Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

Function Development for Apportioning System of Responsible Number of Days by Construction Delay (공기지연에 따른 책임일수 산정 시스템 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hui;Park, Seo-Young;Yun, Seon-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.805-808
    • /
    • 2007
  • Recently there are many contract claims, which are caused by duration delay, in construction industry. Many kinds of research for solving such duration delay problem are being progressed and an effective computerized system needs to improve it. This study suggests an improved methodology and necessary functions to make a time impact analysis system. This results will be useful for quantifying responsible number of days caused by duration delay.

  • PDF

Delay Time Estimation of Recharge in the Hancheon Watershed, Jeju Island (제주도 한천유역의 함양 지체시간 산정)

  • Kim, Nam-Won;Na, Hanna;Chung, Il-Moon
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.605-613
    • /
    • 2014
  • In this work, the delay time for groundwater recharge was estimated by comparing simulated recharges by means of SWAT(Soil and Water Assessment Tool) model and WTF(Water Table Fluctuation) method. The delay time for groundwater recharge means that the time when the water from rainfall travelled through vadose zone just after getting out of soil zone bottom. As measuring this delay time is almost impossible, we used to compare the estimated values from modeling(SWAT) and analytic method(WTF). The test site is Hancheon watershed which has 8 groundwater measurement stations. The results show that the altitude has a linear relationship with the estimated delay time values. To validate these results, we conducted corelation analysis between transformed groundwater levels and observed ones. The results showed that computed groundwater levels have good corelation($R^2$=0.97, 0.87, respectively). The estimated delay time would be used for the groundwater behaviour characteristics in vadose zone. As recharge rates vary according to the height, the delay time is thought to be an import variable for the proper groundwater recharge estimation.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

Dilemma of Saudi Arabian Construction Industry

  • Albogamy, Abdullah;Scott, Darren;Dawood, Nashwan
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.35-40
    • /
    • 2013
  • Currently, the Kingdom of Saudi Arabia (KSA) is the epicentre of building services engineering encapsulating the construction industry. On rise of technological advancements, engineers have the ease to thoroughly investigate engineering aspects. Not only engineers, but other stakeholders, tender related people, financial analysts work in parallel as well. However, there are some factors that are stumbling blocks in the way of progression including delaying factors in the construction industry. The paper provides deep insights of delaying factors regarding public building projects of the KSA. Collection of primary data was carried out by conducting a survey which comprised of 63 chief delay factors. Professionals related to construction industry were asked for ranking the factors in terms of their frequency of occurrence and degree of impact. Seven groups of risk factors are categorized and a correlation analysis is performed by identifying the correlation amongst the variables. Finally, 31 leading delay factors are extracted and reported.

Causes of Delay in Khuzestan Steel Company Construction Projects

  • Saeb, Sajjad;Khayat, Navid;Telvari, Abdulrasoul
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.4
    • /
    • pp.335-344
    • /
    • 2016
  • Construction project is a competitive business with high risk especially in developing countries like Iran which faces with many problems such as delay and time and costs increases. Thus, the first priority here is to determine the causes of prolongation of construction projects and to evaluate their importance. Khuzestan Steel Company (KSC) has made important contribution to the projects in Iran and in turn is required to finish them on time. In this study, an attempt was made to investigate the causes of delay in implementation of construction projects held by this company. Data was collected through questionnaire distributed among the sample including 10 owners, 10 consultants and 15 con-tractors. Accordingly, participants rated the causes in the questionnaire so the most important priorities of each area were specified using TOPSIS method. The results showed that according to the employers, consultants and contractors' viewpoints, the most important reason for delays in construction projects of KSC is related to the financial matters. Hence, according to the results obtained, causes for delays in the company's projects are largely related to the drilling permits and long administrative cycle to renew them. Besides, continuous production of steel in this company is another reason to delays of construction projects.

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

A Study on the Traffic Flow Characteristic Analysis and Applicability of Work Zones (도로 공사중의 교통류 특성분석과 적용성에 관한 연구 -고속도로를 중심으로-)

  • Lim, Chae-Moon;Lee, Ju-Ho;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.4
    • /
    • pp.329-337
    • /
    • 2002
  • It is the actual condition that the increasing traffic delay and accident caused by inefficient management on various construction by occupying the roadways. Since almost roadway improvements are for the public convenient, negative effects by them are ignored. But now due to the increase of traffics demand and limitation of road supply, the positive management scheme and treatment plan on the constructions must be considered. Thus, to the extent of this study divides uninterrupted flow into freeways and the Highway, yielding the time spread between under construction and not, that is delay time, we build capacity and delay model in the change of traffic volume and occupying length.

  • PDF

The study on the Derivation of major delay factors in Outrigger Framework of Tall Building (초고층 아웃리거층 골조공사의 주요 공기지연 요인 도출)

  • Kim, Wan-Soub;Lee, Dongyoon;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.190-191
    • /
    • 2015
  • Construction delays occur frequently in outrigger framework of tall buildings due to the unexpected conditions and lack of experience. However, delay factors of the outrigger framework has not been managed efficiently. Therefore, the systematic management is needed by perceiving possible delay factors before constructing management system. In this study, the major delay factors of outrigger framework are conducted to derive by using the Importance Performance Analysis(IPA). It is expected that the results of this study are utilized for planning of systematic scheduling in outrigger framework of tall building.

  • PDF

Analysis of Delay Causation by Characteristics of Construction Projects (건설사업 특성에 따른 공기연장사유 분석)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.78-86
    • /
    • 2007
  • Top priority to manage construction projects is given to the planning and scheduling in order to keep the project duration, which is one of the most important factors in construction management. However, recently most of public construction projects especially for civil projects are delays and preventive research, many efforts were made concerning construction delays and preventive management methods. But analysis of delay causation, which is a main key to solve the problems is not done, yet. Therefore, in this research causation delays are analyzed by characteristics of construction projects, which are type of projects, type of contracts, project participants, and general condition. As a result of the analysis, delay causation are proved to be different by characteristics of the projects. The research results will be used for prevention of time extension and dispute resolution.