• 제목/요약/키워드: Construction Supply Chain Management

검색결과 110건 처리시간 0.031초

Performance Modeling of an EPC Information Service System

  • Kim, So-Jung;Kang, Yong-Shin;Son, Kyung-Won;Lee, Yong-Han;Rhee, Jong-Tae;Hong, Sung-Jo
    • Industrial Engineering and Management Systems
    • /
    • 제9권3호
    • /
    • pp.285-293
    • /
    • 2010
  • To obtain visible and traceable information from the supply chain, HW/SW standards for the EPC global network, which process electronic product code (EPC) data read from Radio frequency identification (RFID) tags, are regarded as the de facto industry standard. Supply chain participants install information service systems and provide logistics information to partners by following the EPCglobal architecture framework. Although quality of service (QoS) is essential for providing dependable and scalable services as pointed out by Auto-ID Lab, only a few models for the performance analysis of QoS-related work have been developed in the context of EPC information service systems. Specifically, doing so allows alternative design choices to be tested in an easy and cost-effective manner and can highlight potential performance problems in designs long before any construction costs are incurred. Thus, in this study we construct a model of an EPC information service system for the purposes of performance analysis and designing a dependable system. We also develop a set of building blocks for analytical performance models. To illustrate how the model works, we determine the characteristics of an EPC information service system and then select a combination of these proven modeling concepts. We construct a performance model that considers the response time and shows how to derive meaningful performance values. Finally, we compare the analytical results to measurements of the EPC information service system.

국내 건설기업의 ESG 평가 및 대응방안 (ESG Evaluation and Response of Construction Companies in Korea)

  • 박환표
    • 한국건축시공학회지
    • /
    • 제23권6호
    • /
    • pp.785-796
    • /
    • 2023
  • 국내 건설기업의 ESG 경영은 대형업체 중심으로 추진되고 있다. 건설업체는 ESG 경영보고서를 발간하고, 중대성 평가를 통하여 이슈를 도출하고, 관련 전문가 의견수렴 과정을 통하여 10대 이슈와 우선순위를 도출하여 ESG 경영관리를 하고 있다. 또한 국내외 ESG 평가기관의 건설업체 ESG 평가결과, 동일한 업체에 대한 평가결과가 상이한 것은 각 기관별 평가항목과 평가절차 등의 평가모델이 다르기 때문이다. 따라서 본 연구는 건설ESG 경영을 강화하기 위한 대응방안을 제안하였다. 첫째, 중소건설업체도 건설ESG 경영을 추진할 수 있도록 정책적인 지원과 자금지원이 필요하다. 둘째, 건설산업의 특성에 맞는 건설 ESG 평가항목을 표준화하여 공개함으로써 건설업체가 ESG 경영 및 추진하는 것이 필요하다. 셋째, 하청업체의 ESG 평가도 표준화하여 발표함으로써, 하청업체들이 ESG 경영 및 평가를 준비하는데 활용하는 것이 필요하다. 넷째, EU 발주처인 사업의 경우 아프리카, 동아시아지역의 해외건설 사업은 ESG 기준에 맞게 사업을 추진하도록 요청받고 있다. 따라서 장기적으로 해외사업은 지역별, 국가별 ESG 규제사항 및 영향 등에 관한 자료를 구축하여 해외건설 진출기업에게 정보를 제공하는 방안을 제안하였다.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제13권1호
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

맞춤형 공공서비스제공을 위한 플랫폼 전자정부 구축방안에 대한 탐색적 연구: 행정프로세스와 행정정보시스템 개선측면에서 (An Exploratory Study on Construction of Electronic Government as Platform with Customized Public Services : to Improve Administrative Aspects of Administrative Processes and Information Systems)

