Proceedings of the Korean Institute of Building Construction Conference
/
2021.11a
/
pp.46-47
/
2021
In the construction industry, due to the nature of the job, the need for job training to maximize the performance of the job and to improve the organization's qualifications is needed to acquire professional knowledge that is practiced according to the training needs of the members of the organization. In the form of education, the government or the government or the government provides systematic and planned professional job training that is implemented to improve qualifications and instill pride in the profession by helping the employees of the design office acquire new knowledge, skills, and attitudes necessary for professional performance. Although it is recommended at the organizational level, as a result of examining the implementation, it was found that most workers did not receive job training activities. Therefore, follow-up studies that can maximize work efficiency at the individual and organizational level of design office workers should be continuously performed.
Sacchettini, Lou;Park, Moonseo;Lee, Hyun-Soo;Lee, Jin Gang
International conference on construction engineering and project management
/
2015.10a
/
pp.236-240
/
2015
The accelerating adoption of BIM (Building Information Modeling) is challenging collaboration practices established in the construction industry. The implementation of BIM involves changes in participants work, organization, processes and collaboration methods. Therefore there is a need to be able to measure effectively and accurately collaboration, in order to analyze and determine current practices and their performances in organizations (company, team project) as well as changes required. Previous researches scope from evaluating BIM maturity of an organization to BIM collaboration requirements but lack of proper tools and methods to analyze collaboration performances. This is especially true when it comes to evaluate the efficiency and collaboration performances of processes rather than systems or organizations. Thus this research aims to analyze systematically and comprehensively previous researches proposing diversified methods to evaluate BIM performances and collaboration. Furthermore it aims to suggest key indicators to evaluate collaboration performances of processes and project organizations. This research may contribute to better understanding of collaboration performances within organizations using BIM and further development of evaluation method for analyzing BIM design project.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.191-202
/
2004
In this study, the project manager-oriented organization model has been verified by analysing it with forming a clear definition of detailed unitary duty entity to develop current non-efficient CM system constituted by functional organization with the decentralized responsibility and apply the model As a result from verification that the model provides valid solutions by comparing it with the existing, the model is better than the existing in cost savings, target profit sales rate, total rate of new on sales. Moreover, various activities in cost savings and cases where improvement is feasible are executed. However, the model caused some problems in organizational operation, project management and in division of duties so this study proposed improving management method
Journal of the Korean Society of Environmental Restoration Technology
/
v.4
no.1
/
pp.67-79
/
2001
According to the new general movement of ESSD in Korea, the role, background, and subjects, etc. of Ecological Restoration Area were studied to find out the way for this area to be settled as one kind of industry. Questionnaire and literature study were carried out to understand and to find out the way of the area settlement with the conceptual and practical definition of it. The related sub-areas studied were 1. regulations and standards including design and construction 2. researches and developments around the area 3. related curriculums applying in the educational organizations 4. present situation of the industry. Followings are the results of this study and several proposals for the area to be settled in Korea with the other related areas. 1. The boundary of Ecological Restoration could be defined as the concept of preservation(or conservation) and restoration of the ecosystem with ecological planting - including the restoration strategies for the areas of slope, artificial foundations, watersides and wetlands, with in bio-diversity and eco-forests for these areas. 2. It seems that the more investments needed for the elaborate and professional techniques to be developed for the design and construction works to the contrary that the base of this area be matured already in the several sub-areas. 3. For the successful work of Environmental Restoration, defining the new industrial branch -independent from existing construction industry- is recommended through the law system under the control of the Ministry of Environment. It will be better if professional officer system in governmental organization could follow up this. 4. Educational organization and Technical expert qualifying system to train the Ecological Restoration Professionals should be induced for the effective practice of the area.
Journal of the Korea Society of Computer and Information
/
v.26
no.7
/
pp.103-108
/
2021
In this paper, we an empirical study of the effects of control types on Tie strength and filed project performance of project participants in field project organization for Korean domestic construction industry. In the study, we try to tell what significant impact output control, process control and tie strength among field project participants have on field project performance and features unique to field project organization for Korean construction industry through empirical analysis. And the findings of the empirical analysis are that output control appeared to have significant impacts on tie strength among the participants and process control, and process control also appear to have significant impact on field project performance.
Journal of Korean Association for Spatial Structures
/
v.18
no.1
/
pp.67-75
/
2018
Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.
International conference on construction engineering and project management
/
2005.10a
/
pp.1212-1215
/
2005
Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, several construction companies in the USA are starting to implement lean construction with nebulous hopes of obtaining better results from their current projects than from past projects not employing lean construction. There are many difficulties in adopting lean concepts and systems into construction projects and implementing lean construction in real construction sites. Thus, there are demands to share information how other companies implement lean construction, to identify the benefits and barriers of lean implementation in the construction fields, and finally to improve their lean implementation. This study was the first exploratory study to assess lean construction implementation on overall projects. The case studies carried out the examination of the mutual relationships of lean planning systems, organization structure, attitudes of project participants and company strategy which played major influences on successful lean implementation
Today, many companies have introduced an ERP system - an enterprise resources planning - in order to improve corporate credibility through transparent management and for quick responses to market situations through quick decision making. After the construction of an ERP system, many companies are having difficulty in calculating the appropriate number of personnel required for running the system because of a lack of standard for doing so, as well as a lack of pertinent procedures. As a result, the companies are having to resort to a trial-and-error approach. Therefore this paper studied a model for calculating the appropriate number of personnel required for efficiently running an ERP system after its construction, as well as for constantly meeting its performance targets. The developed model was applied empirically to calculate an appropriate number of personnel required, and an organization was set up according to this. Therefore, the purpose of this study was to present an optimized model for calculating the number of personnel required for operating an ERP system, that which addresses problems of existing models, in order to help companies organize the operation personnel and its size, as well as to provide more objectivity to the calculated number of personnel required and to improve credibility.
Kim, Sang-Won;Choi, Yu-Jin;Hong, Seong-Wook;Ahn, Tae-Han
Proceedings of the Korean Institute of Building Construction Conference
/
2017.05a
/
pp.95-96
/
2017
A total of eleven keywords for construction project management engineers to know about safety are as follows. Before the construction, there are two keywords as the safety organization plan and safety management plan, safety compliance, document beach, safety check, safety management fee, hazardous risk prevention plan, safety education, safety accident, seven keywords, There are two keywords of safety inspection comprehensive report, safety management document. It is necessary to understand the keywords well in accordance with the relevant time and to do the best in safety work, and it should be recognized that safety inspection is carried out every month and the safety work should be done faithfully.
International conference on construction engineering and project management
/
2009.05a
/
pp.558-565
/
2009
In recent years, the demand for green buildings is growing fast due to legislative and social pressures. Construction organizations, which play an important role in promoting building industry growth, are facing with challenges on how to adapt themselves to enhance sustainability of the buildings. In this paper, the green value chain and system frameworks, an extend application of Porter's value chain and system models, are introduced. Based on deep analysis of the green value chain and system frameworks, a revolution model for construction organizations towards green building is created. Management factors critical for a successful green building project, at the firm and project organization level, are extracted. Furthermore, external critical relationships are also identified. Fully understanding of these management factors and the model can help and enable practitioner to know what new capabilities should be deployed and developed in the long run for maximizing sustainability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.