• Title/Summary/Keyword: Construction Progress Management

Search Result 342, Processing Time 0.023 seconds

A study activating devices in scheduling management for analyzing progress payment in Korea (기성지급방식 비교분석을 통한 국내 공정관리 활성화 방안에 관한 연구 -경부고속철도 공사와 대만 고속철도공사 비교 중심으로-)

  • 이태식;김영현;정현진;김영환;김대영;윤철수;노시현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.66-71
    • /
    • 2001
  • Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.

  • PDF

The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

Development of Process Management Manual for Quality Improvement of Green Building (그린빌딩의 품질향상을 위한 공정관리매뉴얼 개발)

  • Kim, Dae-Geon;Hwang, Hyun-Jun;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.245-246
    • /
    • 2013
  • The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.

  • PDF

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

Developing Computer Integrated Construction Methodologies to Improve Quality of Asphalt Pavement (아스팔트 포장의 품질향상을 위한 정보화 시공법 개발)

  • Lee Heejune
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.208-213
    • /
    • 2001
  • The current progress in computer and electrical engineering has enabled the construction industry to implement innovative technologies in design and engineering. However, the construction segment is still largely based on experience, and this makes it difficult to meet the recent rigorous specifications, especially in the highway construction. This paper describes the current progress and the findings in the development of the computer integrated asphalt paving system, which is expected to assist the equipment operators to construct the quality pavement. The technologies to collect the required information, preferably in real-time, were reviewed comprehensively, and the selected technologies are proposed for the future development. Positional and thermal data were collected at the sample project in real-time to verify the capability of the available technologies. The collected data was analyzed using multiple regression method to confirm the significant factors for the compaction of the sample project, and to develop the empirical model, which can be adopted in the future system.

  • PDF

A Study on the Application to PSM (Process Safety Management) Policy in the Construction (건설현장의 PSM(Process Safety Management) 제도 적용에 관한 연구)

  • 양광모;전현정
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.21-30
    • /
    • 2003
  • In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.

Development of Progress Measurement Framework for Mega Construction Project (대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구)

  • Ko, Sungjin;Chi, Seokho;Kim, Jinwoo;Song, Junho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.419-425
    • /
    • 2017
  • Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

An Analysis and Improvement of Progress Payment Regulations in Korea Using System Dynamics - Focusing on Public Construction Industry - (시스템다이내믹스를 이용한 국내 기성금 제도 현황 분석 및 개선방안 제시 - 공공건설분야를 중심으로 -)

  • Park, Moon-Seo;Lee, Jeoung-Hoon;Lee, Hyun-Soo;Hwang, Sung-Joo;Kim, Soo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.148-159
    • /
    • 2012
  • Recently construction companies' capital condition has been aggravated due to low profit, fierce competition and market contraction. For this reason, the companies rely on public construction projects that protect construction fee by regulations. Despite these regulations, problems regarding progress payment are constantly happening. Also, insufficient analysis on interaction between contractors makes policy making difficult. Thus, in this study, interaction between contractors are quantitatively determined according to delay of application and payment based on current public construction regulations on construction stage. A system dynamics model is used, which analyzes the problems based on an interaction between contractors, and solutions for progress payment application and payment delay are suggested according to the research results.

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF