• Title/Summary/Keyword: Construction Noise and Vibration

Search Result 587, Processing Time 0.02 seconds

Liquefaction Prevention and Damage Reduction Effect of Reinforcement by Sheet Pile Using 1-G Shaking Table Test (1-G 진동대 실험을 이용한 시트파일 보강재의 액상화 및 피해 방지 효과)

  • Sim, Sung Hun;Yoon, Jong Chan;Son, Su Won;Kim, Jin Man
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.24 no.5
    • /
    • pp.211-217
    • /
    • 2020
  • Earthquake preparedness has become more important with recent increase in the number of earthquakes in Korea, but many existing structures are not prepared for earthquakes. There are various types of liquefaction prevention method that can be applied, such as compaction, replacement, dewatering, and inhibition of shear strain. However, most of the liquefaction prevention methods are applied before construction, and it is important to find optimal methods that can be applied to existing structures and that have few effects on the environment, such as noise, vibration, and changes in underground water level. The purpose of this study is to estimate the correlation between the displacement of a structure and variations of pore water pressure on the ground in accordance with the depth of the sheet file when liquidation occurs. To achieve this, a shaking table test was performed for Joo-Mun-Jin standard sand and an earth pressure, accelerometer, pore water pressure transducer, and LVDT were installed in both the non-liquefiable layer and the liquefiable layer to measure the subsidence and excess pore water pressure in accordance with the time of each embedded depth. Then the results were analyzed. A comparison of the pore water pressure in accordance with Hsp/Hsl was shown to prevent lateral water flow at 1, 0.85 and confirmed that the pore water pressure increased. In addition, the relationship between Hsp/Hsl and subsidence was expressed as a trend line to calculate the expected settlement rate formula for the embedded depth ratio.

Continuous force excited bridge dynamic test and structural flexibility identification theory

  • Zhou, Liming;Zhang, Jian
    • Structural Engineering and Mechanics
    • /
    • v.71 no.4
    • /
    • pp.391-405
    • /
    • 2019
  • Compared to the ambient vibration test mainly identifying the structural modal parameters, such as frequency, damping and mode shapes, the impact testing, which benefits from measuring both impacting forces and structural responses, has the merit to identify not only the structural modal parameters but also more detailed structural parameters, in particular flexibility. However, in traditional impact tests, an impacting hammer or artificial excitation device is employed, which restricts the efficiency of tests on various bridge structures. To resolve this problem, we propose a new method whereby a moving vehicle is taken as a continuous exciter and develop a corresponding flexibility identification theory, in which the continuous wheel forces induced by the moving vehicle is considered as structural input and the acceleration response of the bridge as the output, thus a structural flexibility matrix can be identified and then structural deflections of the bridge under arbitrary static loads can be predicted. The proposed method is more convenient, time-saving and cost-effective compared with traditional impact tests. However, because the proposed test produces a spatially continuous force while classical impact forces are spatially discrete, a new flexibility identification theory is required, and a novel structural identification method involving with equivalent load distribution, the enhanced Frequency Response Function (eFRFs) construction and modal scaling factor identification is proposed to make use of the continuous excitation force to identify the basic modal parameters as well as the structural flexibility. Laboratory and numerical examples are given, which validate the effectiveness of the proposed method. Furthermore, parametric analysis including road roughness, vehicle speed, vehicle weight, vehicle's stiffness and damping are conducted and the results obtained demonstrate that the developed method has strong robustness except that the relative error increases with the increase of measurement noise.

