• Title/Summary/Keyword: Construction Practice

Search Result 1,083, Processing Time 0.026 seconds

Discrete Structural Design of Reinforced Concrete Frame by Genetic Algorithm (유전알고리즘에 의한 철근콘크리트 골조의 이산형 구조설계)

  • Ahn, Jeehyun;Lee, Chadon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.127-134
    • /
    • 1999
  • An optimization algorithm based on Genetic Algorithm(GA) is developed for discrete optimization of reinforced concrete plane frame by constructing databases. Under multiple loading conditions, discrete optimum sets of reinforcements for both negative and positive moments in beams, their dimensions, column reinforcement, and their column dimensions are found. Construction practice is also implemented by linking columns and beams by group ‘Connectivity’between columns located in the same column line is also considered. It is shown that the developed genetic algorithm was able to reach optimum design for reinforced concrete plane frame construction practice.

  • PDF

An Unsafe Practice Analysis considering Potential Risk to Foreign Construction Laborers in Korea

  • Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.441-449
    • /
    • 2015
  • Recently, the number of accidents reported involving foreign laborers has risen, and the need to prevent accidents at construction sites has become more urgent. It has been found that 90 percent of construction accidents are caused by unsafe work practices, and various studies have been conducted on these practices with the aim of preventing accidents at construction sites. However, the tendency with previous studies was to average the results of survey responses, and as a result it is impossible to consider the potential risk of how many foreign laborers feel unsafe in relation with the unsafe practices. Therefore, in this study, importance-performance analysis (IPA) was improved in order to assess the potential risk of the unsafe practices of foreign laborers at construction sites in Korea. To verify the applicability of the improved IPA, a survey was carried out, and then the results were compared with those of the IPA. Through the use of the improved IPA, unsafe practices that were not found in the previous IPA but have potential risk were identified. The method proposed in this study is expected to contribute to the prevention of construction accidents of foreign workers by enabling a more efficient management.

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF

A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system (건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.

Analysis of Construction Schedule Progress Management Practice (건설공사 진도관리의 현황 분석에 대한 연구)

  • Shin, Yoon-Kyung;Yun, Seok-Heon;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

Survey of Pile Foundation Construction Practice in Korea and Ground Vibration induced by Pile Driving (말뚝기초 시공현황 조사와 항타진동측정)

  • 홍성완;이원제
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.03a
    • /
    • pp.115-135
    • /
    • 1992
  • The current design and construction practice prevailing in Korea has been investigated. From the survey the various problems at hand have been listed up and evaluated. The objectives of this research is to propose the means to solve the current problems from the result of the investigation. At the same time, the propagation characteristics of vibration and noise due to construction. especially pile driving. have been studied and the current regulation that restrict these construction nuisance has been investigated by field measurement.

  • PDF

A Study on the Establishment of a Safety Management System for Construction Projects (건설안전경영시스템 모델구축에 관한 연구)

  • Kim Doo-Seok;Lee Han-Sik;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.494-497
    • /
    • 2002
  • The purpose of this study is to establish a prototype system for effective construction safety management. The research method involves comparison and adaptation into construction of quality and environment management systems in foreign and domestic manufacturing fields. The results of this study we as follows: The suggested model for construction safety management can be used effectively for the parties such as employer, employees, stakeholders, and the public especially through the application of performance measuring and reporting system.

  • PDF

Steel Module-to-Concrete Core Connection Methods in High Rise Modular Buildings: A Critical Review

  • Poudel, Bishal;Lee, Seungtaek;Choi, Jin Ouk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.571-578
    • /
    • 2022
  • Modularization in a high-rise building is different from a small building, as it is exposed to more lateral forces like wind and earthquakes. The integrity, robustness, and overall stability of the modules and their performance is based on the joining techniques and strong structural systems. High lateral stiff construction structures like concrete shear walls and frames, braced steel frames, and steel moment frames are used for the stability of high-rise modular buildings. Similarly, high-rise stick-built buildings have concrete cores and perimeter frames for lateral load strength and stiffness. Methods for general steel-concrete connections are available in many works of literature. However, there are few modular-related papers describing this connection system in modular buildings. This paper aims to review the various research and practice adopted for steel-to-concrete connections in construction and compare the methods between stick-built buildings and modular buildings. The literature review shows that the practice of steel module-to-concrete core connection in high-rise modular buildings is like outrigger beams-to-concrete core connection in stick-built framed buildings. This paper concludes that further studies are needed in developing proper guidelines for a steel module-to-concrete core connection system in high-rise modular buildings.

  • PDF

KNOTWORKING - A NOVEL BIM-BASED COLLABORATION PRACTICE IN BUILDING DESIGN PROJECTS

  • Hannele Kerosuo;Tarja Maki;Jenni Korpela
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.80-86
    • /
    • 2013
  • Knotworking represents a distributed collaborative expertise in pursuit of a task that is organized among designers from different design disciplines. Construction processes involve phases and tasks that cannot be solved in one organization only, as integration of expert knowledge from various sources is needed. Through knotworking, groups of people, tasks and tools are set to work intensively for a short period of time to solve a problem or accomplish a task. Knotworking requires intensive collaboration across organizational boundaries and hierarchies. The practice of knotworking has been developed and applied in the development of healthcare organizations, libraries and school-university relationships, but it has not previously been applied in the construction industry. In this paper, we describe the concept of knotworking and the findings of a case study that we completed in the Finnish construction industry. We will also compare the similarities and differences of the Big Room and knotworking in terms of participants, duration, target, space/infrastructure, benefits and challenges. Finally, we present some suggestions for further research and experimentation on knotworking in construction projects.

  • PDF