Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.
Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
Korean Journal of Construction Engineering and Management
/
v.12
no.6
/
pp.54-64
/
2011
Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.245-246
/
2013
The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.
International conference on construction engineering and project management
/
2011.02a
/
pp.399-406
/
2011
Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.208-213
/
2001
The current progress in computer and electrical engineering has enabled the construction industry to implement innovative technologies in design and engineering. However, the construction segment is still largely based on experience, and this makes it difficult to meet the recent rigorous specifications, especially in the highway construction. This paper describes the current progress and the findings in the development of the computer integrated asphalt paving system, which is expected to assist the equipment operators to construct the quality pavement. The technologies to collect the required information, preferably in real-time, were reviewed comprehensively, and the selected technologies are proposed for the future development. Positional and thermal data were collected at the sample project in real-time to verify the capability of the available technologies. The collected data was analyzed using multiple regression method to confirm the significant factors for the compaction of the sample project, and to develop the empirical model, which can be adopted in the future system.
In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.419-425
/
2017
Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.
Korean Journal of Construction Engineering and Management
/
v.17
no.5
/
pp.54-61
/
2016
The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.
Park, Moon-Seo;Lee, Jeoung-Hoon;Lee, Hyun-Soo;Hwang, Sung-Joo;Kim, Soo-Young
Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.148-159
/
2012
Recently construction companies' capital condition has been aggravated due to low profit, fierce competition and market contraction. For this reason, the companies rely on public construction projects that protect construction fee by regulations. Despite these regulations, problems regarding progress payment are constantly happening. Also, insufficient analysis on interaction between contractors makes policy making difficult. Thus, in this study, interaction between contractors are quantitatively determined according to delay of application and payment based on current public construction regulations on construction stage. A system dynamics model is used, which analyzes the problems based on an interaction between contractors, and solutions for progress payment application and payment delay are suggested according to the research results.
International conference on construction engineering and project management
/
2005.10a
/
pp.1048-1052
/
2005
In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.