The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.
The success of a construction project hinges on the effective and efficient management of human resources. The stress of human resources is directly related with work performance, and as such, should be managed to improve work performance. This study examined the correlation between job stress and job satisfaction among building construction project managers. A questionnaire to measure work performance was created by referring to the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency, as well as a previous study. The mean job satisfaction score of field managers was 3.6, which suggests that they are generally satisfied in their current job environment. A Pearson's correlation analysis showed that the field managers that were satisfied with their job had less job stress. These results could be used for the effective management of construction site managers and to improve their job performance in the field.
Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures
The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.
최근 국내 건설산업은 성장의 시기를 지나 침체기로 접어들고 있으며 경쟁력 향상을 위해 건설사업관리 특히 공정관리의 중요성이 더욱 부각되고 있다. 이러한 상황에 토목 건설업계는 생존을 위한 다양한 공사관리 방안의 연구 및 현장 적용에 부단한 노력을 하고 있으며 많은 성과를 이루고 있으나 아직도 체계적이며 효율적이고 현장 활용도가 높은 공정관리 기법의 정착은 이루어지지 못하고 있다. 이에 본 연구에서는 공사관리의 핵심인 공정관리의 활용에 대해 설문조사방식으로 현장기술자들의 인식 및 이해의 정도를 파악하며 현장에서 실제 사용하고 있는 공정표의 작성수준과 활용 현황을 파악을 위해 방문 조사하여 현재 국내 공정관리 현주소 및 문제점을 파악하였다. 아울러, 기존문헌 및 연구논문의 고찰, 현장에의 적용성을 바탕으로 현장 활용성이 높은 WBS 분류에서부터 work pacckage 도출과 Activty도출, 공정표 작성 및 관리방안을 제안하였다.
In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.
건설산업의 특성상 엔지니어링 등 소프트웨어 부문은 지식이 곧 기업의 경쟁력을 좌우하기 때문에 철저한 보안 강화로 지식의 소재조차 불분명한 상황이며, 건설현장의 지식은 프로젝트의 종료와 함께 사장되어 가는 현실에 직면해 있다. 이 연구의 목적은 지식경영을 추진하고 있는 기존 업체의 지식관리 학습모델을 고찰하여 이를 근간으로 새로운 모델을 개발하고 건설업체에 적용하는 시나리오를 설정하는 것이다 이를 토대로 사장되어 가는 건설현장 지식을 유통시켜, 건설산업의 전반적인 수준 향상을 도모하고자 한다. 이에 지식관리와 관련한 선행 연구를 분석하여, EIP, EDMS, 지식 및 실패사례관리, CoP, e-Learning으로 구성되는 건설분야의 지식관리 학습모델을 개발하였다.
The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.
현재 건설공사에서 위험관리의 중요성이 점차 부각되고 있음에도 불구하고 건설현장의 위험관리는 매우 미흡한 수준이다. 이러한 원인중 하나가 위험인지 및 분석에 적용하고 있는 각 기법들에 대한 기준이 정립되어 있지 않아, 위험관리의 현장 적용성이 매우 낮은데 있다. 본 연구는 건설현장의 위험관리를 보다 성공적으로 수행하기 위하여 위험관리 전체 프로세스중 위험인지 및 분석단계에 적용하는 기법들을 프로젝트 상황에 따라 최적화시켜 위험관리 기법 적용의 편의성을 향상시키는데 목적이 있다. 그러기 위하여 프로젝트의 상황을 자료의 충분여부, 전문가의 보유여부, 분석시간의 충분여부로 구분하고, 다양하게 제안된 위험인지 및 분석단계의 기법들을 정리한 후 기법별로 그 특징을 파악하여, 위의 세 가지 상황에 적용함으로써 건설공사 위험관리 기법의 프로젝트 상황별 적용기준을 정립하였다.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1383-1387
/
2009
As information technologies in construction field get developed, various studies and projects are in progress for improvement of construction industry. Meanwhile, web-basis online system for building materials is tending upward. However, most of the informations about classification system for building materials and specifications are not systematic yet. Most field staffs have some troubles in making full use of the material information, repeating inefficient works from constructional design to the maintenance of it. This study designed auto-categorization system classified by materials, multi-search engines, auto-converting/creating electronic catalog as well as RFID search support to provide standardized building materials information.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.