• Title/Summary/Keyword: Construction delays

Search Result 183, Processing Time 0.023 seconds

Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology (이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구)

  • Lee, Chan-Kyu;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

A PROACTIVE APPROACH FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

  • Balasubramanian Kanagasabapathi;Kuppusamy Ananthanarayanan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.744-747
    • /
    • 2005
  • The AEC (Architecture/Engineering/Construction) industry is facing a competitive world after it entered into the 21st century. Due to improper planning and scheduling, the construction projects face severe delays in completion. Most of the present day construction organisations operate in multiple project environments where more than one projects are to be managed simultaneously. But the advantages of planning and scheduling as multiple projects have not been utilized by these organisations. Change in multi-project planning and scheduling is inevitable and often frequent, therefore the traditional planning and scheduling approaches are no more feasible in scheduling multiple construction projects. The traditional scheduling tools like CPM and PERT do not offer any help in scheduling in a resource-constrained environment. This necessitated a detailed study to model the environment realistically and to make the allocation of limited resources flexible and efficient. This paper delineates about the proactive model which will help the project managers for scheduling the multiple construction projects.

  • PDF

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

A Study on Estimating Time for PRD (Percussion Rotary Drill) Piling Work (도심지 토공사 PRD (Percussion Rotary Drill) 공법의 천공작업 소요시간 산정 방안에 관한 연구)

  • Kim, Yong-Gyu;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.3-10
    • /
    • 2018
  • In recent years, mechanized construction has become commonplace due to increases in the scale and complexity of construction, and construction machinery is a major factor in successful construction. However, even though the proportion of construction machinery is increasing, analysis of the work capacity of construction machinery is inadequate. In addition, since the standards for all construction machines are currently not defined in quantity-per-unit, the construction period is arbitrarily applied according to the operator at the time of the construction plan. As a result, the construction period of the actual construction is insufficient, and rushed work or construction delays occur. Therefore, in this study, in order to calculate the construction period of the piling work of the pile driver used in the PRD method more accurately than the existing method, the formula for calculating the time required for the piling work of the pile driver was established by collecting piling time data from the daily task reports through the field survey. If the precise construction period of piling work is estimated based on the results of this study, it will be possible to prevent the rushed work and construction delays that occur due to the short construction period.

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

ICT-BIM based Quality Nonconformity Control Method for Construction Project (ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템)

  • Son, Sang-Hyuk;Lee, Hyung-Guk;Bae, Sang-Hee;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

Confirmation of Applicability of Heating and Curing Method of Concrete in Winter Using Electric Heating System (전기열풍기를 이용한 동절기 콘크리트 가열양생공법 적용 및 적정성 효과 검증)

  • Kim, Se-Jong;Park, Jong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.131-132
    • /
    • 2022
  • Looking at recent construction cases at winter construction sites, there is a risk that heat sources such as kerosene fans and fossil fuels (brown coal, molded carbon) used in concrete will cure rapidly, so in situations where further curing is impossible after formwork removal, the outer wall and the entire slab are exposed to rapid external deterioration, resulting in delays in concrete strength expression and until collapse accidents. In this study, we applied kerosene fans and tropical circulating electric heat fans mainly used as curing heat sources at construction sites, comparative analysis. also verified the performance of structures during concrete curing due to thermal convention / circulation performance, concrete demand strength expression, and implementation of electric heat fans by heavy disaster methods.

  • PDF