• 제목/요약/키워드: Construction Supervisor

검색결과 87건 처리시간 0.023초

PLANT 건설공사의 문제점과 대책에 관한 고찰 (온산동련소 건설의 토건공사및 철골공사 사례를 중심으로) (A study on the problem and Counter measure of plant Construction project. -Based on tile work of both civil engineering and steel structure in the plant construction project of On-San Refinery-)

  • 유광수
    • 기술사
    • /
    • 제16권1호
    • /
    • pp.13-19
    • /
    • 1983
  • As one of staff members participated in the full course of the plant construction project of On-san Refinery to its successful completion. I had my past expierence that the plant construction project was so complicated, and a Long period required, and thus there were so money problems to be solved. Among the problem, I mainly noticed that the following listed points were solved and improved. 1. Each drawing should be in every accuracy possible. 2. Contract should be specified in every detail possible. 3. All invoiced prices of breack down list should be coped with the current market prices. 4. All execution of work should be in the most accuracy. A. Planing execution of work. B. Coordination with supervisor group. C. Economical method for execution of work. D. Safety control. 3, Calculation work field should be established seperately 6. Each staff members should be work at the best of his pride.

  • PDF

건설업의 KOSHA 18001 적용사례 연구 - 현장활동 수준분야 중심으로 - (A Study on the Application Instance of KOSHA 18001 to Construction Firms)

  • 박경태;손기상
    • 한국안전학회지
    • /
    • 제19권4호
    • /
    • pp.86-93
    • /
    • 2004
  • Through this study we have reviewed the implementation model, certificate criteria and the formation of KOSHA 18001 Safety and Health Management System and have compared and examined with OHSAS 18001 Certificate. In the course of the 1st questionnaires which have been participated by the concerned Safety and Health Staffs(such as Project Mannager, Site Supervisior, Safety Engineers) of the local construction sites, actual condition of application for KOSHA 18001 has been scrutinized and examined. And as a result, we presented the improved model by digging out the problems. The improved model has been applied for about eight months in local construction sites and the effectiveness has been carefully compared and examined before and after the application of the improvement model through the 2nd questionnaires by the relevant staffs (such as Project Manager, Site Supervisor, Safety Engineer and Project Engineers of the Coordinated Sub-Contractors).

모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안 (Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System)

  • 이종호;엄신조
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF

A CONSTRUCTION METHOD OF MULTIPLE CONTROL SYSTEMS USING PARTIAL KNOWLEDGE UPON SYSTEM DYNAMICS

  • Yoshisara, Ikuo;Indaba, Masaaki;Aoyama, Tomoo;Yasunaga, Moritoshi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1999년도 제14차 학술회의논문집
    • /
    • pp.73-78
    • /
    • 1999
  • This paper presents an effective construction method of adaptive multiple control systems utilizing some knowledge upon the plants. The adaptive multiple control system operates plants un-der widely changing environmental conditions. The adaptive multiple control system is composed of a family of candidate controllers together with a supervisor. The system does not require any identification schemes of environmental conditions. Monitoring outputs of the plant, the supervisor switches from one candidate controller to another, The basic ideas of adaptation are as follows: (1)each candidate controller is prepared for each environmental condition in advance; (2)the supervise. applies a sequence of speculative controls to the plant with candidate controllers just after the start of control or just after the detection of a change in the environmental condition. Each candidate controller can keep the system stable during one-step period of the speculative control and the most appropriate candidate controller for the environmental condition to which the system is exposed can be selected before the last trial of speculative control step comes to an end. We proposed a construction method of adaptive multiple control system without any knowledge of plant dynamics and applied the method to a cart-pole balancing problem and a vehicle anti skid braking system. In real applications, as we can often easily obtain a piece of knowledge upon plant dynamics beforehand, we intend to extend the method such that multiple control systems can be efficiently designed using the knowledge. We apply the new idea to the cart-pole balancing problem with variable length of the pole. The simulation experiments lead us to the conclusion that the new attempt can reduce the manpower to design the candidate controllers for adaptive multiple control systems.

