• 제목/요약/키워드: Construction Risk

검색결과 1,901건 처리시간 0.03초

군 건설공사 안전관리를 위한 위험성 평가 시스템 개선 방안 (Examining the Improvement of the Risk Assessment System for the Safety Management of Military Construction Projects)

  • 정현섭;방홍순;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.335-336
    • /
    • 2023
  • The military has adopted and implemented risk assessment since 2013 to reduce fatalities and accident rates at construction sites. However, risk assessment is carried out as a voluntary preventive activity and is maintained as a superficial administrative process for owners. Risk assessment must comply with the Occupational Safety and Health Act and the Enforcement Guideline of Risk Assessment. However, the scope of the assessment covers many industries, including manufacturing and distribution, making it difficult to apply to construction sites. As a result, the guidelines are interpreted and applied differently at each construction site. This study aims to improve the risk assessment system so that it is applicable to construction projects and proposes the improvement of the risk assessment system by analyzing the current status of serious accidents in military construction projects.

  • PDF

건축공법 내부 리스크 분석에 관한 연구 (A Study on the Risk Analysis of Construction Method)

  • 윤여완;양극영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.117-121
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

건축공법 내부 리스크 분석에 관한 연구 (A Study on the Risk Analysis of Construction Method)

  • 윤여완;양극영
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.131-135
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로- (Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction -)

  • 복훈;김형태;강경식
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

해외투자개발사업의 건설투자자와 금융투자자간 리스크 태도 분석 (Risk Attitude Analysis between Construction Investor and Loan Investor in International PPP Project)

  • 박찬영;한승헌;정우용
    • 한국건설관리학회논문집
    • /
    • 제20권5호
    • /
    • pp.137-148
    • /
    • 2019
  • 국제 투자개발사업 시장의 확대와 국내 내수 시장 축소로 해외투자개발사업에 대한 국내 건설기업의 관심이 증가하고 있다. 그러나 개발 단계를 거치며 많은 사업들이 사업 승인 또는 입찰에 도달하지 못하고 사업 개발에 실패하였다. 본 연구에서는 사업개발 실패를 야기하는 여러 가지 이유 중 사업참여자의 리스크 태도 차이로 인한 문제에 집중하였다. 건설투자자와 금융투자자의 리스크 태도를 분석하기 위하여 건설투자자 21인과 금융투자자 21인을 통해 동일한 리스크 상황에 대한 리스크 크기를 조사하였다. 81개 리스크 상황 중 58개에서 건설투자자가 금융투자자보다 동일한 리스크 상황에 대해 리스크 크기를 낮게 평가하여 risk-seeking 태도를 보였다. 통계적으로 유의미한 차이를 보인 9개의 리스크 요인에 대해서도 금융투자자가 건설투자자보다 리스크 상황의 심각성을 높게 평가하여 risk-averse 태도를 보였다. 본 연구 결과로 건설투자자와 금융투자자간 상호 리스크 태도 차이의 이해를 통해 투자개발사업의 성공적인 개발에 기여할 수 있을 것이다.

Risk Based Decision Support for Final Closing Section of a Sea Dike

  • Jee, Sung Hyun;Kang, Seong Hae;Kim, Jeong Hwan;Seo, Jong Won
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권2호
    • /
    • pp.49-57
    • /
    • 2013
  • A sea dike construction has been increased in Korea because of the actively deployed reclamation project in basis of efficient application in land. The degree of completion in sea dike construction is affected by final closing construction, which has a lot of uncertainty that often results in higher accidents rate. Therefore, this research identified risk factors of final closing construction and classified them. This research examines the likelihood and its impact for each risk factor and calculates the risk degree as to the risk matrix. Based on this, the impact and the environmental conditions that affect to risk factors are investigated and further responsive methods are established for each risk factor. Ultimately, this research attempts to provide the risk retrenchment method for inspectors by proposing risk estimation model, responsive action list, and risk management process.

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안 (Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase)

  • 이재현;정재욱;정재민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

플랜트 유틸리티 시공에서 리스크 관리에 관한 연구 (On the Analysis of Risk Management for a Utility Construction Work in Plant Projects)

  • 한기돈;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF