• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.033 seconds

A Study about Appraise on Acoustic Performance of small-scaled Multi-Purpose Hall, using Auralization (가청화를 이용한 소규모 다목적 홀의 음향 성능평가에 관한 연구)

  • Ju, Duck-Hoon;Yun, Jae-Hyun;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.148-152
    • /
    • 2007
  • In recent days, on account of the cultural development and the improvement of citizen's consciousness level, it is the real situation that the construction of small-scaled Multi-Purpose Hall where various cultural events could be performed, is on increasing. However, since the most of Multi-Purpose Hall had been designed and built up without any consideration on Acoustic Factor, many problems are on occurring thereat. Since those small-scaled Multi-Purpose Hall have been mostly used with the finishing material which contains a high degree of Acoustic Absorption indiscreetly, both diffusion and reflection of sound are not establishing properly, and because thereverberation of sound is very low, in case of musical performance by musical instrument, its sound hears too arid and stiff, there occurs some acoustic defect such as it becomes difficult for music appreciation with sufficient timbre, so that the capability improvement on the matter is urgently requiring situation. Therefore, this Study has tried to seize the satisfaction level about the small-scaled Multi-Purpose Hall after betterment of the acoustic performance by appraise the acoustic condition of the Hall, using Auralization Technique that can experience Virtual Acoustic Field regarding to the small-scaled Multi-Purpose Hall as its object. It is deemed that such research result could be practically used as the useful material which enables to bring a reduction effect of construction cost as well asenhancement of the acoustic performance through its presupposition?control on the acoustic problem when construction or renovation of other similar small-scaled Multi-Purpose Hall in the future.

  • PDF

A Study on the Properties of Roller Compacted Concrete Pavement for Environmental Friendly Bike Road (친환경 자전거도로를 위한 롤러 다짐 콘크리트 포장의 기초물성에 관한 연구)

  • Lee, Chang-Ho;Kang, Jae-Gyu;Park, Cheol-Woo;Lee, Seung-Woo
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.103-111
    • /
    • 2010
  • Recently, usage bicycle has been encouraged to reduce energy consumption and $CO_2$. For this purpose, lots of bike road construction are planned. Typical type of pavement used in bikeroad such as asphalt concrete pavement, portland cement concrete pavement, colored pavement, soil pavement. However, these pavement types may need high construction cost comparing the required capacity of bike road. In this study, roller compacted concrete pavement which are economical and durable, are investigated to use as bike road pavement. The optimum compaction level and mix design of roller compacted concrete pavement are suggested by exploring strength test with various mixture ratio and compaction level, Also durability was examined based on freeze-thaw and scaling test. In addition, the cost and amount of carbon emission during in the construction of roller compacted concrete were evaluated and compare with the cost and carbon emission of typical portland cement concrete.

A Study on the Staffs of the Governmental Organization of Construction in the Old-Korean Empire - focused on the Architectural Office controlled by the Ministry of Finance - (구한국시대(舊韓國時代) 정부공사기구(政府工事機構)의 직원(職員)에 관(關)한 연구(硏究) - 도지부건축소(度支部建築所)를 중심(中心)으로 - .)

  • Kim, Tae-Jung;Kim, Soon-Il
    • Journal of architectural history
    • /
    • v.2 no.1 s.3
    • /
    • pp.54-73
    • /
    • 1993
  • This study focuses on the staffs of the Governmental Organization of Construction who actually led this organization. Two main points of this study are as follows; 1) The composition and appointment of staffs, before and after the Korea-Japan Treaty in 1907, are evaluated, and 2) The working and academic career of each personnel are analyzed in connection with understanding of internal characteristics of this organization. Special attention is given to Korean personel and Japanese engineers who undertook a leading role. Korean engineering staffs were very few in number. It is thought, viewing their records of careers, that almost all of them didn't have any engineering basis, and simply they had some relations to Japan. It is certain that their role in this organization was interpreters using their Japanese language ability, and their roles were only limited to non-technical areas, if any. The early engineers from Japan were selected among the officials with comparatively rich careers of the Temporary Architectural Dept. or the Temporary Engineering Dept. of Custom House in Japan. But, in later days, the quality of Japanese engineers changed to the level of premature without practical experiences who unwillingly came to Korea to have a job under the depression of construction economy of Japan. The academic careers of Japanese engineers were various, from self-taught to regural college education, but the leading engineers were from Tokyo University. The civil engineers became high-level technical officials in the Government-General after the Japanese Annexation of Korea. But, sometimes later, many of the architectural engineers became practicing architect managing design offices on private basis.