  • 이상윤;정명주
    • 디지털융복합연구
    • /
    • 제14권1호
    • /
    • pp.1-11
    • /
    • 2016
  • 현재 우리 정부는 플랫폼 전자정부 도입을 서두르고 빅데이터와 클라우드 컴퓨팅 기술과 시스템을 모색하여 궁극적으로는 공공기관 각각의 이종 대민서비스를 단일창구에서 맞춤형으로 제공하고자 한다. 따라서 이 연구에서는 창구의 프런트오피스 민원인의 다양한 서비스 제공요청에 대응해서 백오피스에서 단일한 방식으로 맞춤형 공공서비스를 제공하기 위해서는 먼저 백오피스 차원에서 공공데이터가 연동되어야하므로 각 행정기관이나 부처의 공공데이터를 기반으로 백오피스에서 통합차원에서 민원인에 대해서 단일한 서비스를 제공할 수 있는 별도의 응용프로그램으로서 앱과 데이터 단위에서 공유를 효율적으로 수행하는 이종서비스 상호 간의 정보시스템 통합이 가능한 새로운 메타데이터정보시스템을 제안하였다. 제안된 시스템이 구현되면, 민원인의 프런트오피스 차원의 생활공간에 존재하는 서비스 수요사슬과 백오피스 차원의 공무원의 사무공간에서 이루어지는 서비스 공급사슬의 일원화를 통한 단일 창구에서의 연동이 유기적으로 되면서, 민원인에 대한 맞춤형 공공서비스 달성을 한발 앞당길 수 있다.

중소기업에서 내부 환경요인을 통한 Smart Factory 핵심요인이 경영성과에 미치는 영향 연구 (A Study on the Influence of Smart Factory Key Factors on Management Performance through Internal Environmental Factors in Small and Medium Businesses)

  • 진성옥;서영욱
    • 디지털융복합연구
    • /
    • 제17권7호
    • /
    • pp.115-124
    • /
    • 2019
  • 본 연구는 '중소기업에서 내부 환경요인을 통한 Smart Factory의 핵심요인이 경영성과에 미치는 영향'에 대한 실증연구이다. 연구 목적은 Smart Factory 구축이 경영성과에 영향을 미쳐서 회사가 지속 발전하는데 기여하는지 검증하고, 국가적으로 추진하고 있는 Smart Factory 구축 확대 정책에 대해 제언하고자 한다. 절차는 Smart Factory를 구축한 중소제조기업의 실무자를 중심으로 설문을 받아 SPSS와 SMART PLS로 통계 분석하였다. 연구결과는 첫째, 기업 내부의 환경요인은 Smart Factory 핵심요인에 긍정적인 영향을 미쳤다. 둘째, Smart Factory 핵심요인은 경영성과에 긍정적인 영향을 미쳤다. 위의 입증을 통해서 기업의 환경요인을 고려한 Smart Factory의 핵심요인은 경영성과에 영향을 주는 것으로 나타나, Smart Factory 구축 성과의 이론적인 토대를 마련했다고 할 수 있다. 향후는 Smart Factory 구축방법 연구를 하고자 한다.

친환경 산업단지의 물류네트워크 설계 - 부산 국제산업물류도시를 중심으로- (Logistics Network Design of Eco-Friendly industrial estate -Focused on GILC in Busan-)

  • 김웅섭;신재영
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2012년도 춘계학술대회
    • /
    • pp.273-274
    • /
    • 2012
  • 지속적인 유가 상승과 탄소배출 규제 강화는 기업들로 하여금 높은 경쟁력을 가지도록 요구한다. 따라서 고객 서비스 증대와 비용절감을 위해 효율적인 물류시스템을 구축하고 운영하는 것에 많은 노력을 기울이고 있으며 비용 경쟁력을 가지는 친환경 산업단지의 필요성이 증대되고 있는 실정이다. 부산시에서는 친환경정책을 통해 경쟁우위를 점하고 부족한 산업단지를 충족시키기 위해 서부산권에 '부산신항배후 국제산업물류도시'를 선정하고 개발을 진행하고 있다. 이러한 물류도시를 구축하기 위해서는 적절한 정책과 화물수송 공동화를 통한 물류시스템이 필요하다. 특히, 산업 단지내 물류시스템의 체계구축을 통한 효율적인 운영은 물류도시의 저비용 친환경적인 측면에서 매우 중요하다. 따라서 본 연구에서는 물류체계를 분석하고 분석내용을 바탕으로 물류도시의 물류네트워크 운영모델을 제시함으로서 물류도시의 기반구축 자료를 제시하는데 목적이 있다.

