• 제목/요약/키워드: Construction boom

검색결과 77건 처리시간 0.025초

OPPORTUNITIES AND CHALLENGES OF THEUAE CONSTRUCTION INDUSTRY

  • S. Sreenath
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.299-310
    • /
    • 2007
  • When it comes to construction, the UAE leads the way. The UAE's construction industry is valued at US$ 221 billion (about AED 811.73 billion) - the highest in the region. The construction boom has caused a shortage of both manpower and materials, leading to rise in input prices not only in UAE but in the entire region. The prices of materials have reportedly increased more than manpower. Consequently, there has been an escalation in project costs, which have increased by 10-20 per cent since last three years. This paper examines the opportunities and challenges faced by the developers, consultants, contractors and suppliers due to the construction boom at UAE for the last five years. The paper summarizes that inspite of challenges faced, UAE expects the construction and real estate sectors to remain upbeat for the next ten years.

  • PDF

일반 투자가에 의한 발전소 건설 Cycle과 DSM (The Construction Cycle by Investors and DSM in the Electricity Wholesale Market)

  • 안남성;김현실
    • 한국시스템다이내믹스연구
    • /
    • 제3권1호
    • /
    • pp.43-60
    • /
    • 2002
  • This paper describes the forecast of wholesale price in competitive Korean electricity market using the system dynamics approach. The system dynamics concepts have been implemented with the Ithink software. This software facilitates the development of stock and flow model with information feedback. Using this model, the future wholesale electricity price can be computed hour by hour, quarterly, and yearly. This model also gives the energy planner the opportunity to create different scenarios for the future of deregulated wholesale markets in Korea. Also It will lead to increased understanding of competitive wholesale market as a complex, dynamic system. Research results show that the plant construction appeared in waves of boom and bust in Korean electricity market like real estate construction. That is, the Korea wholesale market's new power plants and the market price will appear the Boom and Bust cycle. It is very similar behavior as real estate industry. In case of consideration of DSM program, The DSM savings lead to a somewhat different timing of the booms in construction and of price spikes. But the DSM programs do not eliminated the fundamental dynamics of the boom and bust. And the wholesale price is maintained at the lower level compared to the case of without DSM program. However, the unexpected result is found that due to the lower market price, Investor make significantly less investment in new CCs, which leads to the higher wholesale price after 2010. It suggests that the DSM Policy must be implemented with the dynamics of competitive Electricity Market.

  • PDF

굴절식 크레인의 스핀들과 랙 기어 응력 해석 모델 개발 (Development of Analytical Model of Spindle and Rack Gear Systems for Knuckle Boom Crane)

  • 안준욱;이광희;유승규;조재상;이철희
    • 드라이브 ㆍ 컨트롤
    • /
    • 제14권2호
    • /
    • pp.23-29
    • /
    • 2017
  • In this study, a flexible multi-body dynamic simulation model of a knuckle boom crane is developed to evaluate the stress of spindle and rack gears under dynamic working conditions. It is difficult to predict potential critical damage to a knuckle boom crane if only the static condition is considered during the development process. To solve this issue, a severe working scenario (high speed with heavy load) was simulated as a boundary condition for testing the integrity of the dynamic simulation model. The crane gear model is defined as a flexible body so contact analysis was performed. The functional motion of a knuckle boom crane is generated by applying forces at each end of the rack gear, which was converted from hydraulic pressure measured for the experiment. The bending and contact stress of gears are theoretically calculated to validate the simulation model. In the simulation, the maximum stress of spindle and rack gears are observed when the crane abruptly stops. Peak impact force is produced at the contact interface between pinion and rack gears due to the inertia force of the boom. However, the maximum stress (bending/contact) of spindle and rack are under the yield stress, which is safe from damage. By using the developed simulation model, the experiment process is expected to be minimized.

