Korean Journal of Construction Engineering and Management
/
v.8
no.3
/
pp.125-133
/
2007
If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.254-257
/
2003
It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.
Korean Journal of Construction Engineering and Management
/
v.18
no.6
/
pp.65-77
/
2017
Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.728-731
/
2007
In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.305-310
/
2001
The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost
Journal of the Korea Institute of Building Construction
/
v.11
no.1
/
pp.73-81
/
2011
The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.1
/
pp.109-117
/
2023
Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.
Journal of the Korea Institute of Building Construction
/
v.13
no.4
/
pp.372-381
/
2013
In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.
Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.341-343
/
2012
This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.