Journal of the Korea Institute of Building Construction
/
v.2
no.4
/
pp.131-135
/
2002
The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.
This study proposes a new two-level condensation scheme for the construction of a reduced system. In the first step, the candidate area is selected for the construction of the reduced system by energy estimation in element-level. In the second step, primary degrees of freedom are selected by sequential elimination from the candidate degrees of freedom linked to the selected elements. Numerical examples demonstrate that the proposed method saves the computational cost effectively and provides a reduced system which predicts the eigenvalues accurately. Moreover, the well-constructed reduced system can present the reliable behavior of the structure under arbitrary dynamic loads comparing to that of global system. Time integration in a reduced system can save the computing time remarkably. Through a few numerical examples, the efficiency and reliability of the proposed scheme are verified.
International conference on construction engineering and project management
/
2005.10a
/
pp.705-708
/
2005
In the case that construcion period is delayed because of the force majeure such as a typhoon or a flood, the owners in general should compensate the damages caused by those. But with exception the weather worsening of ordinary level is paid by contractors, while that of exceptional level by the owners. It is critical that it is difficult to distinguish objectively between ordinary and exceptional level weather worsening. Although the term of "ordinary" itself is too abstractive, we can reduce the disputes between owners and contractors by setting the appropriate and objective standard of distinction. For example in the case of rainfall it may be the standard of distinction whether the days of actual rainfall exceed those of average rainfall or not. If the days of actual rainfall don't exceed those of average rainfall contracters should pay the damages because it is distinguished with a ordinary level weather worsening. Besides the standard of distinction in another weather worsening such as severe cold/hot, strong wind etc. which have a effect on delaying the term of works could be settled as a similar model.
Kim, Bong-Ju;Jung, Myung-Ho;Hyun, Chang-Taek;Koo, Kyo-Jin;Moon, Hyun-Seok
Korean Journal of Construction Engineering and Management
/
v.7
no.5
/
pp.105-114
/
2006
The construction craft workers have been getting older and have become drained, in spite of the vital factor that it directly affects productivity and quality as a final producer. This situation in the construction industry is ultimately due to evasion of performances by young craft workers. Therefore, the aim of this study is to propose the certification and level system of construction craft workers and to extract young craft workers from the market for construction craft workers so as to supply and demand high quality of craft workers. First of all, the present status and problems of the domestic construction craft workers are considered in this study. Furthermore, the appropriate way to establish its certification and level system is suggested from the Interview with experts, as well as references of German and Australian case. The revitalization of certification and level system provided in this study is expected to ensure that the craft workers are not simple laborers, but are required the professional knowledge and skill. Besides, it will lead to strengthen specificity and to break from aging, by taking young and qualified craft workers into the construction industry. Also, it will promote an employment stability by connecting the social security system.
Seo, Youngjun;Kim, Seulgi;Lee, Dongyeope;Jung, Junhwi;Kim, Daeyoung
Korean Journal of Construction Engineering and Management
/
v.25
no.3
/
pp.47-57
/
2024
The purpose of this study was to analyze the Correlation Analysis between Awareness of the Serious Disaster and Safety Consciousness of Construction Workers under the Act on the Punishment of Serious. A survey was conducted on construction workers, construction managers, and safety managers. The results of this study were as follows; The correlation analysis conducted among the three groups indicated a significant correlation, with safety managers demonstrating the highest correlation, followed by construction managers and construction workers, and all three groups exhibited a moderate correlation. The correlation analysis conducted for the entire group also revealed a significant correlation, and as the number of participants increased, higher correlation coefficients were observed. Furthermore, to ascertain the significance of the correlation coefficients, a comparison was made between the p-value and the significance level (α). Consequently, a p-value smaller than the significance level of 0.05 was obtained, leading to the rejection of the null hypothesis and the acceptance of the alternative hypothesis. Therefore, it can be concluded that there is a relationship between the level of awareness of the serious Accidents Punishment Act and the level of Safety Consciousness of Construction. One limitation of this study is that it relied on a subjective indicator through a survey, which may introduce variability in the difficulty level of the questionnaire items.
In this study, impact of tunnel construction on groundwater level and flow was investigated by simulation modeling, and tried to find optimal assessment method for minimization of geo-environmental problems due to tunnel construction. As a study area, Gyerong mountain area scheduled for tunnel construction was selected and the impact of tunnel construction on geo-environment compared to situation before construction was simulated. Simulation result showed that groundwater level down was observed during tunnel construction and recovered after completion of tunnel construction.
Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
This paper attempts to identify the term "tectonics" comprehensively by collecting and categorizing existing definitions of tectonics within the architectural area rather than to stress the concept of tectonics of each specific theorist. Although no consensus of opinion on the concept of tectonics exists, architectural tectonics was closely related to the following terms in three categories: 1. $techn\acute{e}$, technique, and technology; 2. construction and structure; and 3. stereotomics. Based on its etymology, system, and material construct, the notion of tectonics common in these three categories signifies "the art of framing construction," in which linear elements are connected with joints and clad or infilled with lightweight material. Thus, the art of framing construction, as a common concept of tectonics, reveals the following characteristics: First, tectonics is based on framing construction in contrast to piling-up construction as the etymology of tectonics signifies the art of carpentry. Then, the term tectonics, dealing as it does with a higher level of construction rather than the mechanical level of structure, incorporates the poetic aspect of techne as well as the rational aspect of technology. Third, Owing to the organic, double system of tectonic frame and incrusting or infilling materials, the tectonic body becomes both the ornament and the structure simultaneously. As the art of framing construction is based on material construction rather than structural or ornamental form, this paper proposes that one can view tectonics as a term that conveys the meaning of the actual material effect on space.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.294-295
/
2018
Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.