편중 가능한 사장교 가설용 데릭 크레인을 이용한 합성형 복합 사장교 시공 단계 해석 (Construction Stage Analysis of Hybrid Composite Cable-Stayed Girder Bridge Using Eccentrically Loaded Derrick Crane)

  • 박태균;김문겸;원종화
    • 대한토목학회논문집
    • /
    • 제30권3A호
    • /
    • pp.277-286
    • /
    • 2010
  • 케이블을 이용하여 장경간을 필요로 하는 교량의 시공은 일반적으로 불완전 한 구조계인 교량의 선단에 데릭 혹은 무한궤도 크레인을 설치하여 수상 및 육상으로 이송되는 교량 상판을 리프팅하여 시공하게 된다. 이와 같은 경우 일차적으로 과도한 크레인의 자중으로 인하여 불완전한 구조계에 결함을 발생시킬 수 있으며, 또한 하부 수송으로 인한 추가 비용 및 공기를 소요하게 된다. 본 연구에서는 이러한 기존 시공방법을 개선하고자 개발된 교량 일 측에 편중 가능하고, 가동 붐을 설치하여 후방 이송 자재를 시공 지점으로 운반, 가설이 가능한 데릭 크레인의 시공 단계를 정의하여 수치해석을 수행하였다. 데릭 크레인의 하중 재하 점을 고정부 4점으로 단순화하였으며, 가동 붐의 수직/수평 회전 범위를 고려하여 반력을 산정하였다. 또한 크레인의 '휴지' 및 '작업 중'의 단계로 나누어 가동 붐 및 강형, PC Slab에 의하여 발생하는 휨 모멘트를 시공단계에 반영하였다. 본 연구에 고려된 데릭 크레인은 접속교를 통한 육상 작업으로 시공 기간 및 비용을 줄일 수 있으며, 크레인 자체의 작은 중량으로 시공 중 재하 하중 감소를 꾀할 수 있다.

펌프카의 붐대 결함에 의한 사고원인과 방지대책 (Causes of accidents and preventive measures due to defects in pump car booms)

  • 조춘환
    • 한국건설안전학회 논문집
    • /
    • 제6권1호
    • /
    • pp.7-11
    • /
    • 2024
  • 펌프카는 콘크리트를 타설하는 장소에 필요한 만큼 운반하는 장비로, 짧은 시간에 많은 양의 콘크리트 타설하기 위해서는 펌프카를 사용하는 것이 경제성 및 품질관리 측면에 가장 효율적이다. 그러나 최근에는 콘크리트 타설중에 붐 파손으로 인한 인명피해가 많이 발생하고 있으므로 본 연구에서는 장비 제작단계, 노후장비에 대한 검사기준, 장비대여제도 등의 개선이 필요함을 제언한다. 그 이유는 펌프카의 유한요소해석 결과, 붐 2단에서 작용하는 상당응력과 붐상단에서 최대응력이 895.39MPa로 나타났고, M.S. 0.04로 가장 낮게 평가되었으므로 보강의 필요성을 인식했다. 그리고 2단계 붐은 1~5단계 붐대 중 가장 스트레스가 많고, 취약한 부분임을 확인했다. 따라서 설계 및 제작 단계에서 부재의 두께와 강성을 높이고, 현재 사용되는 장비의 강판에 대한 보강이 필요하다. 또한, 일반 건설기계 전체에 대한 비파괴 검사를 의무적으로 반영하고, 비파괴검사 및 정기검사시 붐대 결함 누락에 대한 책임을 검사기관에 부담시키는 제도 구축이 시급하다.

The Investor's Behavior in Competitive Korean Electricity Market

  • Ahn, Nam-Sung;Kim, Hyun-Shil
    • 한국시스템다이내믹스연구
    • /
    • 제6권2호
    • /
    • pp.25-35
    • /
    • 2005
  • This paper describes the mechanism for new investment to appear in waves of boom and bust causing alternative periods of over and under supply of electricity in Korean market. A system dynamics model was developed to describe the dynamic behavior of new investment in Korean market. The simulation results show the boom and bust cycle in the new investments. When the market price is high, investors decide to build new power plants. However, it takes some delay time to complete new power plants. When the new power plants are being added into the grid, the supply increases and the wholesale price begins to decrease. This causes the cancellation of new power plant or delay the construction. This mechanism causes the boom and bust cycle in new investment.

