• 제목/요약/키워드: Construction Sequence

검색결과 588건 처리시간 0.024초

초고층 건물의 시공 중 안정성 검토를 위한 시공단계해석 (Construction Sequence Analysis for Checking Stability in High-Rise Building under Construction)

  • 김재요
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.618-623
    • /
    • 2008
  • Due to recent trends of the atypical plan shapes and the zoning construction in high-rise buildings, the building stability under construction is arising as an important issue for design and construction plan. To ensure the stability under construction, the differential column shortening and the lateral movements with unbalanced distributions of self-weight of structure members and the load flows before completion of member connections and lateral load resisting system should be checked by construction sequence analysis. This paper presents the scheme of zone-based construction sequence analysis, to check the stability of high-rise building under construction. This scheme is applied to the construction sequence analysis for real high-rise building under construction.

  • PDF

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • 제15권3호
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

Gray 사상을 이용한 이진 낮은 상관구역 수열군의 생성법 (Construction Method of Binary Low Correlation Zone Sequence Set Using Gray Mapping)

  • 장지웅;김영식;임대운
    • 한국통신학회논문지
    • /
    • 제34권2C호
    • /
    • pp.169-174
    • /
    • 2009
  • 본 논문에서는 이진 낮은 상관 구역 수열군의 새로운 생성법을 제안한다. 새로운 수열군은 Kim과 Jang, No, Chung이 제안한 4진 낮은 상관 구역 수열군에 Gray 사상을 적용하여 생성한다. 새로 생성된 이진 수열군의 주기는 생성에 사용한 4진 수열군의 주기의 2배이며, 낮은 상관구역 내 상관 값의 최대 크기 및 수열군의 크기는 생성에 사용한 수열군의 그것의 2배가 된다. 그러나 낮은 상관 구역의 크기는 그대로 유지된다. 생성에 사용한 4진 낮은 상관 구역 수열군의 최적인 경우 새로 생성된 이진 수열군은 높은 확률로 최적의 수열군이 된다.

역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

초고층 거푸집 공사 공기 단축을 위한 테이블폼 해체 순서 최적화 모델 (Optimization Model of Table Form dismantlement Sequence for Reducing Formwork Duration in Tall Building Construction)

  • 남철우;권재범;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2015
  • In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.

  • PDF

이진 낮은 상관 구역 수열군을 이용한 새로운 4진 낮은 상관 수열군의 생성법 (A New Construction of Quaternary LCZ Sequence Set Using Binary LCZ Sequence Set)

  • 장지웅;김상효;임대운
    • 한국통신학회논문지
    • /
    • 제34권1C호
    • /
    • pp.9-14
    • /
    • 2009
  • 본 논문에서는 매개 변수가 (N,M,L,1)인 특정 성질을 가진 이진 낮은 상관 구역 수열균(LCZ sequence)를 이용하여 매개 변수가 (2N,2M,L,2)인 4진 낮은 상관 수열군을 생성하는 방법을 제시한다. 본 논문에서 이용하는 이진 낮은 상관 수열군은 balance property를 가지고 있어야 하며, 주기 N이 $N{\equiv}3$ mod 4이어야 하고, 특정한 상관 특성을 가져야 한다. 새로 제안된 생성법은 특정 성질을 가진 이진 낮은 상관 수열군을 이용하여 이진 낮은 상관 수열군을 생성한 Kim, Jang, No, and Chung의 생성법을 응용한 것이다.

New Construction of Quaternary Low Correlation Zone Sequence Sets from Binary Low Correlation Zone Sequence Sets

  • Jang, Ji-Woong;Kim, Sang-Hyo;No, Jong-Seon
    • Journal of Communications and Networks
    • /
    • 제12권4호
    • /
    • pp.330-333
    • /
    • 2010
  • In this paper, using binary (N, M, L, $\epsilon$) low correlation zone (LCZ) sequence sets, we construct new quaternary LCZ sequence sets with parameters (2N, 2M, L, $2{\epsilon}$). Binary LCZ sequences for the construction should have period $N\;{\equiv}\;3$ mod 4, L|N, and the balance property. The proposed method corresponds to a quaternary extension of the extended construction of binary LCZ sequence sets proposed by Kim, Jang, No, and Chung [1].

4진 낮은 상관 구역 수열군의 새로운 생성법 (A New Construction Method of Quaternary LCZ Sequence Set)

  • 장지웅;김영식;임대운
    • 한국통신학회논문지
    • /
    • 제34권2C호
    • /
    • pp.153-157
    • /
    • 2009
  • 본 논문에서는 짝수 N에 대하여 매개 변수가 (N,M,L,$\varepsilon$)인 이진 낮은 상관 구역 수열군(LCZ sequence)를 이용하여 동일한 매개 변수를 갖는 4진 낮은 상관 구역 수열군을 생성하는 방법을 제시한다. 새로 제안된 생성법은 이진 낮은 상관 구역 수열과 위상을 변화시킨 수열에 Krone와 Sarwate의 논문에 나온 역 gray 사상을 적용하였다. 본 논문에서 제시하는 생성법은 주기 N이 짝수인 모든 이진 낮은 상관 구역 수열군에 적용하는 것이 가능하다.

시공과정에 따른 보강토 옹벽의 거동 특성 (Behavior of Mechanically Stabilized Earth Retaining Walls with Different Construction Sequence)

  • 유충식;이광문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.473-480
    • /
    • 1999
  • This paper presents the results of a parametric study on the behavior of mechanically stabilized earth retaining wall. It has been recognized that the currently available design guidelines, which is base on the limit equilibrium approach, cannot properly account the interaction effect between the components, construction sequence, and foundation settlement which may impose a significant influence on the wall behavior. A parametric study using finite element analysis was performed to investigate the behavior of MSE wall under different construction conditions and the applicability of the current design approach. In the parametric analysis, the effects of the construction sequence, the surcharge, and the foundation stiffness were studied and a detailed finite element modeling for various components of the system were employed. The results, such as wall displacement and earth pressure distributions, reinforcement forces, vertical stress distribution were then thoroughly analyzed to investigate the effect of construction details on the wall behavior.

  • PDF