• Title/Summary/Keyword: Construction Performance

Search Result 8,022, Processing Time 0.033 seconds

The Application of Fuzzy Logic to Assess the Performance of Participants and Components of Building Information Modeling

  • Wang, Bohan;Yang, Jin;Tan, Adrian;Tan, Fabian Hadipriono;Parke, Michael
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.4
    • /
    • pp.1-24
    • /
    • 2018
  • In the last decade, the use of Building Information Modeling (BIM) as a new technology has been applied with traditional Computer-aided design implementations in an increasing number of architecture, engineering, and construction projects and applications. Its employment alongside construction management, can be a valuable tool in helping move these activities and projects forward in a more efficient and time-effective manner. The traditional stakeholders, i.e., Owner, A/E and the Contractor are involved in this BIM system that is used in almost every activity of construction projects, such as design, cost estimate and scheduling. This article extracts major features of the application of BIM from perspective of participating BIM components, along with the different phrases, and applies to them a logistic analysis using a fuzzy performance tree, quantifying these phrases to judge the effectiveness of the BIM techniques employed. That is to say, these fuzzy performance trees with fuzzy logic concepts can properly translate the linguistic rating into numeric expressions, and are thus employed in evaluating the influence of BIM applications as a mathematical process. The rotational fuzzy models are used to represent the membership functions of the performance values and their corresponding weights. Illustrations of the use of this fuzzy BIM performance tree are presented in the study for the uninitiated users. The results of these processes are an evaluation of BIM project performance as highly positive. The quantification of the performance ratings for the individual factors is a significant contributor to this assessment, capable of parsing vernacular language into numerical data for a more accurate and precise use in performance analysis. It is hoped that fuzzy performance trees and fuzzy set analysis can be used as a tool for the quality and risk analysis for other construction techniques in the future. Baldwin's rotational models are used to represent the membership functions of the fuzzy sets. Three scenarios are presented using fuzzy MEAN, AND and OR gates from the lowest to intermediate levels of the tree, and fuzzy SUM gate to relate the intermediate level to the top component of the tree, i.e., BIM application final performance. The use of fuzzy MEAN for lower levels and fuzzy SUM gates to reach the top level suggests the most realistic and accurate results. The methodology (fuzzy performance tree) described in this paper is appropriate to implement in today's construction industry when limited objective data is presented and it is heavily relied on experts' subjective judgment.

Understanding the Relationship between Construction Workers' Psychological Conditions and Safety Factors

  • Lim, Soram;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.138-141
    • /
    • 2015
  • The South Korean construction industry has shown a high proportion of industrial accidents (approximately 28% of whole injuries) and the continuously increasing accident rate. Although many safety research emphasized that the 3E (Enforcement, Education, and Engineering) approach is a potential solution to enhance workplace safety, there should be benefits to consider psychological (i.e., Emotional) effects on the safety performance since most construction works are human-oriented. Thus, understanding construction workers' psychological conditions can be a priority. This research studied the relationships between psychological conditions-which cover stress, personal temperament, emotional disturbance, and drinking habit-and specific safety-related factors including safety motivation and knowledge, and safety performance of individual workers at a construction site. This study conducted a survey of 430 respondents and analyzed the data with the multiple linear regressions. The results imply persistence, trait anxiety, and problem-focused coping style are the critical factors that should be controlled for enhancing jobsite safety. Finally, the research outcomes could be applied to build a strategic safety management plan for a construction manager.

  • PDF

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

The Empirical Analysis for Competitiveness of Small & Medium Construction Companies using Key Performance Indicators(KPI) (경영성과지표(KPI)를 이용한 중소건설기업 경쟁력 실증분석)

  • Park, Hong-Jo;Ji, Hyun-Mi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.2
    • /
    • pp.199-209
    • /
    • 2017
  • The measurement of business performance is important to secure the competitiveness of construction companies. Therefore, the purpose of this study is to analyze what is needed to increase the competitiveness of small & medium construction companies. In order to analyze efficiently, this study reconfirms the effectiveness of Key Performance Indicators(KPI) of construction companies selected from previous studies. The empirical analysis to find differences of KPI between small & medium construction companies and big construction companies is performed using the 4,286 construction company samples extracted by 'KIS-Value Data Base'. The results of the empirical analysis show that there are significant differences in characteristics of KPI between small & medium construction companies and big construction companies. Particularly, small & medium construction companies are relatively insufficient to invest for the purpose of preparation for future and long-term growth. Additionally, empirical tests reconfirm that most of the KPIs from previous survey studies are suitable as a performance indicators. The contribution of this study is to analyze empirically small & medium construction company's strong & weak points and the effectiveness of KPIs derived from previous studies.