An Experimental Study on the Reinforcement Effect of Installed Micropile under Footing on Dense Sand (조밀한 모래지반의 기초하부에 설치된 마이크로파일 보강효과에 관한 실험적 연구)

  • Lee, Tae-Hyung;Im, Jong-Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3C
    • /
    • pp.191-200
    • /
    • 2006
  • The micropile, which is a kind of the in-situ manufactured pile with small diameter of 100~300mm, is constructed by installing a steel bar or pipe and injecting grout into a borehole. The application fields of micropile are being gradually expanded in a limited space of down-town area, because the micropile has various advantages with low vibration and noise in method and compact size in machine, etc. Mostly, the micropile has been applied to secure the safety of structures, depending on the increment of bearing capacity and the restraint of displacement. The micropile is expected to be used in various fields due to its effectiveness and potentiality in the future. The model test, focused on the interaction between micropile and soil in this study, was carried out. The micropile is installed under footing(concept of "structure supporting"). With the test results and soil deformation analysis, the reinforcement effect(relating to bearing capacity and settlement) was analysed in a qualitative and quantitative manner, respectively. Consequently, it is hoped to demonstrate the improvement of an efficiency and application in the design and construction of micropile.

Improvement for Marine Environmental Impact Assessment on the Development of Offshore Wind Power (해상풍력개발사업의 바다환경영향평가 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.1
    • /
    • pp.1-13
    • /
    • 2012
  • We diagnosed on status and problems of environmental assessment regarding development of offshore wind power, and also on reasonable core assessment items. Most of the coastal wind power are located on the western coastline of Korea and Jeju Island. In the selections of the site for the offshore wind farms, a previous investigations should be conducted with regard to distances from the land, stabilities from external forces (tide, wave, etc.) and topographical changes, and characteristics of the surroundings (distributions of protected area, fishing ground, artificial seagrasses, and shipping traffic). It is needed to assess dispersion of suspended solids, changes of the sea bottom, and impacts on fisheries resources and fishing activities under construction of offshore wind power. Furthermore, the responses of marine organisms to noise and vibration, impacts by electromagnetic fields, impacts on sea birds, hindrances to sea lane routes, and damaged scenery and marine protection areas are thoroughly assessed during operation processes. The consultation criteria in case of development of offshore wind farm is adjusted by focusing marine environmental impact assessment.

A Study on the Analysis of Environmental Hazards when Dismantling Non-Structure of Old Residential Buildings (노후 주거용 건축물 비구조체 해체 시 환경유해인자 분석)

  • Son, Byeung-Hun
    • Journal of Urban Science
    • /
    • v.10 no.1
    • /
    • pp.29-37
    • /
    • 2021
  • The number of old buildings older than 30 years in Korea continues to increase from 29.9% in 2005 to 38.8% in 2020. Considering the growing urban regeneration projects, urban maintenance projects, the suppression of urban expansion, and the lack of idle land in the city, the dismantling of old buildings is expected to increase further in the future. As major accidents at building dismantling sites continue to occur, related agencies are also strengthening safety management of building dismantling works. While physical safety management such as collapse and fall is strengthened, there is a relative lack of interest in the health of workers at dismantling sites due to environmental hazards. Since relevant laws stipulate that construction waste should be separated and discharged, old buildings need to be considered for environmental hazards such as fine dust, floating bacteria, and floating molds when dismantling. In this study, we intend to find important safety management elements in the management of building dismantling sites, measure environmental factors harmful to dismantling workers, and present basic data for the management of dismantling sites in the future. "Safety management" was the highest priority, followed by "dust," "vibration," "noise," "bacteria," and "smell." The perception of the importance of "physical damage prevention" with workers working on dismantling and managers managing the site came out similar, but the perception of "work efficiency" and "health disorder prevention" through environmental hazard management showed different priorities. In the process of dismantling, floating bacteria and floating mold were collected, cultured, and measured the concentration in the indoor air. The measurement was measured by dividing it into pre-dismantling and during dismantling.

