Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.
Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.
the reference values are high, because the Korean construction standards quote the foreign construction standars indiscriminately. Therefore ten experts were consulted to draw the items about the machine equipment construction standards for project cost saving in this study.
This study suggested a new model in consideration of long life and constructability of apartment house suggested in the former part. New model suggested the possibility of cost saving based on the idea that people trend to reject because of the recognition that the new model would cost a lot of expense which work as the barrier for the expansion and distribution at the local market so as to prepare the ground for its activation. The Study was aimed at verifying the possibility of cost saving through comparing it with the existing standard apartment house system centered on the skeleton and cladding system among the new structural design models suggested in the former part. Assuming that these existing standard both models should be changed structural design into new model system, the quantity volume, cost and construction period along with the alteration of finished materials between two models were compared altogether. Simultaneously BIM library was built for easy taking-off bill of quantity and consideration of working methodology for construction working cycle, which was translated into construction cost so as to derive the cost of the two subject systems to be counted. Through the analysis, it was concluded that new model would secure variability in the future and constructability along with shortening the construction period (29%) and achieve cost saving (13%) of construction against the those of existing model.
우리나라 건설 산업에서 주택분야가 차지하는 비중은 2007년 32%정도이며 그 중에서도 공동주택은 67%이상을 차지하고 있다. 수 년 전부터 시행되고 있는 분양가 상한제와 최근의 부동산 경기침체를 고려할 때 기업의 경쟁력확보와 저렴한 주택의 공급을 위해서 원가절감의 필요성은 점점 증대되고 있다. 본 연구에서는 공동주택 중에서도 공사비의 비중이 커서 원가절감 기대효과가 높고 품질과 공기에 미치는 영향 또한 가장 큰 철근콘크리트공사 분야에서 발생된 과거의 원가절감 사례를 분류체계에 따라 분류하고, 분류체계별 상관관계를 분석하여 제외(exclusion)와 통합(integration)의 과정을 거쳐 실무적으로 활용될 수 있고 향후 다른 연구의 기초자료가 될 수 있는 공동주택 철근콘크리트공사의 원가절감 체크리스트를 제시하고자 한다.
Journal of Construction Engineering and Project Management
/
제3권3호
/
pp.17-22
/
2013
In many urban cities, super-tall buildings have been being constructed around New York and Chicago as the center since 1930 to improve the efficiency of land use and respond to new residential type. In terms of energy consumption, super-tall buildings are classified as a top energy consumption building. Also, as time passed, the degradation of energy performance occurs in super-tall buildings like general things so that these cannot show the initial performance planned in the design phase. Accordingly, building owners need to make a plan to apply energy saving measures to existing building during the operation phase. In order to select energy saving measures, calculus-based methods and enumerative schemes have been typically used. However, these methods are time-consuming and previous studies which used these methods have problems with not considering the initial construction cost. Consequently, this study proposes a model for selecting an optimal combination of energy saving measures which derives maximum energy saving within allowable cost using genetic algorithms. As a contribution of this research, it would be expected that a model is utilized as one of the decision-making tools during the planning stage for energy saving.
The 5th International Conference on Construction Engineering and Project Management
/
pp.294-299
/
2013
In many urban cities, super-tall buildings have been being constructed around New York and Chicago as the center since 1930 to improve the efficiency of land use and respond to new residential type. In terms of energy consumption, super-tall buildings are classified as a top energy consumption building. Also, as time passed, the degradation of energy performance occurs in super-tall buildings like general things so that these cannot show the initial performance planned in the design phase. Accordingly, building owners need to make a plan to apply energy saving measures to existing building during the operation phase. In order to select energy saving measures, calculus-based methods and enumerative schemes have been typically used. However, these methods are time-consuming and previous studies which used these methods have problems with not considering the initial construction cost. Consequently, this study proposes a model for selecting an optimal combination of energy saving measures which derives maximum energy saving within allowable cost using genetic algorithms. As a contribution of this research, it would be expected that a model is utilized as one of the decision-making tools during the planning stage for energy saving.
Journal of Construction Engineering and Project Management
/
제8권1호
/
pp.1-9
/
2018
US transportation agencies are dealing with shrinking budgets, limited work forces, and deteriorating infrastructure. In order to cope with funding uncertainty, state highway agencies are now looking into their own organizations and identifying programs, practices, and processes that have potential for cost saving. A quality assurance (QA) program is an integral part of highway construction and ensures a project's contracted level of quality. The cost of quality (conforming and nonconforming) can constitute a sizable part of total construction cost. As the quality assurance programs evolved, various practices and processes were developed over time and later adopted by state highway agencies. These practices and processes include different QA standards and specifications, varying testing methods, central testing lab vs. on site testing, performance based vs. prescribed quality assurance practices, implementation of innovative quality assurance practices, etc. Therefore, there is an opportunity to assess different QA strategies and recommend those practices that are effective and cost efficient. A national survey was conducted by the authors, which provided a detailed mapping of various QA practices and processes used as part of QA programs and identified areas where agencies can focus on for cost savings. The survey found that QA sampling and testing plans, optimization of sampling plans, optimization of QA standards and specifications, and implementation of innovative test methods and processes are the main areas the agencies should focus to lean the current QA programs.
본 연구에서는 검증시험결과를 활용한 말뚝기초의 경제적인 설계절차를 제안하였다. 그리고 비경제적인 말뚝기초의 설계관행을 해소하기 위하여 6개 사례를 선정하여 설계를 목적으로 한 말뚝 정재하시험 (즉, 검증시험)을 수행하고, 검증시험 결과를 활용하여 건설비용 절감효과를 분석하였다. 말뚝기초 건설비용 절감효과는, 말뚝의 하중지지능력을 확인할 수 있는 소구경 말뚝에서는 34 - 47 %로 나타났으며, 말뚝의 최대하중지지능력 확인이 곤란한 대구경 말뚝에서는 0 - 55 %로 나타났다.
Global environmental problems are growing, and the importance of buildings with high energy consumption has been emphasized. In Korea, the Ministry of Land, Transport and Maritime Affairs has been promoting the mandatory zero energy building since 2020, and guidelines related to the zero energy building have been developed. In addition, based on the "Energy-saving Design Criteria for Buildings" of the "Green Building Promotion Act" in Korea, the standards for energy-saving design are specified and the energy saving plan is written. Besides, the 'Energy-saving construction standards for eco-friendly houses' also specify insulation, machinery, equipment, and sunshade. Also, there is little consideration about the cost such as construction cost and material cost which should be considered important in the construction stage. Therefore, this study aims at analysis of building type and energy performance versus materials for energy saving building design considering energy performance in planning aspect of initial design stage. In this study, because the variables can not be neglected in this study, it is selected as the lecture facility of the 'K' university campus building which can consider the remaining factors except the passive design element as the control variable, Energy performance analysis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.