Dilemma of Saudi Arabian Construction Industry

  • Received : 2013.09.06
  • Accepted : 2013.09.24
  • Published : 2013.12.01

Abstract

Currently, the Kingdom of Saudi Arabia (KSA) is the epicentre of building services engineering encapsulating the construction industry. On rise of technological advancements, engineers have the ease to thoroughly investigate engineering aspects. Not only engineers, but other stakeholders, tender related people, financial analysts work in parallel as well. However, there are some factors that are stumbling blocks in the way of progression including delaying factors in the construction industry. The paper provides deep insights of delaying factors regarding public building projects of the KSA. Collection of primary data was carried out by conducting a survey which comprised of 63 chief delay factors. Professionals related to construction industry were asked for ranking the factors in terms of their frequency of occurrence and degree of impact. Seven groups of risk factors are categorized and a correlation analysis is performed by identifying the correlation amongst the variables. Finally, 31 leading delay factors are extracted and reported.

Keywords

References

  1. J.B. Agumba, F.C. Fester, "Identifying Tools and Techniques. for Managing Construction Project Delivery in Small and Medium Enterprises in UK Construction Industry", Journal of Social and Development Sciences, vol. 2, no. 4, pp. 204-213, 2011
  2. A.A. Aibinu, G.O. Jagboro, "The effects of construction delays on project delivery in Nigerian construction industry", International Journal of Project Management, vol. 20, no. 8, pp. 593-599, 2002 https://doi.org/10.1016/S0263-7863(02)00028-5
  3. M. AI-Khalil, M.A. AI-Ghafly, "Delay in public utility projects in Saudi Arabia", International Journal of Project Management, vol. 17, no. 2, pp. 101-106, 1999. https://doi.org/10.1016/S0263-7863(98)00020-9
  4. A. Al-Kharashi, M. Skitmore, "Causes of delays m Saudi Arabian public sector construction projects", Construction Management and Economics, vol. 27, no. 1, pp. 3-23, 2009. https://doi.org/10.1080/01446190802541457
  5. Arab News, "Projects worth SR550bn stalled, contractors ask government to step in", Gulf in the media, 23 December 2011.
  6. S.A. Assaf, M. Khalil, M. AI-Hazmi, "Causes of delay in large building construction projects", Journal of Management and Engineering, vol. 11, no. 2, pp. 45-50, 1995.
  7. S.A. Assaf, S. AI-Hejji, "Causes of delay in large construction projects", International Journal of Project Management, vol. 24, no. 4, pp. 349-357, 2006. https://doi.org/10.1016/j.ijproman.2005.11.010
  8. B.B Bramble, M.T. Callahan, "Construction Delay Claims", 4th ed., Aspen Publishers, 2010.
  9. A.H. Cordsman, "Saudi Arabia enters the 21st century V: economic, demographic and social challenges", Working Paper 2000, Centre for Strategic and International Studies, Washington, DC, USA, 2000.
  10. H. Doloi, "Analysis of pre-qualification criteria in contractor selection and their impacts on project success", Construction Management and Economics, vol. 27, no. 12, pp.1245-1263, 2009. https://doi.org/10.1080/01446190903394541
  11. H. Doloi, A. Sawhney, K.C. Iyer, S. Rentala, "Analysing factors affecting delays in Indian construction projects", International Journal of Project Management, vol. 30, no. 4, pp. 479-489, 2011.
  12. A.S. Faridi, S.M. EI-Sayegh, "Significant factors causing delay in the UAE construction industry", Construction Management Economics, vol. 24, no. 11, pp. 1167-1176, 2006. https://doi.org/10.1080/01446190600827033
  13. A. Field, "Discovering Statistics Using SPSS", London: Sage, 2005
  14. Y. Frimpong, J. Oluwoye, L. Crawford, "Causes of delay and cost overruns in construction of ground water projects in developing countries: Ghana as a case study", International Journal of Project Management, vol. 21, no. 5, pp. 321-326, 2003. https://doi.org/10.1016/S0263-7863(02)00055-8
  15. R.L. Gorsuch, "Factor analysis", 2nd ed., Hillsdale, NJ: Erlbaum, 1983
  16. K.C. Iyer, K.N. Jha, "Factors affecting cost performance: evidence from Indian construction projects", International Journal of Project Management, vol. 23, no. 4, pp. 283-295, 2005. . https://doi.org/10.1016/j.ijproman.2004.10.003
  17. M.A. Kasimu, "Significant factors that cause cost ovenuns in building construction project in Nigeria", Interdisciplinary Journal of Contemporary Research in Business, vol. 3, no. 11, pp. 775-780, 2012.
  18. M.M. Kumaraswamy, D.W.M. Chan, "Contributors to construction delays", Construction Management and Economics, vol. 16, no. 1, pp. 17-29, 1998. https://doi.org/10.1080/014461998372556
  19. A.J. Lewry, L.F.E. Crewdson, "Approaches to testing the durability of materials used in the construction and maintenance of buildings", Construction and Building Materials, vol. 8, no. 4, pp. 211-222, 1994. https://doi.org/10.1016/S0950-0618(09)90004-6
  20. J. Nunally, "Psychometric Theory", 2nd ed., New York: McGraw-Hill, 1978.
  21. K.F. Potts, "Construction Cost Management: Learning from Case Studies", Routledge, 2008.
  22. A. Razek H.A. Bassioni, A.M. Mobarak, "Causes of delay in building construction projects in Egypt", Journal of Construction Engineering and Management, vol. 134, no. 11, pp. 831-841, 2008. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831)
  23. R. Reymont, K.G. Joreskog, "Applied factor analysis in the natural sciences", New York: Cambridge University Press, 1993.
  24. Samba Financial Group "Saudi and GeC Opportunities 2012-16" Department of Economics, 2012.
  25. M. Sambasivan, W.Y. Soon, "Causes and effects of delays in Malaysian construction industry", International Journal of Project Management, vol. 25, no. 5, pp.517 -526, 2006.
  26. J.K. Sharma, "Business Statistics" 2nd ed., Pearson Education India, 2007.
  27. Statistical Year Books, Department of Statistics Ministry of Finance and National Economy, Riyadh, Saudi Arabia, 2000.
  28. G. Sweis A. Abu-Hammad, A. Shboul, "Delays in Construction Projects: The Case of Jordan", International Journal of Project Management, vol. 26, no. 6, pp. 665-674, 2007.
  29. G. Wenbin, "Eigenvector space: the missing concept in exploratory factor analysis", International Academy of Business and Economics, vol. 8, no. 4, pp. 1546-2609, 2008.

Cited by

  1. Using PIPS to Minimize Causes of Delay in Saudi Arabian Construction Projects: University Case Study vol.145, 2016, https://doi.org/10.1016/j.proeng.2016.04.121