PC공법을 이용한 최적의 구조설계 (The Optimal Design of a PC System in HIBRAND)

  • 김종수;박형석;최동섭
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.298-301
    • /
    • 2006
  • The HIBRAND located in Yangjaedong, Seochogu, Seoul is a large complex shopping center of total space 48,000 p'yongs which consists of a nineteen-story business facility and a six-story sale facility. In the case of a big construction work in the downtown, they are suffered much difficulty by construction period and working space lack. They, however, can satisfy construction period, constructability and quality using a PC system in HIBRAND. Also, we maximized the advantage of each material being the abreast of a RC and steel structure method partially and devised a reasonable copula. A PC system with advantages of construction period, constructability and quality assurance should be actively practiced to big downtown construction work.

  • PDF

제주도내 공사중단 장기방치 건축물 현황과 문제점 (Status and Problems of Buildings Neglected for Long Period after Discontinuance of Construction in Jeju)

  • 김두성;한인덕;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.153-154
    • /
    • 2023
  • Neglected buildings for long period can seriously reduce the durability of the building due to rust in rebars and deterioration in concrete quality due to exposure to outside air, and the seriousness of suspended buildings such as safety accidents and social crimes is emerging due to poor management. In this study, various problems such as the occurrence of safety accidents were analyzed through a fact-finding survey of buildings that have not been maintained due to long-term neglect in all areas of Jeju. In order to reuse a building that has been discontinued, the safety of the building structure itself must be checked. After securing safety through durability investigation, construction should be resumed or converted into a normal building through re-purposing, dismantling, remodeling, etc.

  • PDF

Chloride penetration in anchorage concrete of suspension bridge during construction stage

  • Yang, In-Hwan;Yoon, Yong-Sik;Kwon, Seung-Jun
    • Advances in concrete construction
    • /
    • 제10권1호
    • /
    • pp.13-20
    • /
    • 2020
  • Steel corrosion in embedded steel causes a significant durability problems and this usually propagates to structural degradation. Large-scaled concrete structures, PSC (Pre-stressed Concrete) or RC (Reinforced Concrete) structures, are usually constructed with mass concrete and require quite a long construction period. When they are located near to sea shore, chloride ion penetrates into concrete through direct or indirect exposure to marine environment, and this leads durability problems. Even if the structures are sheltered from chloride ingress outside after construction, the chloride contents which have been penetrated into concrete during the long construction period are differently evaluated from the initially mixed chloride content. In the study, chloride profiles in cores extracted from anchorage concrete block in two large-scaled suspension bridge (K and P structure) are evaluated considering the exposure periods and conditions. Total 21 cores in tendon room and chamber room were obtained, and the acid-soluble chlorides and compressive strength were evaluated for the structures containing construction period around 3 years. The test results like diffusion coefficient and surface chloride content from the construction joint and cracked area were also discussed with the considerations for maintenance.

Freiesleben 함수를 이용한 콘크리트구조물의 새로운 강도관리모델 적용에 관한 연구 (A Study on the Application of New Strength Control Model of Concrete Structure using Freiesleben Function)

  • 김무한;남재현;김정일;길배수
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제7권2호
    • /
    • pp.135-140
    • /
    • 2003
  • As a construction technique is developed recently, the construction space and construction period are considered to important matters. Especially, in case of construction period, several method is proposed for strength control in the construction field. However there are very little strength control models for application of internal condition. The purpose of this study is to develop a strength control model for application of variety internal condition at construction field. The results are as follows ; 1) According to the results of compressive strength of concrete evaluated by logistic curve and proposed curve, proposed curve is applicable of construction field because there is similar relation with logistic curve. 2) It is shown that the construction period is shortened by reduction of the formwork removal time, because a predicted compressive strength of using the new curve is higher than the proposed compressive strength of standard.

조강형 결합재를 사용한 콘크리트의 공기단축에 관한 실험적 연구 (An Experimental Study on Reduction of Working Period of Concrete using High Early Strength Binder)

  • 김동진;김민정;이상호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.513-516
    • /
    • 2008
  • 최근 건설경기의 침체 및 원자재가 상승 그리고 후분양제의 시행 등으로 인해 공사기간 단축에 의한 공사비 절감에 대한 요구가 증가하고 있다. 공사기간 단축을 위한 방안으로 조강 콘크리트를 사용하여 양생기간을 단축시키는 방법이 일반적으로 사용되어지나 기존의 조강시멘트나 조강혼화제를 사용할 경우 고가의 재료비용이 소요될 뿐 아니라, 콘크리트의 초기 수화열 증가 및 작업성 저하 등의여러 가지 문제가 발생되고 있다. 본 연구에서는 조강형 결합재와 혼화제를 사용한 콘크리트의 현장에 적용하여 거푸집 탈형 시기를 앞당김으로써 공기단축에 의한 공사비 절감을 달성하고자 한다. 조강형 결합재와 혼화제를 사용한 콘크리트의 현장 적용성을 확인하기 위하여 기존의 조강시멘트와 조강혼화제를 사용한 콘크리트와 함께 경시변화시험 및 응결시간 측정시험 그리고 압축강도시험 등의 비교 시험을 실시하였다.