An Experimental Study on the Reinforcement Effect of Installed Micropiles in the Surround of Footing on Dense Sand (조밀한 모래지반의 기초 인접에 설치된 마이크로파일 보강효과에 관한 실험적 연구)

  • Lee Tae-Hyung;Im Jong-Chul
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.5
    • /
    • pp.69-81
    • /
    • 2006
  • The micropile, which is a kind of the in-situ manufactured pile with small diameter of $150\sim300mm$, is constructed by installing a steel bar or pipe and injecting grout into a borehole. The application fields of micropile are being gradually expanded in a limited space of down-town area, because the micropile has various advantages with low vibration and noise in method and compact size in machine, etc. Mostly, the micropile has been applied to secure the safety of structures, depending on the increment of bearing capacity and the restraint of displacement. The micropile is expected to be used in various fields due to its effectiveness and potentiality in the future. The model test, focused on the interaction between micropile and soil in this study, was carried out. The micropile is installed in a soil adjacent to footing (concept of 'soil reinforcement'). With the test results and soil deformation analysis, the reinforcement effect (relating to bearing capacity and settlement) was analysed in a qualitative and quantitative manner, respectively. Consequently, it is expected that we nay demonstrate the improvement of an efficiency and application in the design and construction of micropile.

Weight setting of major environmental assessment items using Analytical Hierarchy Process - Case for the selection of railroad route - (계층분석법을 통한 환경영향평가 중점항목의 가중치 설정 - 철도사업 노선선정을 대상으로 -)

  • Lee, Minjoo;Kim, Minkyung;Lee, Sangdon
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.6
    • /
    • pp.517-526
    • /
    • 2014
  • This paper performed studies on a guide for an environmental assessment necessary to select railroad route optimally, and presented techniques for an environmental friendly route selection using AHP(Analytical Hierarchy Process) as an objective method. The AHP is an approach to decision making that involves multiple choice criteria into a hierarchy and assessing the relative importance of each criterion, and determining an overall ranking of the alternatives. For the purpose of this study, we established the weight and the order of major environmental assessment items based on the survey of experts. The results of the weight by AHP were in order of Fauna & Flora, Topography & Geology, Nature Environmental Assets, Noise & Vibration, Water Quality, Landscape and Air Quality indicating natural environment should be in priority. To develop the more efficient environmental friendly route selection systems, it is necessary to consider economical, technical, and social aspects in addition to environmental consideration.

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance (TBM 굴진향상을 위한 연속굴착형 TBM 부품개조 및 제어기술 소개)

  • Young-Tae, Choi;Dong-Geon, Lee;Mun-Gyu, Kim;Joo-Young, Oh;Jung-Woo, Cho
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.345-352
    • /
    • 2022
  • The existing NATM (New Austrian Tunneling Method) has induced civil compliants due to blasting vibration and noise. Machanized excavation methods such as TBM (Tunnel Boring Machine) are being adopted in the planning and construction of tunneling projects. Shield TBM method is composed of repetition processes of TBM excavation and segment installation, the machine has to be stopped during the later process. Consecutive excavation technology using helical segment is under developing to minimize the stoppage time. The modification of thrust jacks and module are planned to ensure the advance force acting on the inclined surface of helical segment. Also, the integrated system design of hydraulic circuit will be remodeled. This means that the system deactivate the jacks on the installing segment while the others automatically act the thrusting forces on the existing segments. This report briefly introduces the mechanical research part of the current consecutive excavation technological development project of TBM.

A Case Study of Blasting with Electronic Detonator (전자뇌관을 활용한 발파 시공 사례)

  • Hwang, Nam-Sun;Lee, Dong-Hoon;Lee, Seung-Jae
    • Explosives and Blasting
    • /
    • v.34 no.4
    • /
    • pp.40-45
    • /
    • 2016
  • Sites, where explosives are used, are constantly under constraint of vibration and noise levels. If a sensitive area is located nearby the sites, mechanical excavation has been preferred rather than blasting. Recently, however, blasting using electronic detonators is applicable in the areas, where previously should be excavated by mechanical methods. $HiTRONIC^{TM}$ is a fourth-generation detonator that utilizes Hanwha Corporation's advanced electronic technology. The detonator contains IC-Chip, which allows delay times between 0~15,000ms with 1ms interval. Furthermore, the product can provide high accuracy(0.01%) for accurate-blasting. Electronic detonator is widely used in highway and railway construction sites, large limestone quarries, and other works. In this paper, several sites, in which HiTRONIC was used, are introduced in order to enhance understanding of electronic detonator.