  • PDF

크롤러 크레인에서 붐의 처짐을 고려한 러핑와이어 장력과 전도모멘트 사이의 관계식 보정 (Compensation of Relation Formula between Luffing Wire Tension and Overturning Moment in a Crawler Crane Considering the Deflection of Boom)

  • 장효필;한동섭
    • 한국기계가공학회지
    • /
    • 제10권4호
    • /
    • pp.44-49
    • /
    • 2011
  • The crawler crane, which consists of a lattice boom, a driving system, and movable vehicle, is widely used in a construction site. It needs to be installed an overload limiter to prevent the overturning accident and the fracture of structure. This research is undertaken to provide the relation formula for designing the overload limiter as follows: First the relation formulas between the wire-rope tension and the hoisting load or the overturning ratio according to the luffing angle and length of a lattice boom are established. Secondly the derived formulas are corrected by using the compensated angle considering the deflection of boom through the finite element analysis. The stiffness analysis is carried out for 30-kinds of models as a combination of 6-kinds of luffing angle and 5-kinds of length of boom. Finally the shape design of a stick type load cell, which is the device to measure the wire-rope tension, is performed. 5-kinds of notch radius and 5-kinds of center hole radius are adopted as the design parameter for the strength analysis of the load cell.

크롤러 크레인의 붐 길이 선회각도에 의한 롤러 하중 해석 (Analysis of Roller Load by Boom Length and Rotation Angle of a Crawler Crane)

  • 이득기;강정호;김태현;오철규;김종민;김종명
    • 한국기계가공학회지
    • /
    • 제20권3호
    • /
    • pp.83-91
    • /
    • 2021
  • A crawler crane, which consists of a lattice boom, a driving system, and a movable vehicle, is widely used on construction sites. The crawler crane often traverses rough terrain at these sites; as a result, an overload limiter needs to be installed on the crane to prevent it from overturning and breaking. In this paper, we studied the distributed load change in relation to boom length and the angle of rotation of the roller that comes in direct contact with the grounded track shoe. First, we developed a 3D model of a crawler crane and meshed it for finite elements. Then, we performed finite element analysis to derive the load on the roller. Finally, we graphed and examined the roller distributed load data of the case according to boom length and rotation angle. By detecting the load on the roller of the crawler crane, we can predict the potential for the crane to overturn before it happens.

중량물 설치 시 이동식 크레인 기종선정에 관한 연구 (HA Study on the Selection of Mobile Crane Model for Heavy Equipments Installation)

  • 정재복;유호선
    • 플랜트 저널
    • /
    • 제8권2호
    • /
    • pp.59-69
    • /
    • 2012
  • This study focuses on avoiding the failures from the wrong selections by experiences as simulation programs is not available, and suggests the methods which effectively select the alternatives when the selected model is not appropriate for the original plan. First, CC8800-1K of DEMAG has the longest boom whose length is 216 m at the maximum. The combination of the boom is feasible to second level except for MANITIWOC M 2250 (M-1200 RINGER) which is possible to third level. Second, the angle of boom is from 20 degrees to 82 degrees. Suitable angle to work is in the 55-78 degrees. The working load of crawler type and hydraulic one to be applied is 75-85% in the critical loads capacity. As increasing operating radius, crawler type is a favorable position over hydraulic one. Lastly, related problems were verified through examination by suggestions for the design of the selection methods for the case analysis. The major problems are stemming from the selection based on its experiences, unreasonable demand for the existing facility and repeated selections by the designer who accumulates his experiences via same or similar projects.

  • PDF

THE MECHANICAL DESIGN AND CONSTRUCTION OF A TRUCK MOUNTED SCATTEROMETER SYSTEM

  • Aziz, H.;Mahmood, N.N.;Ali, A.;Ibrahim, N.;Ahmad, Z.;Mahmood, K.A.;Jamil, H.;Brevern, P.V.;Koo, V.C.;Sing, L.K.
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.1009-1011
    • /
    • 2003
  • The procurement of mobile microwave scatterometer involve the consideration to ensure vehicle and equipment selection full-filled technical requirement and safety standard in Malaysia. Designing, and modification works involve engineering methodology in determining and selecting a suitable hydraulic telescopic boom that suit a selected vehicle available from the market. The vehicle is also a delivery system for microwave remote sensing equipment and other accessories to any locations in Malaysia. Total loading to be carried by the vehicle is about 4500 kg and its overall weight must be 16,000 kg as recommended by hydraulic telescopic boom manufacturers. The telescopic boom will elevate microwave scatterometer system and antenna to a maximum height of 27 m, and can also be rotated through 360$^{\circ}$. A mechanism is incorporated in the system to enable tracking or monitoring angular movement of the hydraulic telescopic boom when positioned towards required target.

  • PDF