  • PDF

Urban facility construction planning system using location-time information

  • Shin, Jaehyeon;Lee, Sang-Joon;Kwak, Ho-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권1호
    • /
    • pp.187-195
    • /
    • 2019
  • In this paper, a shared model of systematic urban facility construction planning system is proposed. As the scope of construction on urban facilities has expanded, the construction process may occur simultaneously in the same location and short period of time by the different public agencies. This kind of construction duplications may cause the inefficiency of construction time and cost. In order to improve this, we studied the sharing method of the construction information which are produced by the different construction agencies. And also studied the method of find out the duplicate constructions occurring in the same place and short period of time. And Then we suggest a system that can rearrange the order of urban facility construction.

한국(韓國) 선사시대(先史時代) 및 삼국시대(三國時代) 주거사(住居史)의 시대구분(時代區分)에 관한 재고(再考) (A Study on the Periodization in the History of Korean dwellings during the age of prehistory and the ancient Kingdomes)

  • 강영환
    • 건축역사연구
    • /
    • 제5권2호
    • /
    • pp.9-24
    • /
    • 1996
  • Owing to the energitic studies of the leading shcolars, some paradigmatic theories on the history of Korean dwellings have been suggested. They constructed periodization of their own and defined characteristics of each period with very limited historical materials. However the new historical materials have been discovered in the neighboring academic fields, which require to review the existing theories. This study aims at restructuring periodization in the history of Korean dwellings during the age of The prehistory and The ancient Kingdomes. Through the study, the existing theories on the same period are revived and evaluated based on the new materials. I suggest a new theory on the periodization and the characteristics of each period: a. the paleolithic period(6,000,000 B.P.-10,000 B.P.) : natural shelter, the emergence of man-made dwellings b. the neolithic period(10,000 B.P.-1,000 B.C.) : construction of pit house c. the bronze period(1,000 B.C.- 300 B.C.) : construction of semi-pit house d. the early metalic period(300 B.C. - 300 AD.) : construction of house on the ground level development of the Ondol system e. the ancient kingdomes period(300 AD - 700 AD): classification of housing type

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

주거용 RC 벽식 건물의 시공 중 재현주기에 따른 지진하중의 영향 (Effects of Seismic Loads with Different Return Period on Residential Building with RC Shear Wall Structure under Construction)

  • 최성현;김재요
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제26권2호
    • /
    • pp.43-50
    • /
    • 2022
  • 설계단계에서 구조적 안전성을 확인하더라도, 시공단계에서는 구조시스템이 완전히 형성되지 않아 구조적 안전성이 보장되지 않는다. 또한 시공 기간은 완공된 이후의 건물의 사용기간보다 짧기 때문에 설계단계에서와 같은 지진하중을 시공단계에 적용하는 것은 과다하다. ASCE 37-14는 시공 중 지진하중 저감계수의 개념을 제시하고 있지만, 명확한 적용 방법을 제공하지 않고 있다. 따라서, 이 연구에서는 재현주기에 따라 저감한 지진하중을 주거용 중층 RC건물의 예제 모델에 적용하였다. 예제모델의 시공단계를 5층 단위로 구분하였으며, 시공단계 모델들에 재현주기 변화에 따른 지진하중을 적용하여 시공 중 지진하중을 분석하고 구조 부재의 단면성능 검토를 수행하였다. 설계단계와 시공단계에서의 전단벽 설계강도비를 비교하여, 주거용 중층 RC 건물의 시공 중 안전성을 확보할 수 있는 지진하중 크기의 범위를 재현주기의 관점에서 분석하였다.

조강콘크리트를 사용한 구조물의 공기단축 관련 현장적용에 관한 연구 (A Study on Field Application of Early Strength Concrete for Construction Work Period Reduction)

  • 김민정;김동진;이상호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2009년도 춘계 학술대회 제21권1호
    • /
    • pp.155-156
    • /
    • 2009
  • 본 연구에서는 자사에서 실시 된 관련 연구의 조강콘크리트 시험결과를 근거로 이를 현장에 적용하기 위하여 공기단축에 의해 발생될 수 있는 공정 및 장비 변경, 공사에 소요되는 금융비용 절감 효과를 검토하였다.

  • PDF