• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.029 seconds

Experimental Study on the Infilling Characteristics of CFT Column Infilled by Pumping-Up Below (하부압입공법에 의한 콘크리트 충전강관(CFT)기둥의 충전특성에 관한 실험적 연구)

  • Kim, Myoung Mo;Jeon, Sang Woo
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.2
    • /
    • pp.375-383
    • /
    • 2002
  • To evaluate the applicability of the construction method involving infilling CFT columns by pumping-up, a trial construction was done using 6 actual size test samples. The 12.8m-high test samples were similar to a four-story building scale. The pumping-up level was controlled at 12m. The test used two types of high performance concrete with $450kgf/cm^2$ standard design strength, and a concrete pump which is used domestically. The pressure changes in pipes or pump as well as the changes in concrete characteristics were measured during construction. in order to evaluate applicability. After the concrete hardened, the column was dismantled. The filled state of the concrete, concrete strength distribution according to column height, etc., were checked to evaluate the quality of the concrete, From the results, some basic data which characterize the pumping-up pressure were suggested. Also, the strength of hardened concrete as well as the filled state were proven to be acceptable ranges.

A Case Study for Creativity Assessment of Problem Solving Process of Mathematically Gifted High School Students Utilizing Construction Protocol of GeoGebra (GeoGebra의 구성단계 기능을 활용한 고등학교 수학 영재 문제해결 과정의 창의성 평가 사례 연구)

  • Yang, Seonghyun
    • Journal of Gifted/Talented Education
    • /
    • v.24 no.6
    • /
    • pp.897-916
    • /
    • 2014
  • In this study, we presented a teaching-learning method that can apply process-focused assessment for mathematical creativity of problem solving process of the gifted student, By necessity of appropriate teaching-learning program development to the level and ability of students who belong to high school gifted classes and courses evaluation for students who participated in education programs for the gifted. In the construction implementation process of students utilizing a kind of teaching-learning software, GeoGebra. We analyzed process of a variety of creative constructing figures using interfaces of GeoGebra and algebraic calculation. Utilizing 'Construction Protocol' and 'Navigation Bar' of GeoGebra, We identified computer languages, construction order, run times used in construction process of individual student and found mathematical creativity of students in the process. Comparing this result with prerequisite learning degree of individual student, We verified that this teaching-learning method can apply at the high school gifted classes as well as institutes for the gifted education in the city office.

The Program Development for Environmental Quality Level and Evaluation of Carbon Dioxide Emission in Construction Works (건설사업의 환경성 및 CO2 배출 평가 프로그램 개발)

  • Lee, Kyoung Hee;Kim, Hyo-Jin;Kwon, Suk-Hyun;Kim, Min-Ji
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.399-406
    • /
    • 2012
  • One-third of total energy and 50% of $CO_2$ emissions arise from construction phase. Because of this global amount of energy consumption and $CO_2$ emission, we must do our best to solve this problem. But our existing ways of meeting this problem has focused on the energy consumption saving of the construction and dwelling stage. On the other hand, we has been treated too lightly for handling the $CO_2$ emissions problem during the maintenance management and the demolition process so far,. In this paper, we quantitatively predicted and evaluated the environmental load in each construction step during all life cycle. And, we developed the environmental load assessment program for each construction step. And we proposed the reliable decision support model for objective and reliable environmental load assessment and reduction. This result must help the development of construction technology and low carbon & green growth.

Improvement of Educational Contents to Enhance the Efficiency of Construction Worksite Safety Training

  • Kim, Tae-Hui;Ahn, Sungjin;Lee, Taick-Oun;Kim, Suk Bong;Park, Young Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.1
    • /
    • pp.75-83
    • /
    • 2013
  • The prevention of safety accidents can be achieved through Harvey's 3E's: Engineering, Enforcement, and Education. On construction sites, however, enforcement and engineering did not prove to be valid ways of reducing the number of safety accidents, as enforcement and engineering have failed to overcome and/or supplement the realistic limits regarding the relatively lower education levels of construction workers and the communication issues with foreign workers. On the other hand, safety education can enable the advancement of safety management by enhancing the educational contents and their methods of delivery. To improve the efficiency of safety education via educational contents, this research conducted a qualitative and quantitative analysis on the validity of the newly educational contents by overviewing possible accident types in different work phases. Of the accident types identified by the qualitative analysis, neither highly important nor insignificant accident types were found, yet all the suggested types are found to be required. In addition, this study did not find any significant differences in the occurrence probability of safety accidents related to the level of importance of each type of accident. The qualitative analysis in this research verified that the suggested accident types can be valid, educational material that can take into account future safety accidents.

