• 제목/요약/키워드: Construction Period Reduction

검색결과 227건 처리시간 0.036초

역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석 (Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method)

  • 박용현;주영규
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

조강콘크리트를 사용한 구조물의 공기단축 관련 현장적용에 관한 연구 (A Study on Field Application of Early Strength Concrete for Construction Work Period Reduction)

  • 김민정;김동진;이상호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.155-156
    • /
    • 2009
  • 본 연구에서는 자사에서 실시 된 관련 연구의 조강콘크리트 시험결과를 근거로 이를 현장에 적용하기 위하여 공기단축에 의해 발생될 수 있는 공정 및 장비 변경, 공사에 소요되는 금융비용 절감 효과를 검토하였다.

  • PDF

보라매 대교빌딩 리모델링을 위한 지진응답 저감기술 적용사례 (Application of the Seismic Response Reduction Technology for Boramae Deokyo Building Remodeling)

  • 박영미;박기홍;조성준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.134-136
    • /
    • 2013
  • In general, the seismic retrofit is almost essential to extend and remodel aged buildings. Because domestic seismic design code has been enhanced, seismic performance should be secure for aged building remodeling. Seismic response reduction device (damper) is lately appling to ensure seismic performance. This device is economical efficiency method that can reduce the load to foundation and the range of structural reinforcements, shorten of construction period. New shaped steel damper was applied for extension and remodeling construction for Boramae Deakyo building. As a result, the economy and shortening of construction period was achieved.

  • PDF

조강형 결합재를 사용한 콘크리트의 공기단축에 관한 실험적 연구 (An Experimental Study on Reduction of Working Period of Concrete using High Early Strength Binder)

  • 김동진;김민정;이상호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.513-516
    • /
    • 2008
  • 최근 건설경기의 침체 및 원자재가 상승 그리고 후분양제의 시행 등으로 인해 공사기간 단축에 의한 공사비 절감에 대한 요구가 증가하고 있다. 공사기간 단축을 위한 방안으로 조강 콘크리트를 사용하여 양생기간을 단축시키는 방법이 일반적으로 사용되어지나 기존의 조강시멘트나 조강혼화제를 사용할 경우 고가의 재료비용이 소요될 뿐 아니라, 콘크리트의 초기 수화열 증가 및 작업성 저하 등의여러 가지 문제가 발생되고 있다. 본 연구에서는 조강형 결합재와 혼화제를 사용한 콘크리트의 현장에 적용하여 거푸집 탈형 시기를 앞당김으로써 공기단축에 의한 공사비 절감을 달성하고자 한다. 조강형 결합재와 혼화제를 사용한 콘크리트의 현장 적용성을 확인하기 위하여 기존의 조강시멘트와 조강혼화제를 사용한 콘크리트와 함께 경시변화시험 및 응결시간 측정시험 그리고 압축강도시험 등의 비교 시험을 실시하였다.

  • PDF

공동주택 공기단축을 위해 개발된 조강 콘크리트의 강도 발현 특성에 관한 연구 (An Experimental Study on Strength Properties of Early Strength Concrete for Reduction of Working Period in Apartment)

  • 정양희;이재현;금경훈;이원암;김선만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.157-160
    • /
    • 2009
  • The decision of the Form removal time which leads the early assuring strength of the concrete from Apartment construction is the fact which is important from Reducing the period of works and the economical efficiency side. Especially, with Complex building of recent times the same Tall building and Multiple Apartment Site which only follows in upgrade of interior construction of apartment site and shortening the frame construction period becomes very, importantly is the actual condition where the effort which is various for this is attempted. But is caused by with limit and economical efficiency problem of case concrete early strength revelation of most and is not put to practical use is the actual condition. Develops concrete mixture which is a utility from the research which sees hereupon and the effect which is economic leads construction duration shortening under maximizing boil.

  • PDF

수질오염총량관리 시행계획에서 수립된 삭감계획의 평가 (Evaluation of the Established Reduction Scheme in Implementation Plan of Total Maximum Daily Loads)

  • 박재홍
    • 한국물환경학회지
    • /
    • 제24권3호
    • /
    • pp.297-305
    • /
    • 2008
  • It is necessary to select proper reduction methods and to calculate reasonably reduction amount for making good practice of the reduction scheme. Moreover, it is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). Even though much of the budget have been supported from national treasury (about 50%), it is thought the role of the local government must be strengthened gradually.

단독주택의 구조체 공사에 있어 Tilt-up 공법의 현장적용 (Application of Tilt-Up Construction Method for Building Single-Family house)

  • 전세미;김명길;안연수;소광호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.136-137
    • /
    • 2015
  • Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.

  • PDF

공사기간 단축을 위한 원자로 건물 외벽 거푸집 개발 (Development of RCB Exterior Wall Form for Duration Reduction)

  • 조예림;신윤석;고영태
    • 한국산학기술학회논문지
    • /
    • 제19권1호
    • /
    • pp.587-595
    • /
    • 2018
  • 세계에서는 지구온난화 등에 따른 기후 변화에 대응하여 원전 건설을 금지해오던 국가들도 점점 허용하는 추세이다. 따라서 앞으로의 원전 건설이 늘어날 것이며 이에 대한 경쟁 또한 심화될 것이다. 원전 프로젝트는 일반 건설 공사와 비교하여 공사 기간이 매우 길다. 원전 건설 프로젝트에서 경쟁 우위를 확보하기 위해 원전 공사 기간을 줄일 수 있는 기술을 개발하는 것이 필요하다. 따라서 본 연구의 목적은 원자로 건물 외벽 거푸집의 높이를 3m에서 4m로 증가시킴으로써 공사 기간을 감소시키기 위한 원자로 건물 외벽 거푸집을 개발하는 것이다. 개발된 거푸집을 원전 프로젝트에 적용하기 위해 구조적 안전성과 시공성 및 경제성을 분석하였다. 현장 적용 가능성을 평가한 결과 개발된 거푸집은 구조적으로 안전했다. 그리고 시공 단수가 감소함으로써 공사 기간이 단축되고 공사비 또한 절감되는 효과를 확인하였다. 본 연구의 결과는 향후 원자로 건물의 공사 기간 단축을 위한 지속적인 기술 개발을 위한 자료로 활용하여 한국의 세계 원전시장에서의 경쟁력 확보에 기여할 수 있을 것으로 사료된다.

U-플랜지 트러스 복합보를 사용한 근린생활시설의 경제성 분석 (Economic Analysis of Neighborhood Facility using the U-flanged Truss Hybrid Beam)

  • 오명호;박성진;김영호
    • 한국공간구조학회논문집
    • /
    • 제21권3호
    • /
    • pp.77-84
    • /
    • 2021
  • In this study, In order to apply the U-flanged truss hybrid beam to the actual construction site, the structural design of the basic module of the middle and low-rise neighborhood living facilities was performed according to the Korea Design Standard, and the construction cost and construction period were compared with the traditional reinforced concrete structure system. As a result of analyzing the construction cost for the basic module, if the U-flanged truss hybrid beam and D-Deck slab system are used, the construction cost can be reduced by 86% compared to the traditional reinforced concrete structure system. In addition, as a result of analyzing the construction period for a floor area of 1,000m2, using the U-flanged truss hybrid beam and D-Deck slab system can save 2.0days in construction period compared to the traditional reinforced concrete structure system. Therefore, the U-flange truss hybrid beam can secure sufficient economic feasibility compared to the existing reinforced concrete method in terms of cost reduction and shortening of construction period.

건설현장 관리기사의 안전관리 효과에 대한 인식도

  • 고병인;임현교
    • 한국산업안전학회:학술대회논문집
    • /
    • 한국안전학회 1998년도 춘계 학술논문발표회 논문집
    • /
    • pp.265-270
    • /
    • 1998
  • As the goal of enterprises is to pursuit benefits, the goal of safety management is not only preventing accidents but also promoting benefits and productivity. However, enterprises have failed to realize the necessity of safety management, partly because they didn't grasp any appropriate evidences advocating effectiveness of safety management. This study aimed to survey construction-site engineers' consciousness on safety management contributing to cost reduction, construction period and quality enhancement. The result of this study showed that constriction-site engineers recognized the ratio of direct cost to Indirect cost as 1:2. The proportion of repliers who thought that safety management is contributable to cost reduction was 35%, to construction period was 20%, and to quality enhancement was 48%. The construction sites with excellent safety accomplisments also had good work and selling amounts.

  • PDF