• Title/Summary/Keyword: Construction Project Information System

Search Result 818, Processing Time 0.028 seconds

A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction (원전건설 공급망관리 기술영역 도출을 위한 기초연구)

  • Park, Hang-Soon;Kim, Woo-Jung;Chong, Young-Whan;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

A Study on Roadmap Strategies of Construction Project Information System using SWOT Analysis (SWOT 분석을 통한 건설사업정보시스템 로드맵 전략에 관한 연구)

  • Kim, Seong-Jin;Kim, Nam-Gon;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.10
    • /
    • pp.4837-4844
    • /
    • 2012
  • Construction Project Information System, which has promoted to improve the system during the past five years, is recently required to revise the new Roadmap of this system based on the rapidly changing construction industry's environment. For this reason, the present study was investigated the present condition of construction information, drawn CSF using SWOT method, presented the project direction, strategy, the priority plan, the specific task, and WBS by taskes. This Roadmap may be used to a basis data in measuring the result of construction informatization, and presented to the progress direction of information system in construction field.

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

A Building Information Modeling based Collaboration Supporting System for Construction Project (BIM 기반 건설 프로젝트의 협업 지원 시스템)

  • Yoon, Su-Won;Chin, Sang-Yoon;Choi, Cheol-Ho;Lee, Ghang;Shin, Tae-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.476-481
    • /
    • 2008
  • The objective of this paper is to propose a conceptual framework of a BIM based collaboration supporting System, called Construction Project Life Cycle Management (CPLM). The framework of CPLM is proposed by reflecting the characteristics of the AEC industry such as deliverly methods, process, fragmentation, etc.. And it is a system intended to help project participants make better decisions and to facilitate coordination between various stakeholders in a project by providing virtual collaboration environment.

  • PDF

THE USE OF MOBILE COMPUTERS FOR CONSTRUCTION PROJECTS

  • Chul S. Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.956-961
    • /
    • 2009
  • When construction engineers perform their work in the jobsite, they have to record as-built conditions in the project log (Data Collection). On the other hand, the engineers often have to refer to the construction documents when necessary at the job faces (Data Access). The practice of Data Collection and Data Access in the jobsite can be greatly enhanced by utilizing mobile computing with wireless communications. In this paper, two cases of mobile computing applications for construction field management are presented; Mobile Specifications System and Mobile Data Collection System. The demonstration of the process for developing two mobile applications is the primary purpose of the paper. The problems and issues involved with adopting mobile computing for construction field are also presented. The simple information framework for mobile computing has been also proposed as an outcome of the research. As for development tools, readily available relational database and wireless network have been used. The use of commercial mobile broadband was examined for data communication where local area network is not available.

  • PDF

ADOPTION OF VIRTUAL TECHNOLOGY TO BIM BASED PMIS

  • Suh, Bong-Gyo;Ghang Lee;Yun Seok-Heon
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.103-106
    • /
    • 2013
  • As construction project becomes big, PMIS has been progressed and developed as collaboration tool between project participants. But recently it has been transformed from collaboration function tool to one of formal systems, and used as a simple report or just database system. Many researches have been actively studying how to combine BIM to PMIS for solving the problem. There need transferability from PMIS to BIM, however, data size is getting big because of complexity in building size. Many users experience inconvenience in slow loading speed. Therefore, this study suggested an improvement method for high transferability by utilizing virtual technology of IT industry and analyses its suitability.

  • PDF

Effective Management of Construction Information Using a XML Based Project Deliverable Management System (XML 데이터베이스를 활용한 성과물 관리 프로세스의 효과)

  • Moon, Sungwoo;Yang, Byungsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.481-489
    • /
    • 2006
  • These days construction management is executed in an information technology environment, which creates a large volume of digital data. At the completion of a project, the contractor is required to transfer to the owner the digital data as project deliverables usually in a form of CD's. From an enterprise-wide view point, this traditional way makes the management of project deliverables ineffective as the data accumulated from different projects could be enormous. The objective of this paper is to propose a structured way to utilize a XML database for better management of project deliverables. The XML database provides an environment which users can access through a project deliverable management system (PDMS). A pilot of the PDMS has been developed to test the effectiveness of document control. The result of the test demonstrates that the effectiveness of project deliverable management can be increased by providing a high transportability and usability of data in the construction life cycle.

Design Direction of a Big Data based Performance Monitoring System using Quality Function Deployment (QFD를 이용한 빅 데이터 기반 성과 모니터링 시스템의 설계방향 도출)

  • Kim, Chang-Won;Kim, Taehoon;Seo, Junghoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.255-256
    • /
    • 2021
  • The performance measurement of construction projects has traditionally been evaluated as a prerequisite for successful project completion. Considering this importance, the UK and the US are operating quantitative performance measurement systems for construction projects. However, in the case of Korea, there is a limit to the use of existing methods due to the limitation of data collection. Recently, in consideration of the domestic situation, research is being conducted to measure the quantitative performance of a project by using big data including progress and project attribute information. Therefore, this study aims to present the design direction of a performance monitoring system using Quality Function Deployment.

  • PDF

Development of a Matadata-based Green Building Information Management System for AEC Industries

  • OH, Minho;LIM, Se Young;KIM, Yong Hee;LEE, Tae Dong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.646-647
    • /
    • 2015
  • Green building information used by the AEC industry is diverse and extensive), causing difficulties for personnel regarding the collection and utilization of information in the form of inaccurate searches about related laws, inefficient management of searched information and overlapping works. Therefore, this research aims to propose a law search system utilizing metadata for more accurate and efficient searches of green building information. The proposed system is expected to contribute to improve productivity of construction projects by reinforcing the accuracy and efficiency of searches for the collection and utilization of green building information.

  • PDF

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.