• Title/Summary/Keyword: Construction delay

Search Result 629, Processing Time 0.035 seconds

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

TRS Network Design and Inspection by Shared Network in Subway (지하철에서의 공용망을 이용한 TRS 망 설계 및 검증에 관한 연구)

  • Kim, hak-yeoul;Kim, Seong-Cheol
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.14 no.3
    • /
    • pp.231-238
    • /
    • 2021
  • In addition to individual calls and group calls, the Trunked Radio System (TRS), which belongs to a group, can make calls simultaneously, and many users can use it within a limited time by adjusting the call time. Also, the LCX infrastructure network of the subway Most of the FM, firefighting radio, TRS of the National Police Agency and the terrestrial DMB service built in 2005 are commonly connected to the network for service and operation. In connection with the analysis, call reception sensitivity, handoff, interference with other signals, time delay, etc. were analyzed, and tests such as reception field strength for each output of the repeater and the success rate of the call terminal were conducted and the test results were analyzed. In addition, it will help TRS cell design and network construction by predicting equipment output capacity and service coverage based on test results.

Design and Analysis of Cell Controller Operation for Heat Process (열공정에 대한 셀 콘트롤러 운영의 설계와 해석)

  • So, Ye In;Jeon, Sang June;Kim, Jeong Ho
    • Journal of Platform Technology
    • /
    • v.8 no.2
    • /
    • pp.22-31
    • /
    • 2020
  • The construction and operation of industrial automation has been actively taking place from manufacturing plan to production for improving operational efficiency of production line and flexibility of equipment. ISO/TC184 is standardizing on operating methods that can share information of programmable device controllers such as PLC and IoT that are geographically distributed in the production line. In this study, the design of the cell controller consists of PLC group and IoT group that perform signals such as temperature sensors, gas sensors, and pressure sensors for thermal processes and corresponding motors or valves. The operation and analysis of the cell controller were performed using SDN(Software Defined Network) and the three types of process services performed in thermal processes are real-time transmission service, loss-sensitive large-capacity transmission service, and normal transmission service. The simulation result showed that the average loss rate improved by about 17% when the traffic increased before and after the application of the SDN route technique, and the delay in the real-time service was as low as 1 ms.

  • PDF

Power Consumption Analysis of Asynchronous RIT mode MAC in Wi-SUN (Wi-SUN에서 비동기 RIT 모드 MAC의 전력소모 분석)

  • Dongwon Kim
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.4
    • /
    • pp.23-28
    • /
    • 2023
  • In a wireless smart utility network communication system, an asynchronous low power MAC is standardized and used according to IEEE 802.15.4e. An asynchronous MAC called RIT (Receiver Initiated Transmission) has a characteristic in which delay time and power consumption are greatly affected by a check-in interval (RIT period). By waking up from sleep every check-in interval and checking whether there is data to be received, power consumption in the receiving end can be drastically reduced, but power consumption in the transmitting end occurs due to an excessive wakeup sequence. If an excessive wake-up sequence is reduced by shortening the check interval, power consumption of the receiving end increases due to too frequent wake-up. In the RIT asynchronous MAC technique, power consumption performance according to traffic load and operation of check-in interval is analyzed and applied to Wi-SUN construction.

A Case Study on the Application of Vibration Level Units in the Construction Phase (시공단계의 진동레벨 단위적용에 관한 사례 연구)

  • Choi, Hyung-Bin;Kim, Dong-Yeon
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.86-97
    • /
    • 2012
  • Ground vibration induced by a bench blasting in the construction site should cause the damage to the structure and indirect damage to a human body, and the vibration level is most practical descriptor for regulating the damage to human body and peak particle velocity is the descriptor for direct damage assesment of the structure. Meantime, the vibration level has not been considered for the blasting design but this study is the case that apply not only peak particle velocity but also vibration level on the blasting design. Also, we strongly believe that this study will be helpful for the management in the blasting site which some civil appeal is concerned. Total 232 measurements of both ppv and vibration level was used to estimate the scale distance. When the regulating threshold was ppv 0.3 cm/s and vibration level 75 decibel, the charge per delay to be estimated with vibration level could be recommended by 1.2~1.4 times than it of ppv. So, it is proven that considering vibration level on the blasting design is reasonable for not only prevention of the civil appeals but also effective blasting. Again, the blasting design which follows the law, "Noise and Vibration Control Act" can actually serve good condition to carry much more economical and effective blasting. The instruments used for this study are the SV-1 model, as first instrument in korea which can measure vibration velocity and vibration level at the same time.

A Study on the Multiple Real Option Model for Evaluating Values based on Real Estate Development Scenario (다중 실물옵션을 활용한 시나리오기반 부동산 개발사업 가치평가 연구)

  • Jang, Mikyoung;Ku, Yohwan;Choi, Hyemi;Kwon, Tae-Hwan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.114-122
    • /
    • 2015
  • Real estate development requires significant amount of capital investment. The project duration has been increased according to its enlarged size. For this reason, cost overrun and time delay are important risk factors that should be managed properly. As a method to hedge the risk, varoius real option methods have been presented. However, conventional project value assesment methods such as NPV(Net Present Value) have weakness to support decision making by reflecting dynamic situations in terms of variation of cost and time. Furthermore, the decision making process is serious of actions rather than discrete event. The purpose of this paper is to present a multiple real option valuation method to overcome the deterministic aspect of real option presented in previous research and practice. The method is developed as following: firstly, to select the model that can be applied in the real estate development project through a survey from previous literature on real options analysis; secondly, to apply data from office development case in order to verify the model by applying conventional real option and multiple real option valuation. According to analysis result, multiple real option provides enhanced values comparing to NPV and single real option.

Location Accuracy Analysis and Accuracy Improvement Method of Pattern Matching Algorithm Using Database Construction Algorithm (패턴매칭 알고리즘의 측위 성능 분석 및 데이터베이스 구축 알고리즘을 이용한 정확도 향상 방법)

  • Ju, Yeong-Hwan;Park, Yong-Wan
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.46 no.4
    • /
    • pp.86-94
    • /
    • 2009
  • Currently, positioning methods for LBS(Location Based Service) are GPS and network-based positioning techniques that use mobile communication networks. In these methods, however, the accuracy of positioning decreases due to the propagation delay caused by the non-line-of-sight(NLOS) effect and the repeater. To address this disadvantage, the CDMA system uses Pattern Matching algorithm. The Pattern Matching algorithm constructs a database of the propagation characteristics of the RF signals measured during the GPS positioning along with the positioned locations, so that the location can be provided by comparing the propagation characteristics of the received signals and the database, upon a user's request. In the area where GPS signals are not received, however, a database cannot be constructed. There are problem that the accuracy of positioning decreases due to the area without a database Because Pattern Matching algorithm depend on database existence. Therefore, this paper proposed a pilot signal strength prediction algorithm to enable construction of databases for areas without databases, so as to improve the performance of the Pattern Matching algorithm. The database was constructed by predicting the pilot signals in the area without a database using the proposed algorithm, and the Pattern Matching algorithm analysed positioning performance.

A Study on the Stress Induced Brittle Failure around Openings with Cross-sectional Shape by Scaled Model Test and DEM Simulation (모형시험과 개별요소법을 이용한 단면 형상에 따른 공동 주변 취성파괴에 관한 연구)