  • PDF

국제산업물류단지 물류네트워크 설계 (International industrial logistics complex logistics network design)

  • 신재영;김웅섭
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2014년도 춘계학술대회
    • /
    • pp.221-222
    • /
    • 2014
  • 지속적인 유가 상승과 탄소배출 규제 강화는 기업들로 하여금 높은 경쟁력을 가지도록 요구한다. 따라서 고객 서비스 증대와 비용절감을 위해 효율적인 물류시스템을 구축하고 운영하는 것에 많은 노력을 기울이고 있으며 비용 경쟁력을 가지는 친환경 산업단지의 필요성이 증대되고 있는 실정이다. 부산시에서는 친환경정책을 통해 경쟁우위를 점하고 부족한 산업단지를 충족시키기 위해 서부산권에 '부산신항배후 국제산업물류도시'를 선정하고 개발을 진행하고 있다. 이러한 산업단지를 구축하기 위해서는 적절한 정책과 화물수송 공동화를 통한 물류시스템이 필요하다. 특히, 산업 단지내 물류시스템의 체계구축을 통한 효율적인 운영은 저비용 친환경적인 측면에서 매우 중요하다. 따라서 본 연구에서는 물류체계를 분석하고 분석내용을 바탕으로 물류네트워크 운영모델을 제시함으로서 산업단지의 기반을 마련하는데 목적이 있다.

  • PDF

산업단지내 효율적 컨테이너 운송을 위한 수송 모형 (Container Transportation Models in Industrial Estate Area)

  • 신재영;김웅섭
    • 한국항해항만학회지
    • /
    • 제38권2호
    • /
    • pp.171-176
    • /
    • 2014
  • 지속적인 유가 상승과 탄소배출 규제 강화는 기업들로 하여금 높은 경쟁력을 가지도록 요구한다. 따라서 고객 서비스 증대와 비용절감을 위해 효율적인 물류시스템을 구축하고 운영하는 것에 많은 노력을 기울이고 있으며 비용 경쟁력을 가지는 친환경 산업단지의 필요성이 증대되고 있는 실정이다. 부산시에서는 친환경정책을 통해 경쟁우위를 점하고 부족한 산업단지를 충족시키기 위해 서부산권에 '부산신항배후 국제산업물류도시'를 선정하고 개발을 진행하고 있다. 이러한 산업단지를 구축하기 위해서는 적절한 정책과 화물수송 공동화를 통한 물류시스템이 필요하다. 특히, 산업 단지내 물류시스템의 체계구축을 통한 효율적인 운영은 저비용 친환경적인 측면에서 매우 중요하다. 따라서 본 연구에서는 물류체계를 분석하고 분석내용을 바탕으로 물류네트워크 운영모델을 제시함으로서 산업단지의 기반을 마련하는데 목적이 있다.

병목공정 자원할당 방식에 따른 강교 제작공장 생산성 차이 분석 (Analysis of Productivity Differences in Steel Bridge Manufacturing Plants According to Resource Allocation Methods for the Bottleneck)

  • 이재일;정은지;정근채
    • 한국건설관리학회논문집
    • /
    • 제24권2호
    • /
    • pp.37-49
    • /
    • 2023
  • 본 연구에서는 제조업 분야에서 보편적으로 활용되어 온 제약이론을 바탕으로 강교 제작공장의 생산성을 향상시키기 위한 자원할당 방법론을 제안한다. 이를 위해 도장 공정을 병목공정으로 정의한 후, 공정 전용 자원할당(OSRA), 제품 전용 자원할당(PSRA), 범용 자원할당(GRA) 등 3가지의 자원할당 방법론을 개발하였다. 강교 공급사슬 시뮬레이션 모델을 활용한 성능평가 실험 결과, GRA 방법론이 재공재고수(NWIP)와 대기시간(WT) 측면에서 가장 우수한 성능을 보였다. 특히, 강교 제작공장의 부하와 부하 변동성이 증가할수록 다른 두 전용 자원할당 방식과의 성능 격차는 더욱 커졌다. 평균적으로 GRA는 NWIP과 WT를 OSRA 대비 36.2%, 34.6%, PSRA 대비 71.0%, 70.4% 감소시켰다. 재공재고수와 대기시간의 감소는 병목현상의 완화를 의미하며, 이는 결국 강교 제작공장의 생산성이 향상되었음을 의미한다.