• 제목/요약/키워드: Construction Performance

검색결과 8,022건 처리시간 0.034초

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.

  • PDF

MEASURING PERFORMANCE IN EGYPTIAN CONSTRUCTION FIRMS APPLYING QUALITY MANAGEMENT SYSTEMS

  • Manal S. Abd Elhamid;Sahar. Sh. Ghareeb;Ramadan O. Mohamed
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.149-156
    • /
    • 2011
  • The performance measurement of construction firms is considered as a competitive advantage to develop and improve their performance to have place in the market and stay able to face the continuous challenge. Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies showed. However, measuring that performance to include all the firm's aspects in a competitive way is a crucial process for the ECF's culture. The research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance on the organization level, and explore its impact on the organization that adopt quality management system. This model is based on specific elements and their related indicators which have been derived from national approaches and models of measuring performance (benchmarking, quality awards and six sigma).Elements determination and the status of their real practice has been investigated through a questionnaire to a representative sample of ECF. This model determines the performance level (PL) of the organization that measured by a mean of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the Egyptian construction firms. So, the final outcome of the model reveals the level of firm performance that helps the firm to identify the weak points against the strong ones, Confirm the priorities and identify new opportunities for developing, and Check the position of the company in the market among the others. Another questionnaire has been developed to be distributed on a group of Experts on measuring performance for the purpose of model validation. The majority of surveyed experts agreed that the proposed model can be applied effectively.

  • PDF

건설-IT융합 기술을 위한 터널 환경에서 무선 메쉬 네트워크를 이용한 실험적 성능 검증 (Empirical Evaluation of Wireless Mesh Networks for Construction IT in Tunnel Environments)

  • 양창모;이승범;최수환;엄두섭
    • 한국IT서비스학회지
    • /
    • 제10권2호
    • /
    • pp.271-279
    • /
    • 2011
  • This paper draws performance results through comparing WMNs' methods when the WMNs are used in tunnel construction sites. There are many advantages of WMNs : lower cost, easy to network maintenance, robustness and reliability within RF-ranges. As a result, using the WMNs would be suitable to employ as a network infrastructure for the construction sites. This paper evaluates the performance of WMNs which we have installed in a tunnel construction. Through the performance results, we conclude the performance of data throughputs gets lower when we perform the network in tunnel environments. We make attempts WMNs' two major methods which are SISC(Single Interface with Single Channel) and MIMC(Multi Interface with Multi Channel) to figure out which method will be better for the construction sites. Through the experiments, the WMN based on the MIMC method was comparatively suitable in network performance aspect for the tunnel Sites.

표면처리방법에 따른 초고성능 콘크리트의 전단부착성능 평가 연구 (An Assessment of Bonding Shear Performance of Ultra-high-performance Concrete Regarding Interface Treatment)

  • 장현오;박진호;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.81-82
    • /
    • 2016
  • The present study aims to derive optimal interface treatment conditions for emulating a monolithic construction. The joints in this construction are formed through the bonding shear evaluation method during the placement of ultra-high-performance concrete (UHPC) and normal strength concrete (NSC). The evaluation items include push-off tests for homogeneous UHPC + UHPC and heterogeneous NSC + UHPC. The experimental samples comprised a monolithic placement as the baseline, two levels for the separated placement according to the compression strength of concrete, and five levels for the interface treatment. The increase in the number of grooves and their cross-sectional areas only slightly influenced the bonding shear performance. The optimal interface treatment method for the homogeneous UHPC + UHPC construction grooves was at least 30mm. The heterogeneous NSC + UHPC construction should utilize waterjet roughening to expose the aggregate for the increased roughness.

  • PDF

Development of Expertise-based Safety Performance Evaluation Model

  • Yoo, Wi Sung;Lee, Ung-Kyun
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.159-168
    • /
    • 2013
  • Construction projects have become increasingly complex in recent years, resulting in substantial safety hazards and frequent fall accidents. In an attempt to prevent fall accidents, various safety management systems have been developed. These systems have mainly been evaluated qualitatively and subjectively by practitioners or supervisors, and there are few tools that can be used to quantitatively evaluate the performance of safety management systems. We propose an expertise-based safety performance evaluation model (EXSPEM), which integrates a fuzzy approach-based analytic hierarchy process and a regression approach. The proposed model uses S-shaped curves to represent the degree of contribution by subjective expertise and is verified by a genetic algorithm. To illustrate its practical application, EXSPEM was applied to evaluate the safety performance of a newly developed real-time mobile detector monitoring system. It is expected that this model will be a helpful tool for systematically evaluating the application of a robust safety control and management system in a complex construction environment.

PERFORMANCE EVALUATION FOR CONSTRUCTION VALUE ENGINEERING STUDY

  • Wei Tong Chen;Hong-Long Chen;Po-Yi Chang;Tsang-Jung Wang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.347-352
    • /
    • 2005
  • This paper presents an evaluation model for the performance of Value Engineering Study (VES) for construction projects. The proposed model consists of 6 PEGs and 32 PEIs. The expertise of the proposed model was collected from VE experts in Taiwan using two-phase questionnaire survey. One real-life VES of construction projects was used to demonstrate how the proposed model works. The proposed model not only can be used by project owners to appraise the performance of VES team but also be used by the VES teams to conduct self-diagnosis, improvement, and motivation for achieving better performance. Additionally, the proposed model is capable of: (1) clarifying the defects of VES and avoiding committing same mistakes, (2) assisting inexperience team members to implement VES and catch the critical issues of a VES.

  • PDF

CONSTRUCTION LOST-TIME INJURIES IN LAOS: AN EXPLORATORY STUDY

  • Luu Truong Van;Soo-Yong Kim;Somsana T.K.P
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.229-238
    • /
    • 2007
  • This paper presents a study on construction safety in the People Democratic Republic of Laos (PDRL). Fifty workers experienced certain injuries in their construction sites and 15 top managers were interviewed in twenty-six construction projects in Vientiane, the capital of PDRL. Research results show that stepping on and/or striking against objects (48%), struck by falling objects (24%), falling of persons (12%) are major types of construction injuries. The paper stresses that the ignorance of top managers about their crucial role in safety improvement, using safety incentive to raise safety performance, lack of thorough understanding about benefit from labor safety performance, and the willingness to cut off safety performance expenditures is considered as obstructions of safety improvement programs. The survey indicates that physical working conditions, relationship among workers, foremen behaviors and the monthly wage were influencing factors to worker's job satisfaction. The study also highlights afternoon as dominant time that led to a large number of injuries.

  • PDF

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

건설산업에서 프로젝트관리오피스(PMO)와 프로젝트성과의 영향관계 분석: PM리더십 조절효과 중심으로 (Analyzing the Influential Relationship between PMO and Project Performance in Construction Industry: Focusing on Moderation Effect of PM Leadership)

  • 이헌창;박소현;김승철
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.133-145
    • /
    • 2021
  • Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.

건축 프로젝트의 경영성과지표 선정 연구 (Key Performance Indicators of Building Project)

  • 최재휘;손효원;김선국
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.61-72
    • /
    • 2011
  • 건설기업의 경영성과는 제각기 다른 프로젝트들의 경영성과 합과 같으므로, 건설 프로젝트 수행에 따른 경영성과 측정은 기업 경쟁력 확보를 위해 필수적이다. 그러나 현재까지 대부분의 연구는 건설 산업 및 기업의 성과 측정과 관련되어 있으며, 개별 프로젝트의 성과 측정을 위한 연구는 여전히 미비한 실정이다. 특히 건축 프로젝트는 발주자, 형태, 사업주체에 따라 다양한 특성을 가지고 있지만, 이러한 구분에 따른 성과지표 선정은 이루어진 바없다. 따라서 본 연구는 건축 프로젝트의 시공 및 시운전 단계에서 공통적으로 경영성과를 측정할 수 있는 지표뿐만 아니라, 프로젝트 특성에 따라 세분화된 분야의 지표를 선정하는 것을 목적으로 한다. 향후 본 연구에서 제시한 지표들은 이를 평가할 수 있는 방법을 개발하고, 실제 건축 프로젝트에 적용하여 정량화된 점수로 산출이 가능할 것이다. 또한 플랜트 및 토목 프로젝트의 경영성과를 측정할 수 있는 지표 선정을 위한 참고자료로 사용될 것으로 사료된다.