  • PDF

A Study for Finding Optimized Cable Forces of Cable Stayed Bridge (사장교 케이블 최적 장력 보정에 관한 연구)

  • Park, Dae-Yong
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.3 no.1
    • /
    • pp.16-20
    • /
    • 2012
  • During construction of the cable-stayed bridge, not only shape of deck and pylon but also cable forces are main factors for geometry control. Especially, geometry control of deck must be controlled for adjusting design value of vertical and lateral alignment as well as closing of key segment. Also, both the deck level error and cable force error occur necessarily during the construction stage in cable stayed bridge. The errors are caused by different of material properties and computer modeling, and construction mistake, and so on. These causes bring about that the forces of cable and the displacement of deck show different tendency from the theoretical values. Therefore, these errors must necessarily be adjusted and can be improved through adjustment of cable length. In this study, a new optimization tool is proposed to adjust the errors of the second Dolsan cable-stayed bridge.

Initial Performance Evaluation of Fine-size Exposed Aggregate PCC Pavement by Experimental Construction (시험시공을 통한 소입경 골재노출 콘크리트포장의 초기 공용성 평가)

  • Kim, Young-Kyu;Choi, Don-Hwa;Lee, Seung-Woo;Kim, Hyung-Bae
    • International Journal of Highway Engineering
    • /
    • v.12 no.1
    • /
    • pp.87-98
    • /
    • 2010
  • Surface of fine-size exposed aggregate Portland cement concrete pavements is consists of exposed coarse aggregate by removing upper 2~3mm mortar of concrete slab. Fine-size exposed aggregate PCC pavements have advantages of maintaining low-noise and adequate skid-resistance level during the performance period. In order to provide the successful exposed concrete aggregate pavement, uniform distribution of the coarse aggregate on pavement surface through adequate the mix design and exposing method. In this study, evaluated initial performance of fine-size exposed aggregate PCC pavement by experimental construction. And it was known that fine-size exposed aggregate concrete pavement which can reduce the noise and maintain the adequate level of skid resistance and strength.

A Study on Affecting Factor-Construction of Collaborative Planning Process and Effect on Comprehensive Rural Village Development Project (농촌마을종합개발사업의 협력적 계획과정과 계획효과의 영향구조 분석)

  • Kim, Tae-Gu;Lee, Seong-Keun
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.23-43
    • /
    • 2014
  • This study aims to analyze the affecting factors-construction of collaborative planning process and effect on Comprehensive Rural Village Development Project. To this end, targeting the 36 districts which were selected for 2004 Comprehensive Rural Village Development Project and completed their 2010 5-year projects, components of collaborative planning process and planning effect will be drawn and the affecting factors-construction of collaborative planning and effect on Comprehensive Rural Village Development Project will be analyzed below. According to the results of this study, the affecting factors of collaborative planning process of Comprehensive Rural Village Development Project on planning effect, The level of effect of individual component on endogenous variable appeared greatest mostly in the upper groups. In terms of the level of individual component effect, social learning process and interaction among participants affected greatest. The process of Comprehensive Rural Village Development Project is evaluated that it reflected collaborative planning theory of Healey enough. Therefore, in the course of Comprehensive Rural Village Development Project progress, collaborative planning model must pass social learning process and interaction among participants which are the most important components out of collaborative planning process as we saw in the upper groups. And in order to maximize the performance and results of Comprehensive Rural Village Development Project, the following sequential affecting factors model as Figure 7 must be suggested as optimal collaborative planning models of Comprehensive Rural Village Development Project. Based on the results of the study, the policy implication was drawn as follows. First, systematic supplementations in the form of a consultative body are required to perform Comprehensive Rural Village Development Project efficiently. Second, network needs to be built among different participants in Comprehensive Rural Village Development Project process. Third, systematic mechanism is required to improve social learning among different participants. Fourth, systematic rearrangement is required to guarantee the residents' realistic participation in the course of Comprehensive Rural Village Development Project process.

