IT Model to Calculate Required Equipments for Excavation Work in Construction Projects

  • Mahajan, Darshan A.;Rajput, Babalu L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.1-4
    • /
    • 2013
  • Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.

Preliminary Study on the utilization of BIM in modular building construction (모듈러 건축공사의 BIM 활용성 분석을 위한 기초연구)

  • Lee, Myung-Do;Lee, Chan-Woo;Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Ung-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.236-237
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that address several issues faced by the construction industry. However, the application guidelines for BIM in current modular construction projects are insufficient. This paper presents the preliminary work on the analysis of BIM utilization in a modular construction project; a five-point likert scale questionnaire was conducted to assess the necessity of BIM applications by the Necessity Index(NI) of nine categories(U1~U9) across two construction phases (onsite and offsite). The survey results indicate that applications for BIM based quantity takeoff for offsite phase(U4) as well as BIM modeling for module joint details(U8) were deemed to be the most necessary in each phase. The results of this study can be used as detailed guidelines for the integration of BIM in modular construction projects.

  • PDF

A Study on the Promotion of Safety Management at Construction Sites Using AIoT and Mobile Technology (AIoT와 Mobile기술을 활용한 건설현장 안전관리 활성화 방안에 관한 연구)

  • Ahn, Hyeongdo
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.154-162
    • /
    • 2022
  • Purpose: The government intends to come up with measures to revitalize safety management at construction sites to shift safety management at construction sites from human capabilities to system-oriented management systems using advanced technologies AIoT and Mobile technologies. Method: The construction site safety management monitoring system using AIoT and Mobile technology conducted an experiment on the effectiveness of the construction site by applying three algorithms: virtual fence, fire monitoring, and recognition of not wearing a safety helmet. Result: The number of workers in the experiment was 215 and 7.61 virtual fence intrusion was 3.5% compared to the number of subjects and 0.16 fire detection were 0.07% compared to the subjects, and the average monthly rate of not wearing a safety helmet was 8.79, 4.05% compared to the subjects. Conclusion: It was found that the construction site safety management monitoring system using AIoT and Mobile technology has a valid effect on the construction site.

The preparation of dendritic molecule having the binding site for a new generation of PDD or PDT

  • Choi, Chang-Shik
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.291-293
    • /
    • 2022
  • The preparation of dendritic molecule for photodynamic diagnosis (PDD) or photodynamic therapy (PDT) has been interested on design and synthesis of macromolecule toward a new generation. Herein, the binding site of polyether group is an important role on the construction of macromolecule toward a new generation. Therefore, we will be presented on the preparation of dendritic molecule having the binding site.

  • PDF

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • Journal of People, Plants, and Environment
    • /
    • v.23 no.3
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

A Study on the Realization of Dust Damage Compensation Calculation for the Prevention of Dust Damage in Construction Site (공사장 먼지피해 예방을 위한 먼지피해 배상액 산정 현실화 방안 연구)

  • Kim, Jinho
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.374-385
    • /
    • 2022
  • Purpose: Even if a damage is applied to the dust of the construction site containing the first-class carcinogen, it is dismissed or 5~30% of the amount of noise damage compensation is paid., Because of such loopholes, some construction companies are neglecting the dust management of the construction site, and the damage of the workers and the residents in the construction site continues. Method: The purpose of this study is to examine the problems of the calculation criteria of damage compensation amount of construction site dust, the measurement of dust concentration, the analysis of measurement data (the data of electric signboard measuring device by the mining scattering method), the prediction and evaluation methods such as modeling, and to suggest improvement measures. Result: It is found that it is impossible to calculate the amount of damages from dust damage in the construction site by calculating the current dust damage compensation amount and dust concentration modeling and measurement. Conclusion: It will receive an application for compensation for damage within the site where damage is expected (about 100m in the straight line and the boundary line of the site), and present a method of calculating the amount of compensation that differentially evaluates dust damage to the degree of dust management and compliance with dust-related legal standards.

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance (서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안)

  • Park, Shin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.