DOI QR코드

DOI QR Code

A Study for Finding Optimized Cable Forces of Cable Stayed Bridge

사장교 케이블 최적 장력 보정에 관한 연구

  • 박대용 (대림산업 기술개발원 특수교량팀)
  • Received : 2012.01.05
  • Accepted : 2012.02.06
  • Published : 2012.03.31

Abstract

During construction of the cable-stayed bridge, not only shape of deck and pylon but also cable forces are main factors for geometry control. Especially, geometry control of deck must be controlled for adjusting design value of vertical and lateral alignment as well as closing of key segment. Also, both the deck level error and cable force error occur necessarily during the construction stage in cable stayed bridge. The errors are caused by different of material properties and computer modeling, and construction mistake, and so on. These causes bring about that the forces of cable and the displacement of deck show different tendency from the theoretical values. Therefore, these errors must necessarily be adjusted and can be improved through adjustment of cable length. In this study, a new optimization tool is proposed to adjust the errors of the second Dolsan cable-stayed bridge.

사장교의 시공에 있어서 보강형과 주탑의 형상 및 케이블 장력은 형상관리시 주요한 관리 항목이다. 특히 보강형의 형상은 Keg Segment의 원활한 폐합뿐만 아니라 계획된 종단 및 횡단 선형을 구현하기 위해 필수적으로 관리되어야 한다. 사장교에서 단계별 시공을 진행함에 따라 보강형 레벨과 케이블 장력 오차는 피할 수 없으며, 이러한 오차는 크게 재료 물성치와 모델링상의 오차, 제작 및 시공에 의해 발생하는 오차 등으로 나눌 수 있다. 이러한 오차로 인해 케이블의 장력과 구조물의 처짐 또는 변위가 이론적인 해석값과 다르게 나타나며, 이에 대한 보정은 케이블의 길이 조정으로 수행하게 된다. 본 연구에서는 제2돌산대교에서 사용된 오차를 보정하는 새로운 최적화 기법을 소개하고자 한다.

Keywords

References

  1. 임덕기(2009) 사장교 시공중 오차 보정 시스템 개발 및 현장적용사례연구, 한국강구조학회학술대회 발표집, pp.105-108.
  2. 조서경(2002) 사장교 켄틸레버 가설공법에서의 형상관리, 대한토목학회논문집, 제50권 제12호, pp.621-625.
  3. Furukawa, K., Sugimoto, H., Egusa, T., Inoue, K. and Yamada, Y. (1987) Studies on Optimization of Cable Prestressing for Cable-Stayed Bridges, Proceedings of International Conference on Cable-Stayed Bridges, Bangkok, Thailand, pp.723-734.
  4. Furuta H., Kanei M., Kanyyoshi M., Tanaka H. (1993) Optimum cable tension adjustment using fuzzy mathematical programming, Proceeding of 2nd International Symposium on Uncertainty Modeling and Analysis, IEEE, pp.506-513.
  5. FIB bulletin 30 (2005) Acceptance of stay cable systems using prestressing steels, International Federation for Structural Concrete: Switzerland.
  6. K. Jung, H.S. Lee (2008) Development of Geometry Control System for Cable-Stayed Bridges and Application to the Incheon Bridge, Bridge Maintenance, Safety, Management, Health Monitoring and Informatics, pp. 3431-3438
  7. Kaneyoshi M., Tanaka H., Kamei M., Furuta H. (1990) New system identification technique using fuzzy regression analysis, Proceeding of 1st International Symposium on Uncertainty Modeling and Analysis, IEEE, pp.528-533.
  8. PTI (2000) Recommendations for stay cable design, testing and installation, Post-Tensioning Institute: Phoenix, Arizona.
  9. Tanaka, H., Kamei, M., Kaneyoshi, M. (1987) Cable Tension Adjustment by Structural System Identification, Proceedings of International Conference on Cable Stayed Bridges, Bangkok Thailand, 18-20 November, pp.856-868.

Cited by

  1. Determination of Anchor Location of Stiffened Girder connected to Cable in Cable Stayed Bridge vol.9, pp.3, 2012, https://doi.org/10.11004/kosacs.2018.9.3.079