A Survey for Conversion into Knowledge Based Industry of Construction Industry (건설산업의 지식정보화 기반을 위한 기초적 고찰)

  • Lee Tai Sik;Lee Dong Wook;Bae Keon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.462-467
    • /
    • 2001
  • There are growing interests for knowledge-based information to build up competitiveness both in public and in private. Construction industry compared to other industries, shows strong knowledge usages in products and process. R&D investment over the construction industry has been decreased since economic crisis (IMF), so technology status of domestic construction industry has gap of 4.6 years with developed countries. Information infra also lowers in use of information and investment than other industries. In case of knowledge management, usage of information technology and vision establishment show high status but knowledge sharing and evaluation stay in low level. For the administration of knowledge-based information, there are needs of continuous R&D investments, educations for inspiring employees to knowledge share, systems for knowledge estimation and evaluation, and organizational culture.

  • PDF

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

A Study on the Characteristics of Students and Educational Needs for Construction Education in Cyber University (사이버대학 건설 전공의 입학생 특성과 교육 수요 분석)

  • Bae, Yoonsun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.4
    • /
    • pp.739-746
    • /
    • 2017
  • The need for education that meets the strengths and weaknesses of cyber education is raised because there is difference in the characteristics of students and the needs for education between the cyber university, where the education without constraints of time and space is made, and the existing offline universities. Also, it is expected that the satisfaction of students will be greater if the education is provided based on the analysis of the characteristics of students and their demands for education. There are many students already engaged in construction industry. The students entering the construction engineering department in cyber university are Interested in acquiring the theoretical foundation and professional construction knowledge based on practical experience, professional licenses, and career management. Also, they are interested in further studies at graduate school level and add to academic depth. This study suggests the necessity of establishment of construction education system Including objectives and curriculum in cyber university based on the analysis on the characteristics of students and educational needs.

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

A Field Case Research by Construction Management of Underground Excavation Construction Using Inverse Analysis Method (역해석 기법을 이용한 지하굴착공사의 시공관리에 관한 현장사례연구)

  • Park, Hyun-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1089-1095
    • /
    • 2014
  • In this study, we compared and analyzed the displacement of final excavation with measured value through an inverse analysis method used in urban excavation construction. We maximized the effectiveness of the inverse analysis method, and plan to achieve cost-effective and practical construction management in the field with identical conditions. As the first stage, we suggest an example of a field which has the inverse analysis method. We applied the inverse analysis method to three different fields on which construction and measuring were finished. Of these three fields, two fields showed a very satisfactory result. However, in one field, there were significant differences between the analysis and measured value. The result of our analysis indicated that, we should unite the conditions of the inverse analysis method and field construction. We need to thoughtfully reconsider the RANKINE earth pressure application in a triangle type. This is because the uniformity of earth pressure is made by its arching effect, in the condition of the displacement of lower underground occurring widely, which is differentiated with the earth pressure conditions of RANKINE, even if the slurry wall has stiffness. Also, when recalculating the soil parameter, we should emphasize the adhesion of the weathering zone, and give experimental consideration to ground water level.

Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings (공공아파트 실적데이터 기반의 지역지수 산정 모델 개발)

  • Lim, Dae-Hee;Lee, Seung-Hoon;Seo, Yong-Chil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.75-80
    • /
    • 2010
  • With the intensifying of price competition and structural diversifications, the uncertainty of the domestic housing market has been increased. This highlights the importance of the planning stage of construction projects, and the increased need for a higher level of accuracy in approximate estimates. Currently, a number of research and development programs to calculate construction cost at the initial planning stage are being conducted. However, there are few cases in which local characteristics are considered in deriving the results. If local calibration can be conducted during estimates, more accurate cost estimates will be enabled. This could also play a major role in ensuring the success of a project. Therefore, the purpose of this research is to develop a calculation methodology and a model for a local index based on the historical data of public apartment buildings, and to derive a local index that supports accurate construction cost estimates.