Influence of Site Organization's Communication on Performance of Building Construction Projects (건축프로젝트 현장 조직 커뮤니케이션이 성과에 미치는 영향)

  • An, Sung-Hoon;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.361-367
    • /
    • 2017
  • The success of building construction projects is dependent on the cooperative ability of site organization members, which related with an organizational communication level. Therefore, the purpose of this study is to study the influence of site organization's communication on the performance of building construction projects. The results of this research are revealed that the communication quality has positive influence on the performance of building construction projects, and the information sharing has negative influence based on the results of the multiple regression analysis. So it needed to improve the performance in building construction projects that the information is shared with a normal level. the communication quality should be also raised in the project site organization. This study is expected to help to structure the site organizational management system in the building construction projects.

Performance Measurement Method and Case Study for BIM based Construction Simulation System (BIM기반의 건축시공시뮬레이션 시스템 성능분석 방법 및 사례연구)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.15-23
    • /
    • 2013
  • Because that construction project is usually uncertain and the plan of it changes frequently, it is difficult to make a reliable and feasible plan for it. As the BIM technology is developed, we can simulate the future of the construction project visually and make more reliable plan. However, data production efficiency is not so high, it is used just for animation and presentation usage. Although, a lot of construction simulation systems are developed, it is difficult to measure performance of them. In this study, we defined the construction simulation work process and the scenarios to measure performance of them. The performance measurement method using simulation process scenario can make possible benchmark test of them.

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Innovation Culture and Process in Mediating Human Capital Supply Chain on Firm Performance

  • MUAFI, Muafi;SISWANTI, Yuni;DIHARTO, Awan Kostrad;SALSABIL, Imanirrahma
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.9
    • /
    • pp.593-602
    • /
    • 2020
  • The purpose of this study is to examine and analyze the effect of human capital supply chain on the firm performance mediated by innovation culture and innovation process on small- and medium-sized construction enterprises (SMEs) in Indonesia. A survey has been distributed to all construction SMEs that have direct involvement in construction work (contractors and subcontractors). The construction SMEs including medium- and small-scale construction services in three Provinces, namely, the special region of Yogyakarta, East Java, and Central Java. Through purposive sampling technique, primary data is collected by giving a questionnaire to the owner/manager of construction SMEs. The target sample in this study was 200 respondents who have been operating for a minimum of two years. 154 valid questionnaires could be processed. Data analysis uses structural equation modeling with AMOS 24. The results of the study conclude that there is a positive effect on human capital supply chain on firm performance mediated by innovation culture and innovation process, while innovation culture does not affect firm performance. In sum, the innovation culture mediates the relationship between human capital supply chain and firm performance, and the innovation process mediates the relationship between human capital supply chain and firm performance.

Research on Importance-Performance Analysis of Smart Construction Safety Management System (스마트 건설안전관리시스템의 중요도-성과도 분석 연구)

  • Jong-Yil Park;Chang-Hee Yun
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.2
    • /
    • pp.43-53
    • /
    • 2024
  • This study analyzes the importance-performance analysis (IPA) of the 10 dimensions of the smart construction safety management system, and analyzes which dimensions are important and which dimensions are performing to determine key improvement tasks, incremental improvement tasks, Maintenance and reinforcement tasks and continuous maintenance tasks were derived. Among the 10 dimensions of the smart construction safety management system, the dimensions that are recognized as important by all field managers and field workers and have high performance are the automatic risk displacement measurement system, smart environmental sensor system, and heavy equipment seizure prevention system. However, areas that were perceived as having high importance but low performance were worker location tracking systems, smart safety helmet chin muscles, and smart safety ring fastening. Among the smart construction safety management systems perceived by field managers, areas for key improvement with high importance and low performance included worker location tracking system and smart safety ring fastening. Among the smart construction safety management systems perceived by field workers, the area for key improvement with high importance and low performance was the automatic risk displacement measurement system.