction - (건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로-)

  • Bok, Hoon;Kim, Hyeong-Tae;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

A Study on the Definition of the Term "Tectonics" in Architecture

  • Kim, Ran Soo
    • Architectural research
    • /
    • v.8 no.2
    • /
    • pp.17-26
    • /
    • 2006
  • This paper attempts to identify the term "tectonics" comprehensively by collecting and categorizing existing definitions of tectonics within the architectural area rather than to stress the concept of tectonics of each specific theorist. Although no consensus of opinion on the concept of tectonics exists, architectural tectonics was closely related to the following terms in three categories: 1. $techn\acute{e}$, technique, and technology; 2. construction and structure; and 3. stereotomics. Based on its etymology, system, and material construct, the notion of tectonics common in these three categories signifies "the art of framing construction," in which linear elements are connected with joints and clad or infilled with lightweight material. Thus, the art of framing construction, as a common concept of tectonics, reveals the following characteristics: First, tectonics is based on framing construction in contrast to piling-up construction as the etymology of tectonics signifies the art of carpentry. Then, the term tectonics, dealing as it does with a higher level of construction rather than the mechanical level of structure, incorporates the poetic aspect of techne as well as the rational aspect of technology. Third, Owing to the organic, double system of tectonic frame and incrusting or infilling materials, the tectonic body becomes both the ornament and the structure simultaneously. As the art of framing construction is based on material construction rather than structural or ornamental form, this paper proposes that one can view tectonics as a term that conveys the meaning of the actual material effect on space.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF