Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

CONSTRUCTION DELAY IN INTERNATIONAL PROJECTS: WITH SPECIAL REFERENCE TO GULF AREA CAUSES, DAMAGE ASSESSMENTS AND ENTITLEMENTS

  • Sami Fereig;Nabil Kartam
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.758-763
    • /
    • 2005
  • For international projects in general and the projects in the Gulf area in Particular, the most common cause of construction disputes and claims is construction delay. This paper will present different surveys to identify the causes of delay, the parties responsible, and how delay can be avoided. This paper will outline how these factors impact damage assessment and entitlement. Furthermore, a case study will be presented to show how the responsibility and damages due to delay are assessed and how entitlements are calculated.

  • PDF

Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam

  • Kim, Soo-Yong;Nguyen, Viet Thanh;Luu, Van Truong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.161-165
    • /
    • 2015
  • The delay in construction is the challenge often faced in the course of executing construction projects. To the government projects, the delays become very serious. This problem directly affects the lives, social welfare of the people, and the other negative social impacts. However, the government projects have not been much interest. The questionnaire surveys in Vietnam were conducted to determine the causes of the delay and to find solutions for dealing with the delay. The average index was used to rank the delay factors and the solutions. This study identified the 5 most highly ranked delay factors and the 8 best solutions from a list of 31 delay factors and 19 solutions for the delay. The five most highly ranked delay factors were: information delays and lack of information exchange between the parties; incompetent owner; incompetent supervision consultant; incompetent contractor; and difficulties in financing project by owner. The findings of the study can help the parties involved the government construction projects and practitioners to give appropriate strategies for countering the delay in their projects.

  • PDF

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

  • 조태제;최종수
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.9-17
    • /
    • 2011
  • 건설프로젝트에서 공기지연은 공정 및 공사비 관리 측면에서 핵심 관리사항에 해당된다. 본 연구는 아파트 건설공사에서 직접비의 상당부분을 차지하는 골조공사를 대상으로 공사부위별 공기지연 수준을 분석하고 대책을 제시한 실증연구로 10개 현장의 공사비 비중분석 결과에 기반하여 골조공사에서 지연이 발생하는 부위의 순위, 원인 등을 분석하였다. 분석결과 1층 골조공사에서 가장 큰 지연이 발생하는 것으로 나타났으며 지연원인을 다양한 분류에 의거하여 분석하고 대책을 제시하였다.

A study of the factors affecting delay in apartment projects in Vietnam

  • Luu, Truong-Van;Kim, Soo-Yong
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.718-721
    • /
    • 2007
  • Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구 (A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects)

  • 유준혁;김옥규
    • 한국건축시공학회지
    • /
    • 제21권4호
    • /
    • pp.347-359
    • /
    • 2021
  • 최근 건설공사는 초대형화로 단일 공사규모가 복잡해지고 천문학적인 공사비가 소요되는 프로그램 관리 형태의 성격을 지니는 사업이 등장하고 있다. 특히, 대규모 건설사업과 같이 프로그램 수준에서 관리가 절대적으로 필요한 사업은 계획된 일정 및 비용에 대한 전제적인 관리가 필요하다. 하지만 국내의 경우 구체적인 공사지연에 관한 관리기준이 부재한 현실이다. 이에 본 연구에서는 대규모, 장기간 진행되는 프로그램 수준의 대규모 건설사업을 성공적으로 수행하고 공정지연 및 부진사업을 사전에 방지하기 위한 지연관리지수(Delay Management Index, DMI)를 개발하였다. 이를 통해 대규모 복합건설 프로젝트를 대상으로 사례연구를 수행하였으며, 프로그램 수준 건설사업을 위한 지연예방체계를 구축하였다.

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • 한국건축시공학회지
    • /
    • 제19권5호
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF