• Title/Summary/Keyword: Construction Site Information

Search Result 829, Processing Time 0.028 seconds

A Decade's Experiences on the Hydrofracturing In-Situ Stress Measurement for Tunnel Construction in Korea (암반터널 설계를 위한 수압파쇄 초기지압 측정의 10여년 간의 경험)

  • Choe, Seong-Ung;Park, Chan;Sin, Jung-Ho;Sin, Hui-Sun
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.03a
    • /
    • pp.79-88
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, so it was not easy to handle. It had been modified to a wire-line system at their second generation. It was more compact one but it also needed an additional air-compressor. Our current system is much more compact and operated by all-in-one system, so it doesn't need an additional air-compressor. With a progress in a hardware system, the software for analyzing the in-situ stress regime has also been progressed. For example, the shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

A Study on the Evaluation of Shear Strength of Geotextile & Geomembrane by Traffic Load in Landfill Final Cover System (폐기물 매립지 최종복토층에서 교통하중에 의한 부직포 및 Geomembrane의 전단강도의 변화에 대한 사례연구)

  • Park, Sang-Hyun;Lee, Jai-Young;Choi, Mun-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.1 no.1
    • /
    • pp.3-11
    • /
    • 2002
  • The Geotextiles have been used for the protection of Geomembrane and the prevention of clogging phenomenon; however, the material can be easily damaged by construction equipments. It generally recommended to use at least $500g/m^2$ of Geotextile in Korea landfill, but few researcher were performed about the damage of Geotextile. Therefore, we intended to evaluate the potential damage of Geotextile by the traffic load simulating the final cover system in a field scale. Tensile strength and strain were appraised to understand the degree of damaged Geotextile. The tests were conducted under the condition of cross direction of Geotextile. Four different weight of Geotextile was used for the evaluation $500g/m^2$, $700g/m^2$, $1,000g/m^2$ and $1,500g/m^2$. The initial strain of $500g/m^2$ of Geotextile showed 50% that did not meet the standard 60%. The strain of $700g/m^2$ of Geotextile was below the standard after the traffic load test; however, the others met the requirement in the test. In conclusion, the weight of Geotextile used in landfill to protect the Geomembrane should be at least $700g/m^2$ in a view of strain requirement. We expect this study provides fundamental information for the construction of Geotextile in landfill.

  • PDF

Problem Analysis and Suggestion for Improved Approaches to Ecological Planting and the Establishment of Urban Parks -A Case Study of the Nature Ecological Forest in Yeouido Park, Seoul- (도시공원 생태적 배식의 조성 단계별 문제점 고찰 및 개선방안 -서울시 여의도공원 자연생태의 숲을 사례로-)

  • Seong, Kyong-Ho;Lee, Kyong-Jae;Choi, Jin-Woo;Kim, Jong-Yup
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.2
    • /
    • pp.91-102
    • /
    • 2011
  • This study was carried out to analyze the problems on several steps of the establishment of the Nature Ecological Forest in Yeouido Park, Seoul, and also to suggest improved approaches on each step. For execution drawing, planting models and plans seemed to be uncertain, and the quantity and size of planting trees seemed to be impractical. For construction, the woody plants planted on the site were different in species and size from the planting plan. Ecological planting was somewhat limited because of the inappropriate soil properties. For management, replacement of the dead trees was not executed properly, and no management scheme was prepared after the replacement period. We suggested improved approaches for the establishment of ecological forests in urban areas as follows: for execution drawing, overstory, understory and herbaceous ground cover layers should be composed based on standard plant community structures. Trees that are available from tree markets should be specified in the planting plan. For construction, trees for planting need to be tagged to identify species and size. When tree species and size are changed, they should be checked to ensure that they are proper to the plant community model. Soil information should be collected to check that they fit the target plant community model. For management, the proper amount of trees needs to be specified in the planting plan by applying regular discount rates, especially for trees supplied from the government sector. The replacement period should be extended from two years to five years. The change of plant communities should be monitored during first five years after establishment.

Analysis of Forest Environmental Factors on Torrent Erosion control work area in Gyeongsangnam-do - Focus on Erosion Control Dam and Stream Conservation - (경남지역 야계사방사업지의 산림환경특성 분석 - 사방댐 및 계류보전사업을 중심으로 -)

  • Kang, Min-Jeng;Kim, Ki-Dae;Oh, Kang-San;Park, Jin-Won;Park, Jae-Hyeon
    • Journal of agriculture & life science
    • /
    • v.50 no.5
    • /
    • pp.111-120
    • /
    • 2016
  • The objective of this study was to provide basic information for selecting the right timing and the right place of erosion control of stream on Gyeongsangnam-do. In order to achieve this objective, a total of 526 erosion control dams and 230 mountains stream conservation facilities on the constructed places and construction planned places for the erosion control were investigated on site, forest physiognomy, and hydrologic conditions. The erosion control dams and mountain stream conservation facilities were mostly constructed in the area, which has the sedimentary rock, 200-400m of altitude, a slope of 21~30°, and II of landslide hazard map. Among the forest environmental factors, it was only similar to the construction frequency in the areas that have small diameter class, III age class. Also, we investigated the hydrological environmental factors that determine the size and numbers of erosion control dam. The places constructed to the highest frequency were below 50ha in the area, 2.1~4.0km/㎢ of drainage density, longitudinal water system, 61~90mm of maximum precipitation per hour, and 201~300mm of day maximum precipitation. As the results, the sites and floodgate conditions between the constructed places and stream conservation facilities for the erosion control showed to be very similar. Therefore, these results indicate that the erosion control of the stream of the areas, which have the disruption of mountain peaks and the high erosion risk areas, should be used on both the erosion control dam and stream conservation facilities.

Perception Survey Study on High-level Radioactive Waste: Targeting Local Residents in Gijang-gun, Busan (고준위방사성폐기물에 대한 인식 조사 연구: 부산 기장군 지역 주민을 대상으로)

  • Yeon-Hee Kang;Sung Hee Yang;Yong In Cho;Jung-Hoon Kim
    • Journal of the Korean Society of Radiology
    • /
    • v.17 no.6
    • /
    • pp.947-955
    • /
    • 2023
  • This study was conducted to investigate the awareness of spent nuclear fuel among residents in nuclear power plant areas and use it as basic data for establishing a disposal facility for high-level radioactive waste. 204 questionnaires collected online were analyzed using SPSS Window Ver 28.0. To verify differences between groups, t-test and one-way ANOVA were performed. And correlation analysis was conducted to confirm the relationship between variables. As a result, first, risk perception regarding nuclear-related accidents showed statistically significant differences depending on gender and educational level. The position on the construction of a permanent disposal facility for spent nuclear fuel showed a statistically significant difference depending on gender, education, and age, and the perception of the importance of each evaluation standard for establishing a spent nuclear fuel management plan showed a statistically significant difference depending on education and age. In terms of trust in information-providing institutions, trust in the National Assembly was found to be the lowest. Second, the results of the correlation analysis between variables showed that local residents are aware that an alternative to the current disposal of spent nuclear fuel is needed, and that financial support for the construction of a permanent disposal facility is needed. Therefore, in order to build a high-level radioactive waste disposal site, it is believed that it is necessary to increase trust in the government, collect opinions from local residents, and provide economic support.

Verticality 3D Monitoring System for the Large Circular Steel Pipe (대형 원형강관 수직도 모니터링을 위한 3D 모니터링 시스템)

  • Koo, Sungmin;Park, Haeyoung;Oh, Myounghak;Baek, Seungjae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.870-877
    • /
    • 2020
  • A suction bucket foundation, especially useful at depths of more than 20m, is a method of construction. The method first places an empty upturned bucket at the target site. Then, the bucket is installed by sucking water or air into it to create negative pressure. For stability, it is crucial to secure the verticality of the bucket. However, inclination by the bucket may occur due to sea-bottom conditions. In general, a repeated intrusion-pulling method is used for securing verticality. However, it takes a long time to complete the job. In this paper, we propose a real-time suction bucket verticality monitoring system. Specifically, the system consists of a sensor unit that collects raw verticality data, a controller that processes the data and wirelessly transmits the information, and a display unit that shows verticality information of a circular steel pipe. The system is implemented using an inclination sensor and an embedded controller. Experimental results show that the proposed system can efficiently measure roll/pitch information with a 0.028% margin of error. Furthermore, we show that the system properly operates in a suction bucket-based model experiment.

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

Structural Characteristics of Expression Module of Unidentified Genes from Metagenome (메타게놈 유래 미규명 유전자의 발현에 관련된 특성분석)