  • PDF

아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례 (Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan)

  • 정동호;김우선;김기백;정원준;이승우
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

정조.순조연간 관영공사에서 별간역(別看役) 정우태(丁遇泰)의 조영활동 (Special Technician Jeong Woo-tae's Activity and Role in the Governmental Construction Works during the Reign of King Jeong-jo and King Sun-jo of the Joseon Dynasty)

  • 김동욱
    • 건축역사연구
    • /
    • 제16권3호
    • /
    • pp.115-131
    • /
    • 2007
  • Jeong Woo-tae(?-1809) was a military official who had worked as Byeol-Gan-Yeok in the governmental construction works during the late 18th century through the early 19th century. Byel-Gan-Yeok, literally a special technician, was an official post in the governmental construction works that carries specific technical tasks from the mid 18th century. Over 30 years, Jeong Woo-tae had devoted himself in the construction of various royal tombs, city walls, and palace buildings. He showed superb and various techniques in the works of stone carving and architectural details. After finishing the construction of the tomb of King Jeong-jo's father successfully, he was appointed as a governor of a rural town. Being on duty of the governor, he used to participate in the construction works as a technician. He also made a couple of innovative devices in the field of construction, like a carrying apparatus, Byel-Nok-No. His works secured the setting up of the post of Byel-Gan-Yeok in the governmental construction system in the 19th century. But his technical achievement remained as his own private works rather than developing to the universal growth of the craftsmen's skill. This might be a limitation of the Byel-gan-Yeok's role, whose position was remained in the midway between official and craftsman.

  • PDF

건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로- (Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction -)

  • 복훈;김형태;강경식
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

효과적인 건설재해예방을 위한 현장소장 육성방안 (The Cultivation Scheme of Supervisor's Leadership for Preventing Accidents in Construction Projects)

  • 김태환;홍성호;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.480-485
    • /
    • 2004
  • 본 연구는 건설현장 최종 의사결정자인 현장소장의 재해예방에 효과적인 리더쉽 유형과 이의 육성방안을 제안하기 위해 수행되었다. 이를 위해 첫째, 문헌연구를 통해 리더쉽의 유형과 특징에 대하여 고찰하고, 가설을 선정하였다. 둘째, 설문조사를 통해 현장소장의 리더쉽 유형, 현장 안전관리활동 수준, 교육프로그램의 실태를 파악하였다. 셋째, 가설을 검정 하여 재해예방에 효과적인 현장소장의 리더쉽 유형과 육성방안을 제안하였다. 재해예방에 효과적인 현장소장 리더쉽의 유 형은 높은 직무 중심형 $\cdot$ 인간 중심형 리더쉽이며, 이는 건설회사의 적극적인 교육 및 인센티브 프로그램을 통해 양성될 수 있음을 알 수 있었다.

  • PDF

전기설계.감리제도의 합리적인 운영방안에 관한 고찰 (Domestic current situation and Improvement plan Consideration of Electricity Design & Supervision System)

  • 정연해;남기범;신화영;정형용;이종혁;전영수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.10-15
    • /
    • 2007
  • For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.

  • PDF

주거건축과 관련된 건축위법행위 행정심판판례 연구 (A Study of the Administrative Tribunal Cases about Violation of Law of Housing Projects)

  • 김진욱;성기용
    • 한국주거학회논문집
    • /
    • 제14권6호
    • /
    • pp.33-40
    • /
    • 2003
  • The purpose of this study was to analyze the architect's Administrative Tribunal cases related to housing projects. We collected the 271 decisions of Administrative Tribunal cases from 1985 to 2001 through the Ministry of Legislation data base. As a conclusion of research, most of cases are caused during design process and supervision of construction which are major roles of architects. We can find out that the number of cases of Administrative Tribunal about housing is 10% more than other types of building. And this situation is more serious in supervision building phase. It proves that housing project has more possibility of violation of law than other types. Because it belong to an economic problems. In Korea, clients of housing project tend to take more profits by taking an illegal acts; like enlargement of a building, construction border violation. illegal construction balcony and so on. And architect who roles to be a supervisor is liable to these problems but he has not much authority and economical benefits. Through this research we can analyze this situation and make know what is problem.