An Analytical Study on the Structural Performance Evaluation of the Multistage Overturing Movable Gate (다단전도방식 가동보의 구조성능 평가를 위한 해석적 연구)

  • Choi, Jin Woo;Joo, Hyung Joong;Kim, Jung Min;Lee, Kyu Shick;Yoon, Soon Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.6
    • /
    • pp.613-622
    • /
    • 2013
  • Numerous water gates have been constructed and are under construction for the control of water level because, due to the topographical characteristics of mountainous area, many small size rivers are developed in Korean peninsula. Among the water gates, movable water gates are more efficient to control water level than the fixed water gates. By the field application of the movable water gates, many problems associated with the fixed water gates have been mitigated. The problems include the bottom water pollution, the change of habitats for the riparian organisms, etc. This is the reason to increase the field application of movable water gates. In the paper we present the result of analytical investigation pertaining to the structural behavior of multistage overturning movable water gate which is one of the movable water gates. In the analytical investigations, the finite element analysis on the constructed water gate has been conducted for illustration purposes and it was found that the multistage movable water gate is much better than the fixed and/or existing movable water gates in the point of structural and environmental performances.

Ventilation System Strategy for a Prospective Korean Radioactive Waste Repository (한국형 방사성 폐기물 처분장을 위한 환기시스뎀 전략)

  • Kim Jin;Kwon Sang-Ki
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.3 no.2
    • /
    • pp.135-148
    • /
    • 2005
  • In the stage of conceptual design for the construction and operation of the geologic repository for radioactive wastes, it is important to consider a repository ventilation system which serves the repository working environment, hygiene & safety of the public at large, and will allow safe maintenance like moisture content elimination in repository for the duration of the repositories life, construction/operation/closure, also allowing safe waste transportation and emplacement. This paper describes the possible ventilation system design criteria and requirements for the prospective Korean radioactive waste repositories with emphasis on the underground rock cavity disposal method in the both cases of low & medium-level and high-level wastes. It was found that the most important concept is separate ventilation systems for the construction (development) and waste emplacement (storage) activities. In addition, ventilation network system modeling, natural ventilation, ventilation monitoring systems & real time ventilation simulation, and fire simulation & emergency system in the repository are briefly discussed.

  • PDF

Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

The analysis of the Knowledge Construction Types in Educational on-line Games On the Basis of the level of the Self-Regulated Learning (자기조절학습 수준에 따른 교육용 온라인게임에서의 지식구성과정 유형 분석 연구)

  • Jung, Jae-Yeob;Kim, Keon-Seok;Park, Hyung-Sung
    • Journal of Korea Game Society
    • /
    • v.6 no.3
    • /
    • pp.51-66
    • /
    • 2006
  • According to this recent change of the educational stream, the researcher sought to find the relationship between the level of students' Self-Regulated Learning and the Knowledge Construction Process strategies they use to succeed at an educational on-line game, and attempt to make some suggestions on the design and use of educational on-line games in this study. In conclusion, the change in the education paradigm requires students to pursue and produce contextual knowledge by using various media and learning environments. Some theoretical backgrounds, related to situated learning theory and the use of supporting educational media, are necessary. As contextual educational media, On-line games can be expected to play the role of evoking fresh perspective towards all the aspects of education.

  • PDF