• 제목/요약/키워드: Construction Temporary Work

검색결과 130건 처리시간 0.027초

현장 실측을 통한 장대터널 공사중 환기 문제점 연구 (A Study on the Improvement of Temporary Ventilation of long tunnel Using the Field Measurement data)

  • 홍창수;황대진;강현욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1350-1357
    • /
    • 2010
  • In tunnelling, temporary ventilation is very important factor in the safety of worker and the work efficiency which is affected by visibility. There are a lot of problems in the recent tunnel construction, because the longer the tunnel, the more the present design doesn't satisfy the allowable standard about dust and air pollution. Especially, In case the length of tunnel is more than 1,000m, the ventilation efficiency tends to decrease. In this study, the field measurement of the degree of contamination was performed near the face of tunnel. Based on the results obtained, the main factors of problem in temporary ventilation are the difference of temperature between outside and inside, the rate of leakage of ventilation duct and the dust and so on. It maybe helpful to the solution of problems, and also the accurate ventilation estimate.

  • PDF

해체${\cdot}$신축용 가설울타리의 통합방안 (Integration of Temporary Fences for Demolition and Construction)

  • 신동성;전재만;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.258-261
    • /
    • 2003
  • 해체공사는 신축공사보다 위험하며 환경위해요인을 많이 야기시킨다. 그러나 해체공사현장에서 사용되는 가설울타리는 환경위해요인의 차단, 안정성과 작업공간확보의 역할을 하지 못한다. 단지 외부의 시선을 차단한 뿐이다. 이 연구는 가설울타리가 해체공사 초기에 설치될 수 있다는 가능성에서 시작하였다. 연구의 초기단계로 실제 가설울타리가 사용되는 실태를 파악하였으며 그 결과 가설울타리가 해체공사 이전에 설치할 수 있음을 알게 되었다. 이에 우리는 해체공사와 신축공사용 가설울타리의 통합을 실제화하는 데 주력하였다. 연구에 결과는 다음과 같다. .첫째, 통합에 제한요소를 파악해야 한다. 둘째, 건축공사 표준시방서의 보완이 필요하다. 셋째, 가설울타리의 훼손 및 변경에 대비해야한다. 마지막으로 가설울타리의 통한을 통해 환경위해요인 저감, 공사비 절감, 작업환경 개선, 해체공사의 이미지 제고를 기대할 수 있다.

  • PDF

선로이송 가설공법을 적용한 철도판형교 유도상화(III) (Steel Plate Girder Railway Bridge Ballast System using Rail Transfer Method(III))

  • 민지홍;장준현;우용근;김진용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1569-1576
    • /
    • 2011
  • To install heavy structures in the railway bridges, crane methods or launching methods using temporary structure have been applied. These methods are uneconomical because working yard is required, temporary cut of rail system, etc. In this study, various construction methods has been developed which are suitable to the filed conditions. In the case of simple span structure like plate girder bridges, the girder is loaded to troy system at the working yard and then transferred to the working place. To lift and lower the girder system, a new transfer system was developed. Different methods each for simple span bridge girder and long span girder were developed and detailed work procedures were proposed. Using these methods, the heavy structures can be installed with simple and safe work procedures and the construction cost and duration can be reduced.

  • PDF

층고절감형 거더를 이용한 영구 스트러트 공법 (Strut as a Permanent System using Composite Beams)

  • 홍원기;박선치;김진민;이호찬
    • KIEAE Journal
    • /
    • 제8권1호
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

건설공사의 중대재해 원인분석에 관한 연구 (A Study on the Analysis of Causes for Fatal Accident in Construction Works)

  • 박종근
    • 한국안전학회지
    • /
    • 제12권4호
    • /
    • pp.122-133
    • /
    • 1997
  • Various types of fatal accidents are increasing in Korean construction work site. Simply repeated and conventional accidents as well as new types of potential hazards which are caused by large-scaled work, complexity and negligence of temporary structures in construction are increasing, so that analysis of fundamental causes are necessary to control the construction accidents. In this study 739 fatal accidents are informally classified by the types of work and work process. The classified items which are based on ANSI Z 16.2, are modified adapted to the construction fields and are given code numbers and are analyzed by the data-base program. The exact causes of various types of accidents are analyzed by the accident types, agencies and hazardous conditions and through the Cross-tabulation method in order to find out the cause between relevant accidents.