  • Park, Seung-Hye;Jeong, Young-Su;Kim, Won-Ho;Kim, Geun-Joong;Hur, Byung-Ki
    • KSBB Journal
    • /
    • v.21 no.2
    • /
    • pp.144-150
    • /
    • 2006
  • The exploitation of metagenome, the access to the natural extant of enormous potential resources, is the way for elucidating the functions of organism in environmental communities, for genomic analyses of uncultured microorganism, and also for the recovery of entirely novel natural products from microbial communities. The major breakthrough in metagenomics is opened by the construction of libraries with total DNAs directly isolated from environmental samples and screening of these libraries by activity and sequence-based approaches. Screening with activity-based approach is presumed as a plausible route for finding new catabolic genes under designed conditions without any prior sequence information. The main limitation of these approaches, however, is the very low positive hits in a single round of screening because transcription, translation and appropriate folding are not always possible in E. coli, a typical surrogate host. Thus, to obtain information about these obstacles, we studied the genetic organization of individual URF's(unidentified open reading frame from metagenome sequenced and deposited in GenBank), especially on the expression factors such as codon usage, promoter region and ribosome binding site(rbs), based on DNA sequence analyses using bioinformatics tools. And then we also investigated the above-mentioned properties for 4100 ORFs(Open Reading Frames) of E. coli K-12 generally used as a host cell for the screening of noble genes from metagenome. Finally, we analyzed the differences between the properties of URFs of metagenome and ORFs of E. coli. Information derived from these comparative metagenomic analyses can provide some specific features or environmental blueprint available to screen a novel biocatalyst efficiently.

Development of Video-Detection Integration Algorithm on Vehicle Tracking (트래킹 기반 영상검지 통합 알고리즘 개발)

  • Oh, Jutaek;Min, Junyoung;Hu, Byungdo;Hwang, Bohee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.635-644
    • /
    • 2009
  • Image processing technique in the outdoor environment is very sensitive, and it tends to lose a lot of accuracy when it rapidly changes by outdoor environment. Therefore, in order to calculate accurate traffic information using the traffic monitoring system, we must resolve removing shadow in transition time, Distortion by the vehicle headlights at night, noise of rain, snow, and fog, and occlusion. In the research, we developed a system to calibrate the amount of traffic, speed, and time occupancy by using image processing technique in a variety of outdoor environments change. This system were tested under outdoor environments at the Gonjiam test site, which is managed by Korea Institute of Construction Technology (www.kict.re.kr) for testing performance. We evaluated the performance of traffic information, volume counts, speed, and occupancy time, with 4 lanes (2 lanes are upstream and the rests are downstream) from the 16th to 18th December, 2008. The evaluation method performed as based on the standard data is a radar detection compared to calculated data using image processing technique. The System evaluation results showed that the amount of traffic, speed, and time occupancy in period (day, night, sunrise, sunset) are approximately 92-97% accuracy when these data compared to the standard data.

A Study on Spatial Changes around Jangseogak(Former Yi Royal-Family Museum) in Changgyeonggung during the Japanese colonial period (일제강점기 창경궁 장서각(구 이왕가박물관) 주변의 공간 변화에 관한 연구)

  • Yee, Sun
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.39 no.4
    • /
    • pp.10-23
    • /
    • 2021
  • During the Japanese colonial period, the palaces of Joseon were damaged in many parts. Changgyeonggung Palace is the most demolished palace with the establishment of a zoo, botanical garden, and museum. During the Japanese colonial period, the palaces of Joseon were damaged in many parts. This study examined the construction process of Jangseogak(Yi Royal-Family Museum), located right next to the Jagyeongjeon site, which was considered the most important space in the Changgyeonggung residential area of royal family zone, through historical materials and field research. Built in 1911, Jangseogak is located at a location overlooking the entire Changgyeonggung Palace and overlooking the Gyeongseong Shrine of Namsan in the distance. Changes in the surrounding space during the construction of Jangseogak can be summarized as follows. First, in the early 1910s, the topography of the garden behind Jagyeongjeon and part of the Janggo were damaged to create the site of Jangseogak. The front yard was built in the front of Jangseogak, and a stone pillar was installed, and a staircase was installed to the south. In the process, the original stone system at the rear of Yanghwadang was destroyed, and it is presumed that Jeong Iljae and other buildings were demolished. Second, in the 1920s, many pavilions were demolished and the zoo and botanical gardens and museums were completed through leveling. After the Jangseogak was completed, the circulation of the Naejeon and surrounding areas was also changed. Cherry trees and peonies were planted in the flower garden around the front yard of Jangseogak and the stairs, and a Japanese-style garden was created between Yanghwadang and Jibbokheon. Third, in the 1930s, the circulation around Jangseogak was completed in its present form, and the museum, Jangseogak, Zoological and Botanical Gardens, and Changgyeonggung, which became a cherry tree garden, were transformed into a Japanese-style cultural park. After that, the surrounding space did not change much until it was demolished. The restoration of the present palace is a long-term, national project of the Cultural Heritage Administration. The results of this study will provide important data for the restoration plan of Changgyeonggung Palace in the future, and it is expected that it will provide additional information to related researchers in the future.