  • Bae, Seong-Ho;Jeon, Seok-Won;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.389-410
    • /
    • 2007
  • For moderately jointed to massive rock masses, the failure and deformation behaviors around an excavated opening are absolutely influenced by the initial rock stress and strength of in-situ rock mass. The localized and progressive brittle failure around an opening does not mean whole collapse of an excavated opening. But, for many cases, it may induce temporary stopping of excavation works and reexamination of the current supporting system, which can result in delay of the entire construction works and additional construction cost. In this paper, the characteristics of the brittle failure around an opening with stress level and tunnel shape was studied by the biaxial compressive test using scaled specimen and by the numerical simulation with $PFC^{2D}$. The biaxial test results were well coincided with the stress induced failure patterns around the excavated openings observed and monitored in the in-situ condition. For the circular part of the opening wall, the stress induced cracks initially occurred at the wall surface in the direction of the minimum principal stress and contributed to the localized notch shaped failure region having a certain range of angle. But for the corner and straight part of the opening wall, the cracks initiated at sharp corners were connected and coalesced each other and with existing micro cracks. Further they resulted in a big notch shaped failure region connecting two sharp corners.

Study on Fatigue Behavior and Rehabilitation of Stringer with Coped Section(I) -Experimental Study on Static and Fatigue Behavior- (절취부를 갖는 세로보의 피로거동과 보수·보강에 관한 연구(I) -정적거동 및 피로거동의 실험적 고찰-)

  • Hwang, Yoon Koog;Chang, Dong Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.3 s.32
    • /
    • pp.363-375
    • /
    • 1997
  • This study encompasses the performance of static and fatigue test for the 8 large scale test specimens to clarify the fatigue behavior of coped stringer and the effect of the repair and strengthening on the damaged stringer of the floor system in steel railway bridges. For the purpose of the research, the actual stress wave for the existing bridge was measured, the basic stress range frequency histogram was made and the equivalent stress range was calculated. Using the result from the equivalent stress range made by adjusting the stress range, the static and fatigue test was carried out by identifying the previous rehabilitation and after. As the result of the static tests, it was revealed that the level of local stress under the S1 specimen test of the real equivalent stress range was similar to tensile strength of the test material, and it was consistent with the requirement of the initiation condition of the fatigue crack. Through the various rehabilitation methods to the damaged specimens, the effects of the repair and reinforcement were analyzed. According to the results of the repair of effect, bolting the high tension bolt over the stop hole was confirmed to be more adequate method than drilling only stop hole to delay the fatigue crack growth. Futhermore, in case of the stringer subjected by bending moment, the reinforcement over the upper flange side was determined to be a useful strengthening method, and the reinforcement to the web of the stringer was not appropriate to accomodate as a adequate strengthening method. Also it was confirmed that the category of the fatigue design for the coped stringer met with the category E specified on the fatigue design criteria of the Highway Standard Specification in Korea.

  • PDF

Development of penetration rate model and optimum operational conditions of shield TBM for electricity transmission tunnels (터널식 전력구를 위한 순굴진율 모델 개발 및 이를 활용한 쉴드TBM 최적운전 조건 제안)

  • Kim, Jeong-Ju;Ryu, Hui-Hwan;Kim, Gyeong-Yeol;Hong, Seong-Yeon;Jeong, Ju-Hwan;Bae, Du-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.623-641
    • /
    • 2020
  • About 5 km length of tunnels were constructed by mechanized tunnelling method using closed type shield TBM. In order to avoid construction delay problems for ensuring timely electricity transmission, it is necessary to increase the prediction accuracy of the excavation process involving machines according to rock mass types. This is important to corroborate the project duration and optimum operation for various considerations involved in the machine. So, full-scale tunnelling tests were performed for developing the advance rate model to be appropriately used for 3.6 m diameter shield TBM. About 100 test cases were established and performed using various operational parameters such as thrust force and rotational speed of cuttterhead in representative uniaxial compressive strengths. Accordingly, relationships between normal force and penetration depth and, between UCS and torque were suggested which consider UCS and thrust force conditions according to weathered, soft, hard rocks. Capacity analysis of cutterhead was performed and optimum operational conditions were also suggested based on the developed model. Based on this study, it can be expected that the project construction duration can be reduced and users can benefit from the provision of earlier service.