  • PDF

가설공사 비계의 정적구조 해석에 관한 연구 (A Methodology of the Static Analysis for Scaffolding Structure)

  • 손기상
    • 한국안전학회지
    • /
    • 제8권2호
    • /
    • pp.16-22
    • /
    • 1993
  • Accidents, especially fatal accidents in construction work are being not reduced, but increased, despite of more concerns of related authority and companies themselves. It is investigated that major reasons of which these accident increase are caused to set up wrong temporary structures : scaffolding with insufficient components or safety guards. Approximately 50% of falling accident, one of three major accidents; falling collapsing of structures or soil, accidents from heavy equipments, are due to defects of temporary structures. Therefore, technical standards for these temporary structures made by the ministry of labour in 1984, should be promptly revised because of its insufficient considerations for structural concepts. A method to effectively ensure the construction safety are shown through an experimental method, mathematical analysis structural planning against overturning and collapsing of scaffold-ing components, consideration of safety factor in loading, formulations of safety structure against falling or dropping from schaffolding.

  • PDF

Optimization Algorithms for Site Facility Layout Problems Using Self-Organizing Maps

  • Park, U-Yeol;An, Sung-Hoon
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.664-673
    • /
    • 2012
  • Determining the layout of temporary facilities that support construction activities at a site is an important planning activity, as layout can significantly affect cost, quality of work, safety, and other aspects of the project. The construction site layout problem involves difficult combinatorial optimization. Recently, various artificial intelligence(AI)-based algorithms have been applied to solving many complex optimization problems, including neural networks(NN), genetic algorithms(GA), and swarm intelligence(SI) which relates to the collective behavior of social systems such as honey bees and birds. This study proposes a site facility layout optimization algorithm based on self-organizing maps(SOM). Computational experiments are carried out to justify the efficiency of the proposed method and compare it with particle swarm optimization(PSO). The results show that the proposed algorithm can be efficiently employed to solve the problem of site layout.

건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구 (A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site)

  • 정진우;김용곤
    • 한국안전학회지
    • /
    • 제34권5호
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.

깊은 굴착에서 파쇄대를 갖는 연암 및 경암 지층의 지반 거동분석 사례연구 (Case Study of Ground Behavior Analysis of Soft and Hard Rock Layers with Fractured Zones in Deep Excavation)

  • 김성욱;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.521-532
    • /
    • 2008
  • Supporting system design and construction management for the soft and hard rock layers with fractured zones are very important theme for the safety of temporary retaining wall, surrounding ground and structures in the urban deep excavation for the construction of subway, railway, building etc. The prevailing design method of supporting system for the soft and hard rock layers in the deep excavation is mostly carrying out by simplification without proper consideration for the characteristic of rock discontinuities. Therefore the behaviors of rock discontinuities and fractured zones dominate the whole safety of excavation work in the real construction stage, serious disaster due to the failure of temporary retaining wall can be induced in the case of developing large deformations in the ground and large axial forces in the supporting system. This paper introduces examples of deep excavation where the soft and hard rock layers with fractured zones were designed to be supported by shotcrete and rock bolt, deformations of corresponding ground and supporting systems in the construction period and increments of axial force in the upper earth anchors and strut due to the these deformations were investigated through detailed analysis of measurement data, the results were so used for the management of consecutive construction that led to the safe and economical completion of excavation work. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구 (A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction)

  • 조기연;박미연;김성훈;서종원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF